An absolute f***ing joke.
We have had to put up with this st which was (according to the last sign I read) due to finish December 2016, now it's summer 2017.

http://www.gethampshire.co.uk/news/local-news/m3-s...

couzens

516 posts

142 months

Wednesday 23rd March 2016
quotequote all
And it will still be three lanes of patchy potholed tarmac.

Bluehawk

494 posts

166 months

Wednesday 23rd March 2016
quotequote all
I'm not surprised it's taking so long...I've never actually seen anyone doing any work!

FurtiveFreddy

8,577 posts

237 months

Wednesday 23rd March 2016
quotequote all
"during more than a million man hours of work".

Maybe they shipped in a million men and they all did an hour one night when no-one was looking?

There was a massive pothole in lane 2 between J3 and J4 I didn't see the other day which nearly took my OS front wheel off!

Quoted for posterity:

"the additional construction should mean it would not need to carry out any future scheduled maintenance work for five years after completion"

Ohrolleyes right

Edited by FurtiveFreddy on Wednesday 23 March 10:24

SVTRick

3,633 posts

195 months

Wednesday 23rd March 2016
quotequote all
FurtiveFreddy said:
"during more than a million man hours of work".

Maybe they shipped in a million men and they all did an hour one night when no-one was looking?

There was a massive pothole in lane 2 between J3 and J4 I didn't see the other day which nearly took my OS front wheel off!

Quoted for posterity:

"the additional construction should mean it would not need to carry out any future scheduled maintenance work for five years after completion"

Ohrolleyes right

Edited by FurtiveFreddy on Wednesday 23 March 10:24
Try claiming for that one, how can you stop and photograph it and get some dimensions.
Anything over 40mm deep is classed as requiring emergency attention.
I claimed twice for pothole damage from SCC Higbways and both times got paid in full within 3 months
but you need photos and some information on the offending hole.
Perhaps we need a "wksy" to go around a spray them up.

http://www.telegraph.co.uk/men/the-filter/11570595...


krisdelta

4,566 posts

201 months

Thursday 24th March 2016
quotequote all
Wonderful news.. it can make or break a journey so much that I now avoid it at all costs (and I live 2 miles from junction 4a) and go cross country to the M25 at Chertsey.

Mr Tidy

22,250 posts

127 months

Friday 25th March 2016
quotequote all
To be honest I don't think it will make much difference!

Speed limit when they finish it will probably never be more than 50, if the M25 J12 to J11 is anything to go by!

I tend to use the A331 and A31 to get to the A3 now to avoid the pain of the M3 and the stretch of M25 I mentioned.

Lately I have been round Chertsey quite often coming home because the signs say the M3 is shut.....but when I cross it it's open. Hopeless!

DJT

231 posts

161 months

Friday 1st April 2016
quotequote all
Nooooo!

2 1/4 years was already too long. So basically, it's going to take nearly as half as long as WWII to re-tarmac a hard shoulder, erect some LED signs and re-paint the lines. (Strange analogy I know, but I can't help thinking about all the amazing infrastructure feats achieved when there was a will and means to do so). Now we seem to undertake these infrastructure projects with a kind of hobbyist attitude - we'll get a bit done when time allows. Depressing.

eybic

9,212 posts

174 months

Friday 1st April 2016
quotequote all
I remember driving to pick up my newly born Son in November '14 thinking, "he'll be nearly 2 when these works have finished"

DJT

231 posts

161 months

Friday 1st April 2016
quotequote all
eybic said:
I remember driving to pick up my newly born Son in November '14 thinking, "he'll be nearly 2 when these works have finished"
Who knows, he could be driving!

eybic

9,212 posts

174 months

Friday 1st April 2016
quotequote all
DJT said:
eybic said:
I remember driving to pick up my newly born Son in November '14 thinking, "he'll be nearly 2 when these works have finished"
Who knows, he could be driving!
laugh

FurtiveFreddy

8,577 posts

237 months

Friday 1st April 2016
quotequote all
DJT said:
eybic said:
I remember driving to pick up my newly born Son in November '14 thinking, "he'll be nearly 2 when these works have finished"
Who knows, he could be driving!
By the time the works have finished, he won't be driving.

He'll be in a Tesla 3 on autopilot.

Trevatanus

Original Poster:

11,120 posts

150 months

Friday 1st April 2016
quotequote all
I think the thing that annoys me more than anything about this extension is the "spin" that's being put on it.
Are they really trying to have us believe that halfway through a project, which had presumably been planned by "planning professionals" that someone suddenly said, "hang on lads, I've got a great idea!"
Of course not, the project is running behind time, and they came up with this to make us feel that they are doing is a massive favour.

SVTRick

3,633 posts

195 months

Saturday 2nd April 2016
quotequote all
Trevatanus said:
I think the thing that annoys me more than anything about this extension is the "spin" that's being put on it.
Are they really trying to have us believe that halfway through a project, which had presumably been planned by "planning professionals" that someone suddenly said, "hang on lads, I've got a great idea!"
Of course not, the project is running behind time, and they came up with this to make us feel that they are doing is a massive favour.
Someone at last thinking outside of the box.. smile

Should have just left the fking M3 alone.
wait till (well if) the Thiefrow expansion goes ahead.. !!
Years of M25 and everywhere for 30 miles radius misery will happen
Don't get me started on HS2 who the fk needs an express rail link - upgrade what's already there.
Tory spin on the lot. wkers


Mr Tidy

22,250 posts

127 months

Saturday 2nd April 2016
quotequote all
I'm in a good mood tonight!

But I won't comment on the M3 F*ck-up (ooops, just gave a clue)!

Anyway based on the previous post I could confirm it is all a load of b*llocks - must have been some tax-payers' generosity looking for a home before the next financial year-end!!

How many Motorways does this part of the UK have? 2% for 10+% of the population on a good day? - FFS build some more, Tw*ts!!!!

We don't need another f*cking North/South railway; most normal voters will never use it, although it may be useful for the snout in the trough pigs we elect by accident/default to enable them to appear from time to time in the areas they claim to represent! Especially as we will pay for it in their expenses!

Those of us who fund this sort of nonsense with no say about how it is implemented may not be impressed!!!

I'm getting on a bit - I may see the M3 J4 to J2 without roadworks finished before I die, but will never ever see it with a 70 limit again (based on my experience of the M25 J12 to J10 variable stretch policed by the misery officers who just like to see it f*cked-up every day)!

Bracknell Forest is a F*cking miserable sh*thole to live in (wish my MP Dr Phillip Lee had to experience this, but he doubtless lives elsewhere) as I would if I had an income like his!!!!!


2gins

2,839 posts

162 months

Wednesday 13th April 2016
quotequote all
DJT said:
Nooooo!

2 1/4 years was already too long. So basically, it's going to take nearly as half as long as WWII to re-tarmac a hard shoulder, erect some LED signs and re-paint the lines. (Strange analogy I know, but I can't help thinking about all the amazing infrastructure feats achieved when there was a will and means to do so). Now we seem to undertake these infrastructure projects with a kind of hobbyist attitude - we'll get a bit done when time allows. Depressing.
They have to spend an hour at the start of each shift reading through the risk assessments and method statements, then it's tea break. It's how we work these days. Keep up!

Trevatanus

Original Poster:

11,120 posts

150 months

Wednesday 13th April 2016
quotequote all
krisdelta said:
Wonderful news.. it can make or break a journey so much that I now avoid it at all costs (and I live 2 miles from junction 4a) and go cross country to the M25 at Chertsey.
You fell into the trap.
About 5 years ago there was a high level DOT meeting:

"Lads, how can we sort out the traffic issues on the M3"
"Let's spend £134 million pounds pretending to improve it, but drag out the job so long people start to avoid it like the plague, and get used to using other routes, thereby making it less busy when we eventually finish"
"Good idea! That's settled then. Is it lunch time yet?"


Dizeee

18,270 posts

206 months

Thursday 14th April 2016
quotequote all
DJT said:
Nooooo!

2 1/4 years was already too long. So basically, it's going to take nearly as half as long as WWII to re-tarmac a hard shoulder, erect some LED signs and re-paint the lines. (Strange analogy I know, but I can't help thinking about all the amazing infrastructure feats achieved when there was a will and means to do so). Now we seem to undertake these infrastructure projects with a kind of hobbyist attitude - we'll get a bit done when time allows. Depressing.
Its all down to H and S.

RemyMartin

6,759 posts

205 months

Thursday 14th April 2016
quotequote all
Dizeee said:
DJT said:
Nooooo!

2 1/4 years was already too long. So basically, it's going to take nearly as half as long as WWII to re-tarmac a hard shoulder, erect some LED signs and re-paint the lines. (Strange analogy I know, but I can't help thinking about all the amazing infrastructure feats achieved when there was a will and means to do so). Now we seem to undertake these infrastructure projects with a kind of hobbyist attitude - we'll get a bit done when time allows. Depressing.
Its all down to H and S.
Not always the case. The contractor will know that they couldn't have met the demands very early on so would have put in as many hurdles so they can legitimately overun and not be fined. A reliable friend who deals with company's like Contain etc say the practise is rife. Playing up to H and S setpoints and working the system in place. Personally speaking I think the industry needs a reworking. To many morons who didn't try hard in life because they were lazy. Now labouring because it's all these social parasites can do. Of course they are lazy and lackadaisical, it's all they know

Disclaimer I don't actually think they are parasites. They are s though.

DJT

231 posts

161 months

Monday 18th April 2016
quotequote all
I had the usual misfortune to recently get caught in a jam for the length of the northbound roadworks. A repeating sight was one employeee in a digger/roller/etc. along with three hi-viz clad employees and maybe a clipboard or two watching. That's a 300% H&S overhead for many activities.

Worse still, down near J4/J4a there was a crew of workers boarding a minibus to take them to their part of the site to start work. We pretty much travelled the length of the roadworks side-by-side. Me queueing, them navigating men in diggers with their associated fan clubs/groupies.

Now, bear in mind I was held up in that section for nearly an hour (09:00 - 10:00). So it took the van crew the best part of that to get to their place of work. I can only assume that, come 15:00 they need to start getting ready for the return trip!