Undressing Kate, my Chim 430 resto.
Discussion
It feels like ages since I posted anything.
Well the update is this, everything stripped, all bushes removed. That's it.
Come Monday its go go go.
The chassis and the pile above get dropped off Monday for their first blast to see what's save-able.
The engine also gets dropped off Monday for its strip, inspection and rebuild and money allowing a few new bits
And finally the seats, tunnel top, dash and door cards are dropped off for a re-trim.
So even though I've done very little, I've been busy
Well the update is this, everything stripped, all bushes removed. That's it.
Come Monday its go go go.
The chassis and the pile above get dropped off Monday for their first blast to see what's save-able.
The engine also gets dropped off Monday for its strip, inspection and rebuild and money allowing a few new bits
And finally the seats, tunnel top, dash and door cards are dropped off for a re-trim.
So even though I've done very little, I've been busy
First blast done and primer to protect while repairs are carried out.
All is looking good, except the outriggers obviously, only a couple of spots for a closer look.
And welds that have small holes.
And a clean look at the body filler corner.
And finally for the pictures chassis number and a second ID plate, what's the second number ?
All is looking good, except the outriggers obviously, only a couple of spots for a closer look.
And welds that have small holes.
And a clean look at the body filler corner.
And finally for the pictures chassis number and a second ID plate, what's the second number ?
Hey Ged
A lot of things happening but not much going on is the long and short of it.
Engine away, hopefully gearbox too soon, interior away, body away in 3 weeks, outriggers still a work in progress.
So loads happening but very little by me.
Main sticking point and hold up is the outriggers. Seen/spoken to about 15 welders/fabricators/engineers and no one wanted to carry out the work or take responsibility if they did it wrong. I was close to packing it all in and selling off parts but a week ago I gave myself a shake, phoned some friends (OC42, Mark_S_24, Marcus1875) and came up with a bit of an unconventional plan. Pictures to follow if it works.
All going well chassis will be done by the end of the month and back on its wheels.
I see you've been marching on really well.
Cokes
A lot of things happening but not much going on is the long and short of it.
Engine away, hopefully gearbox too soon, interior away, body away in 3 weeks, outriggers still a work in progress.
So loads happening but very little by me.
Main sticking point and hold up is the outriggers. Seen/spoken to about 15 welders/fabricators/engineers and no one wanted to carry out the work or take responsibility if they did it wrong. I was close to packing it all in and selling off parts but a week ago I gave myself a shake, phoned some friends (OC42, Mark_S_24, Marcus1875) and came up with a bit of an unconventional plan. Pictures to follow if it works.
All going well chassis will be done by the end of the month and back on its wheels.
I see you've been marching on really well.
Cokes
A local company to me http://www.engineservicesandcomponents.com
Gassing Station | Chimaera | Top of Page | What's New | My Stuff