500bhp lotus S1 Exige build...
Discussion
annettej said:
Wow - this car was our first ever Exige, we had it from new but the throttle kept jamming and eventually Lotus took it back and replaced it after it tried to kill me one too may times. Amazing to see what it has become, it's fab!!
(Have to say I loved the original Nautilus Blue colour though - more than the orange ...)
Interesting, I bought it from a guy called Damian Murray at the end of 2008.(Have to say I loved the original Nautilus Blue colour though - more than the orange ...)
Small update, Darrens new unit was finally at a stage where I could move the car from my mums.
Hopefully now we can start (slowly) to make some progress, I'll be popping over when I can to start putting the clams back together with new lights and seals etc.... Darren will when he can start work on the engine and new billet CC, the gear shift mech will be swapped out for the newer version and colour coded.
Hopefully now we can start (slowly) to make some progress, I'll be popping over when I can to start putting the clams back together with new lights and seals etc.... Darren will when he can start work on the engine and new billet CC, the gear shift mech will be swapped out for the newer version and colour coded.
Now that Darren's unit is finally finished I found a spare weekend to at least start screwing things back together....
Clam off....
Lights in....
New driving lights and brackets...
Splitter refitted....
New door seals....
Doors finished, wing mirrors fitted...
Canards refitted and clam on.....
New LED rear lights, I'm going to change the decals to black, the grey just looks washed out....
Couldn't get the extended front splitter and side cills fitted as the air jack system is not currently operating, job for the next visit, hoping the engine will be ready by mid October.
Clam off....
Lights in....
New driving lights and brackets...
Splitter refitted....
New door seals....
Doors finished, wing mirrors fitted...
Canards refitted and clam on.....
New LED rear lights, I'm going to change the decals to black, the grey just looks washed out....
Couldn't get the extended front splitter and side cills fitted as the air jack system is not currently operating, job for the next visit, hoping the engine will be ready by mid October.
So had a day on the car at the weekend, stickers changed to black and fitted the stone guards.
Getting the new grille to fit was an absolute pig, lots of fettling the mount brackets for the driving lights to get everything centred.
Then final job of the day was removal of the subframe...
This will be powder coated along with the longerons, I have a pair of new ones as well in case they look crap black.
Getting the new grille to fit was an absolute pig, lots of fettling the mount brackets for the driving lights to get everything centred.
Then final job of the day was removal of the subframe...
This will be powder coated along with the longerons, I have a pair of new ones as well in case they look crap black.
Unfortunately this project stalled a little due to work commitments from both me and darren
I have however been collecting various parts including new lotus carbon seats....
However before they were even fitted these came up for sale and with the yellow stitching they were deemed a better match ...
Darren finally found time to fit the liners into the block and last Friday the engine finally is on its way to Automek to be built up....
The main reason it’s not been close to completion is that I decided to rip out the omex and dash2, will now be the wired with a full motec installation, fingers crossed the engine will be back early January and things will start to come together a little quicker!
I have however been collecting various parts including new lotus carbon seats....
However before they were even fitted these came up for sale and with the yellow stitching they were deemed a better match ...
Darren finally found time to fit the liners into the block and last Friday the engine finally is on its way to Automek to be built up....
The main reason it’s not been close to completion is that I decided to rip out the omex and dash2, will now be the wired with a full motec installation, fingers crossed the engine will be back early January and things will start to come together a little quicker!
Not much to report, but the new monoblock shifter is finally nearing production, first one in the CNC machine today....
https://www.instagram.com/p/B9RUXoGnJ9O/?igshid=18...
https://www.instagram.com/p/B9RUXoGnJ9O/?igshid=18...
Gassing Station | Readers' Cars | Top of Page | What's New | My Stuff