M4 Junctn 10 roadworks

Author
Discussion

silverfoxcc

Original Poster:

7,683 posts

144 months

Saturday 15th October 2016
quotequote all
Just noticed in the local rag that there will be 12 months of slip road closures as the link bridges are improved.
It says during the works there will be 'single narrow lanes' on the slip roads with a 40 mph limit. Err are they not already single narrow lanes??????????

The main M4 and A329(M) will not be affected

Puggit

48,355 posts

247 months

Monday 17th October 2016
quotequote all
Main M4 will be heavily affected when the Smart Motorway works start.

For 5 years...