I've posted on a few threads that I'm undertaking a build and finally got round to uploading pictures to photobucket with the intention of posting a thread. These are always interesting for me so I hope this is worth a look also.

We completed purchase on the plot in October and started November 6th with the ground works. My Mum's partner is a general builder and recommended a local guy who he works with. Been provided a fixed price to build with allowances for certain elements such as Kitchen/Windows and then if I want to up spec I can add to it.

First of all the House.




And the floor plans

First of all Ground



We have changed the Gas fire for a wood burner which helps meet SAP calcs. Likely we'll put that directly under the chimney and build the AV stuff next to it.

First Floor



Only changes I want to make here is relocate the sink next to the toilet in the bathroom, move the bath under the window and add a small shower cubicle.

worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
The Plot

The plot extends to just under 1/3 of an acre and is accessible down a shared private drive.



This is the view from the other end of the drive.



We are renting the house from which the plot formed half of the garden. On the upside we are on site, the downside it is a bit of an old wreck and very cold!





Edited by worsy on Thursday 14th November 18:48

worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Plot was predominantly grass





But there was a fair bit of vegetation to take out



The stick to the right marks the boundary which is 5 metres across. The trees needed to come out to install a driveway.



First day on site




Edited by worsy on Thursday 14th November 18:45

Dr G

15,172 posts

242 months

Thursday 20th December 2012
quotequote all
BOokmarked, I'll follow this with interest smile

worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Site equipment delivered



Fencing up







worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Driveway cut out



Base of bricks



Stoned and rolled








worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Rain at end of November turned site into a bog







But not bad enough to stop the foundations being dug






worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Another torrential couple of days flooded the trenches





Scooped out and dug further to firm ground





Meant BC & NHBC signed off ready for the mix










worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Lost a few more days to the rain intermittently. Foundations going down.









Block and beams going on





Bricks delivered








worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Floor down








worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
Floor has now been floated with mix and the paths and driveway all laid to stone. Blocks set out for start of vertical build in New Year.

The rain of the last couple of days has really soaked the site though and we could do with some dry weather to enable the saturated soil to drain. In the meantime I'm getting quotes for windows and doors.

Just want Xmas out of the way now smile

northandy

3,496 posts

221 months

Thursday 20th December 2012
quotequote all
Brilliant stuff, good luck with the build, looks like a decent sized house an a nice plot you have.

bookmarking.


ColinM50

2,631 posts

175 months

Thursday 20th December 2012
quotequote all
Looks a very nice substantial house. Only thing I'd suggest is give each of the four bedroons it's own en-suite bathroom, can't see the point of two en-suites and one family bathroom. But looks as if it's going to be a great place for a PH BBQ.

anonymous-user

54 months

Thursday 20th December 2012
quotequote all
Good work, very exciting. I'm with you on the Crimbo thing - although we have got fairy lights round the 'van. Do you want my window contact? 11 flush fit casements, 2 sashes, a door and 3.8m of bi-fold. Wood, guaranteed, painted, delivered on time = £8800. See blog for loveliness. E

worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
ColinM50 said:
Looks a very nice substantial house. Only thing I'd suggest is give each of the four bedroons it's own en-suite bathroom, can't see the point of two en-suites and one family bathroom. But looks as if it's going to be a great place for a PH BBQ.
lol

As we have two girls we've gone with a Jack and Jill en suite. It is big enough to turn into two separate en suites if required later, but allows them to have a nice big shower. We've gone with separate sinks though for future make up and hair wars!

I've seen the thread arguing that a bathroom is useless. However I do like a nice bath and with a shower it will almost be Bed4s en suite as only across the hall. It's an occasional guest room anyhow.

skintemma said:
Good work, very exciting. I'm with you on the Crimbo thing - although we have got fairy lights round the 'van. Do you want my window contact? 11 flush fit casements, 2 sashes, a door and 3.8m of bi-fold. Wood, guaranteed, painted, delivered on time = £8800. See blog for loveliness. E
Yes please. So far I've had a quote for 24 casement windows, painted, plus two french doors, plus two personal doors, all hardwood - £12k ex vat.

I'm rather taken with the Residence 9 Upvc but that came in at 19k with composite doors. Have tried a fabricator direct to see whether I can better it.

Edited by worsy on Thursday 20th December 18:50

worsy

Original Poster:

5,804 posts

175 months

Thursday 20th December 2012
quotequote all
One thing I've not mentioned is the garage. We had to apply separately for that. The vendor had already got planning on the house and as it was granted pre CIL then any changes would have incurred a big costs.

Thankfully we gained approval quickly to build a 7.5 x 6.3 (wxd) double with two 2.9 metre doors. Wide enough and long enough to get my X5 in smile

hornetrider

63,161 posts

205 months

Thursday 20th December 2012
quotequote all
Is it up yet?!

hehe

RWA441

703 posts

224 months

Thursday 20th December 2012
quotequote all
worsy said:
One thing I've not mentioned is the garage. We had to apply separately for that. The vendor had already got planning on the house and as it was granted pre CIL then any changes would have incurred a big costs.

Thankfully we gained approval quickly to build a 7.5 x 6.3 (wxd) double with two 2.9 metre doors. Wide enough and long enough to get my X5 in smile
Having done a self build a few years back I wouldn't worry about fitting the X5 in the garage, it'll be long sold to buy materials before the garage is finished for it!!! hehe
Good luck with it and I'll be following with interest. smile

Slagathore

5,810 posts

192 months

Thursday 20th December 2012
quotequote all
Looking forward to more of this.


TonyHetherington

32,091 posts

250 months

Friday 21st December 2012
quotequote all
Excellent - be great to see how you get on