Hi All, After all the work in the house (2 Months)I am back in the workshop.
First job is to finish the plenum so I can make sure the bonnet will fit, had to replace the intercooler as it should have been 600 X 300 X100 but turned out to be 315, so that will go back today and they are sending one @ 290 ( just 1 left from a order).
Was going in for paint October but she wanted a new kitchen and a door moving and a wall taken down.
So I never liked welding on a 3' table or standing up (it's the legs at my age) so I have a 3' face plate off the old big lathe still in the workshop, so bit of 100mm tune and a new table.
New table
First Job
Just to clamp, tack and weld
Alan
First job is to finish the plenum so I can make sure the bonnet will fit, had to replace the intercooler as it should have been 600 X 300 X100 but turned out to be 315, so that will go back today and they are sending one @ 290 ( just 1 left from a order).
Was going in for paint October but she wanted a new kitchen and a door moving and a wall taken down.
So I never liked welding on a 3' table or standing up (it's the legs at my age) so I have a 3' face plate off the old big lathe still in the workshop, so bit of 100mm tune and a new table.
New table
First Job
Just to clamp, tack and weld