1:250 Scale Paper Model: Multi-Purpose Vessel "Mellum"

1:250 Scale Paper Model: Multi-Purpose Vessel "Mellum"

Author
Discussion

dr_gn

Original Poster:

16,177 posts

185 months

Friday 22nd April 2016
quotequote all
Fitted the second intermediate deck and the corresponding cabin front. Currently weighted down while the glue sets:


dr_gn

Original Poster:

16,177 posts

185 months

Thursday 5th May 2016
quotequote all
Got another deck and cabin installed, plus a stupidly complicated faceted...thing...below the top deck. Plus, of course, more steps:




dr_gn

Original Poster:

16,177 posts

185 months

Tuesday 10th May 2016
quotequote all
So here's...even more steps. This time built with the 'aid' of the cute little step jig:



As with the previous model, there's no indication of how to use it. If you assemble it as - apparently - intended, its too wide to be of any use since it's impossible to apply glue to the end of the treads without also applying it to the jig. If you use it as a single piece as I did, it doesn't really hole the treads in place.

Anyway here they are finished:



and fitted:



You might notice I had to extend them by one tread in order to get them to fit parallel with the other two flights already fitted. This model really is filled with small flaws that add up to be a real pain in the arse.

dr_gn

Original Poster:

16,177 posts

185 months

Tuesday 19th July 2016
quotequote all
Slow progress - working on this one evening a week. At least got the marker buoys and their mooring blocks pretty much done:


dr_gn

Original Poster:

16,177 posts

185 months

Wednesday 20th July 2016
quotequote all
perdu said:
Blimey doc, they are scary pieces of paper

Brilliant work thumbup
Just need some 1:250 chain now. The Wuppertal trawler had laser-cut card chain, but this one doesn't for some reason.

dr_gn

Original Poster:

16,177 posts

185 months

Monday 25th July 2016
quotequote all
Progress on the crane:


dr_gn

Original Poster:

16,177 posts

185 months

Sunday 31st July 2016
quotequote all
Crane winch, motor, gearbox and cage assembled and fitted to the jib, along with a start on the railings and luffing winch on the tower:


dr_gn

Original Poster:

16,177 posts

185 months

Sunday 31st July 2016
quotequote all
Turn7 said:
I reckopon you must have the patience of a saint.

That was me, the little bits would get stick to my fingers and anyhting else, then destryoyed getting them off...etc etc
It's more frustrating when things don't stick together...But overall once you get the hang of it it's not too bad.

dr_gn

Original Poster:

16,177 posts

185 months

Tuesday 2nd August 2016
quotequote all
More work on the crane gantry (now fixed in place)- railings, ladders & doors fitted, plus the crane mast spigot:


dr_gn

Original Poster:

16,177 posts

185 months

Wednesday 31st August 2016
quotequote all
Built up some deck containers, a generator unit, and the pollution control booms:



The truss structures are laser-cut card, the rest folded paper:




dr_gn

Original Poster:

16,177 posts

185 months

Saturday 8th October 2016
quotequote all
Finished the pollution control boom derrick fabrications, and their bases, plus a rear deck chimney:



Need to build the pivot blocks and hydraulic actuators next.

dr_gn

Original Poster:

16,177 posts

185 months

Tuesday 11th October 2016
quotequote all
Derricks and bases fitted tonight:


dr_gn

Original Poster:

16,177 posts

185 months

Thursday 13th October 2016
quotequote all
More deck/derrick fittings: capstans, winches, bollards, fenders:




dr_gn

Original Poster:

16,177 posts

185 months

Wednesday 26th October 2016
quotequote all
Boom derricks are now fitted with their hydraulic actuators, winch drums and ladders, plus some bollards and capstans installed on the rear deck. Also the chinmey and ducting adjacent to the port side crane gantry pillar.



I'd been putting off the last major structural assembly: The bridge "greenhouse", which is laser-cut card. As expected it was a complete pain in the arse to fit, in terms of it only fitted where it touched (not many places):



With a lot of cutting, bending and "it'll do"-ing I'm at the stage where with a bit more creasing and filling, plus some additional parts fitted around it, it will hopefully not look too bad. Still got the rear frameork to fit (which looked like it wouldn't be too tricky), the entire interior of the bridge, plus some acetate glazing, when I find something suitable.

dr_gn

Original Poster:

16,177 posts

185 months

Sunday 6th November 2016
quotequote all
Interior parts assembled:



And fitted into and around the cabin, along with the bridge control consoles, water deflectors and navigation lights (which are inexplicably supposed to be assembled differently, even though they are symmetrical port-stbd). In the end I made-up some missing parts and shoved them together:









Now for the glazing and roof fitting - which will be a pain, but hopefully the last thing that can pose a major issue.

dr_gn

Original Poster:

16,177 posts

185 months

Tuesday 8th November 2016
quotequote all
Fitted the glazing (scrap acetate from a chocolate fudge cake box). I had to cut 13 individual pieces to give me a bit of flexibility in the framework when fitting the roof. I wicked dilute PVA along the outside of all the frames, and it seems to have sealed any residual gaps, and dried pretty clear; the glazing doesn't show up very well in the photo, which I guess is a good sign. Also printed a navigation map of Helgoland and stuck it on the table:



Obviously, the roof didn't fit, the white parts at the back needed adding, and have now been painted green, along with all the other white edges. Luckily there is an angled fairing around this top edge, which will cover the modification, although i guess the fairing itself will not fit...:



Now to fit it.

dr_gn

Original Poster:

16,177 posts

185 months

Wednesday 9th November 2016
quotequote all
So after a load a faffing about with Tamiya tape, weights and wicking of PVA, the roof is on. I think the peripheral railings and fairings that are fitted next will hide the worst of the mis-matches:







That completes the main parts of the superstructure, now for the details.

dr_gn

Original Poster:

16,177 posts

185 months

Friday 11th November 2016
quotequote all
Last night's session resulted in the funnels being fitted, and yet another deck fitted between them:







Next up is adding more railings to this lot.

dr_gn

Original Poster:

16,177 posts

185 months

Sunday 13th November 2016
quotequote all
More railings and the rear cabin fairing, plus the beginings of the mast (reinforced with a pared-down cocktail stick):






dr_gn

Original Poster:

16,177 posts

185 months

Friday 18th November 2016
quotequote all
Fitted the crane cab (with glazing and a control panel to fill out the interior a bit), and completed it with railings and ladders:







Just needs the jib fitting to the pivots and the cables adding.

Also re-made the black front mast strut (the original was too short), and the upper mast (which was too thin). Design errors to tthe last with this one...



Still al load of fine laser-cut detail to add to the mast.