French lunatics, who got caught in the fallout?

French lunatics, who got caught in the fallout?

Author
Discussion

StuntmanMike

Original Poster:

11,671 posts

151 months

Saturday 18th July 2015
quotequote all
Knobheads in the tunnel, plus there are two less operator doing Dover / Calais, Myferrylink has finish thanks to the British competitions monopoly lot ( wkers ), because DFDS have bought ( or were buying ) the Rodin and Berloiz but sacking the French crew, those two boats are moored in the DFDS berths, and they say they have food for a month, the word is they have poured bags of cement into the engines as well ( that could be just typical drivers room bullst).

jagracer

8,248 posts

236 months

Sunday 19th July 2015
quotequote all
StuntmanMike said:
Knobheads in the tunnel, plus there are two less operator doing Dover / Calais, Myferrylink has finish thanks to the British competitions monopoly lot ( wkers ), because DFDS have bought ( or were buying ) the Rodin and Berloiz but sacking the French crew, those two boats are moored in the DFDS berths, and they say they have food for a month, the word is they have poured bags of cement into the engines as well ( that could be just typical drivers room bullst).
Apparently a more subtle way of fking a diesel engine up is to pour some Adblue in the diesel tank. Mate of mine says he's used Dover a couple of times over the last few weeks and the boats have been going out with plenty of spare capacity.

grumpy52

5,577 posts

166 months

Sunday 19th July 2015
quotequote all
Stack lifted this morning , but the next busy day is usually Wednesdays of each week so I would expect it to be back in place then , also all the rest of schools finish on the 23rd with all the implications that brings .
You can imagine the frustration we suffer being based on the A2 on the outskirts of Dover , most of our work involves crossing the puddle .

jagracer

8,248 posts

236 months

Tuesday 21st July 2015
quotequote all
aaannnd they're off again, no doubt op stack will be in place within the hour. That's fked my trip to France next week.

grumpy52

5,577 posts

166 months

Wednesday 22nd July 2015
quotequote all
2 miles plus of trucks on the A20 heading into Dover on monday night/ tuesday morning , this was not helped by the M2 coastbound being closed overnight .Today op stack in place again.
Now the frogs want us to pay for more work to help solve the problem in Calais/Coquelles !

Blue32

438 posts

169 months

Wednesday 22nd July 2015
quotequote all
Just driven back from Dover after holiday in France, I feel sorry for all the guys stuck in their trucks on the M20. It looks like they are going to spend a long time stuck there.

Just as the ferry I was on left Calais (45 min late due to earlier disruption), the crew from the 2 MyFerrylink ships were sailing around the port in some of the lifeboats. Not sure if they were trying to disrupt port movements or just make a point that they were still there.

Noticed DFDS were now loading/ unloading in Calais, thought they were staying away from Calais so the port stayed open?

grumpy52

5,577 posts

166 months

Thursday 23rd July 2015
quotequote all
Op stack expected to be in place until sunday .
There is a lot of grumbling locally about the disruption of everyday life in the local area , many journeys on local roads that would normally take 15-20 mins are now taking a couple of hours .
Many local events near the M20 are looking at being disrupted or poorly attended due to problems moving about the county .

StuntmanMike

Original Poster:

11,671 posts

151 months

Friday 24th July 2015
quotequote all
This week again, seems to be part of the job now, boss is getting the bkache with it all.

dav123a

1,220 posts

159 months

Friday 31st July 2015
quotequote all
Possibly daft question that was touched on earlier. Why do trunk companies not use the other ports in the south east while stack is on ? Is it a cost issue cheaper to have a driver in Stack for 4\5 hours than the cost of crossing the channel elsewhere ? Or capacity at other ports ? Wondered is it something else ?

Chipchap

2,588 posts

197 months

Saturday 1st August 2015
quotequote all
dav123a said:
Possibly daft question that was touched on earlier. Why do trunk companies not use the other ports in the south east while stack is on ? Is it a cost issue cheaper to have a driver in Stack for 4\5 hours than the cost of crossing the channel elsewhere ? Or capacity at other ports ? Wondered is it something else ?
A few things affect this:-

The longer the crossing the higher the fare and the productivity time of the truck is reduced.

The driver may have an issue with driving or working hours at some point in his week due to longer crossing.

If you sail to a more southerly port that is fine if you were going south but if you were not then its added miles/time etc

These things do around 10mpg and tyres last maybe 150,000 on drive axle so every mile run is huge cost.

A smile

dav123a

1,220 posts

159 months

Saturday 1st August 2015
quotequote all
Is this the case when operation stack is on though ?

iva cosworth

44,044 posts

163 months

Saturday 1st August 2015
quotequote all
I guess Op stack is so unpredictable that they just take their chances and hope to be out of here ASAP.