Rutter's House renovation

Author
Discussion

Rutter

Original Poster:

2,070 posts

206 months

Friday 10th April 2015
quotequote all
More windows and doors, all sorted now, back door now looks like this




Patio doors have changed too



But perhaps the biggest change is the front door



Happy with the windows and doors, they seem great quality, the making good however could have been done a little better, It seems that filling holes in plaster isn't the done thing, so just whack a 2 inch trim all around the window frame to cover any damage. Is this normal? Is it normal to fill any holes larger than the trim with silicone?

Building work should be mostly finished by the weekend so it will be onto decorating, carpets etc which I doubt anyone is really interested in!


Pheo

3,339 posts

202 months

Friday 10th April 2015
quotequote all
Not the silicon was, but all of ours have the trim. Guess it's cheap and fast way of making good. I know what you mean though.

Mark Benson

7,514 posts

269 months

Friday 10th April 2015
quotequote all
It seems to me that this is where the good window firms are sorted out from the mediocre - our last lot of windows were fitted by a local firm that came recommended by our joiner and almost all the windows and doors needed little more than a line of caulking to finish - there were a few exceptions but they're few and far between and the fitter explained why he was covering up with trim at the end of each day, every single one was down to the bodges employed by the last fitter, in the 1980s.
They also polish out the joins so you don't get the discoloured sealant between the lengths of UPVC that make up the windows.

And they came in cheaper than the big nationals.

anonymous-user

54 months

Friday 10th April 2015
quotequote all
Front door looks great, though you do need to clean the white UPVC edging above it!

Rutter

Original Poster:

2,070 posts

206 months

Friday 10th April 2015
quotequote all
Hah yeah the rest of the UPVC needs a bloody good clean, all the guttering is filthy like its not been cleaned for at least a decade! Back of the list of jobs for now though, the next few weeks will be about making the house habitable and cleaning up and decorating the two bedrooms and lounge in prep for the blinds and carpet scheduled for next Friday.

Regarding the windows we were recommended these guys by a builder and they are a small independent firm, I've not paid them yet, so will see about having the surveyor out to inspect the work first. Its nothing dramatic but after the high standard of finish we have come to expect from the builder its a shame they couldn't have done a better job with the final finish.

5potTurbo

12,532 posts

168 months

Friday 10th April 2015
quotequote all
My Dad's had all the windows replaced on his house as, after 20 or so years, the DG panels were blowing (is that right?) and condensation was forming inside.

Anywhooooo, as he's a stickler for things being finished correctly, he wouldn't let the fitters add trim and silicon around the edge inside. But, rather than getting them to do it, I learned the old duffer's spent the last 3 weeks correcting everything inside by himself!




That said, your front door is a HUGE improvement over its predecessor! smile

Rutter

Original Poster:

2,070 posts

206 months

Tuesday 1st September 2015
quotequote all
Its been a while since I've updated this but we have made some progress, albeit slowly since the trades have left!

We had the loft and cavities insulated for free by british gas, this did however mean clearing all of the crap out of the loft, so much old carpet etc along with this nest


Seems it was once bees as there were a few corpses dotted around it, all very dead as it seems the previous owner had treated them to some kind of powder.

I don't seem to have many interior pics, will see if I can take some this week once we have tidied up a bit if people are interested. The bathroom should be replaced some time in October.

Outside we have made a few changes though.

I managed to find some paving slabs to match the rest of the patio after removing the steps



The cement has dried to a slightly different colour but nowhere near as obvious as when it was wet in these pictures.

My main project at the moment is sortin the parking out, we currently have parking for one car in front of the gates, with parking for at least one other bhind the gates, but opening them is a faf so they never really get used. Also the car port is rotten and the roof needed removing for the cavity wall insulation to be installed.




You can see how rotten it is there, so down it came...



I left a few posts at the end so the gates would stay up whilst I worked on my fag packet design for a new car bike port

I have made more progress since this picture but it gives you a bit more of an idea of my intentions.


Its 3 meters long so will give us room for 2 cars on the drive, the gates will be reused and moved back to fit on the front, the left hand edge will be feather edge all the way along with the left hand side of the back wall. then I will board the roof and felt it.

Rutter

Original Poster:

2,070 posts

206 months

Thursday 3rd September 2015
quotequote all
Did a bit more on the battening last night, light was going when i stopped but should hopefully get some more done over the weekend.



Not really done anything like this before and my soft IT hands aren't used to manual labour!

gtidriver

3,344 posts

187 months

Friday 4th September 2015
quotequote all
In the last pictures,have you built the wooden frame work on next doors land????

Rutter

Original Poster:

2,070 posts

206 months

Friday 4th September 2015
quotequote all
gtidriver said:
In the last pictures,have you built the wooden frame work on next doors land????
As much as i'd love to lay claim to that 2 foot wide section of land if you look further along you can see the boundary line where the old car port was, the brick retaining wall isn't the boundary. Saying that however they currently have no access to that land due to the existing gates so in effect I am giving them their land back by moving the gates!

gtidriver

3,344 posts

187 months

Friday 4th September 2015
quotequote all
So the previous owner of your house had built the carport on to the neighbours land???

Rutter

Original Poster:

2,070 posts

206 months

Monday 7th September 2015
quotequote all
Ignoring the internet expert who seems to have access to all the property deeds, I pushed on over the weekend and got the roof on and started with some of the feather edge boards for the sides.

I'll probably trim the boards to match the height of next doors fence, I was too impatient to see how it would look so stuck it up first without trimming the boards, will borrow a jigsaw soon to finish that part.





will put some trim around the top to hide my felt edges. I was planning to board to full height but quite like the extra light that having the top section open gives, so I will see how much water gets in and go from there.

Rutter

Original Poster:

2,070 posts

206 months

Monday 14th September 2015
quotequote all
Got the gates on over the weekend.


Still need to take down the old frame but we now have room for two cars on the drive.

Rutter

Original Poster:

2,070 posts

206 months

Monday 12th October 2015
quotequote all
Moving on with the bathroom renovation this week and last, has turned into more of a building job than a straight bathroom suite install though as the walls are all over the place and the previous floor tiles were stuck down with christ knows what so the floor needed to come up.

Some before pics to set the ball rolling




Tiles coming off the walls, or in some cases the tiles were in the wall and plastered up to.




New floor in and wall cut back ready for a new plasterboard sheet


This shows how skewed the walls are, and the high spot in the middle of the wall


I think this was due to the previous work done to convert the bathroom from two seperate rooms (toilet & bath) into one.

Hopefully have some updated pics after the work today and tomorrow.

Rutter

Original Poster:

2,070 posts

206 months

Tuesday 13th October 2015
quotequote all
Bath is in, some water in it to help settle, laser lines all over the place to help tiling.




Rutter

Original Poster:

2,070 posts

206 months

Tuesday 1st December 2015
quotequote all
Looks like Tuesday 13th of October was the last time I updated this, the bathroom has progressed and we are very close to the end… but obviously we are now in December…

Numerous things caused problems in the refurb, removing the old floor tiles meant we had to replace the floor, our choice of large tiles combined with wonky walls meant that tiling took a lot longer than it needed to, that and the fact we should have just got a professional tiler in rather than leave it to our builder who by his own admission can tile but is not a tiler. Anyway, here are a few progress pics on the bathroom, hopefully I will be able to get some finished ones up soon!


Remote shower in.


There has been further progress than this but I’ve not taken any more recent pictures. The original plan was to have the bathroom finished before we started the kitchen but due to those delays our new kitchen turned up yesterday along with the fitters.

Here is what it looked like for the 5 or so months after the wall was ripped out, as you can see the cupboards from the missing wall were placed against the back wall of the house with the worktop to allow us to have more storage and worktop in the interim, we also put our fridge into the intended fridge location.






In preparation over the last few weeks I have removed the skirting board style trim from the fridge opening, this left a bit of a mess to sort but I’ll see what the fitters say and play it from there. I took up the lovely blue floor tiles shortly after but didn’t get a pic of that.


Saturday just gone I took out the kitchen units.










I didn’t really like the idea of a golf SV when it was assigned as my next car but you can fit a lot of crap in the back of one! 2 full car loads to the tip.


Kitchen arrived at 2ish yesterday and the fitters got cracking, this was just after they left at 5:30






Hopefully have some more progress pics tonight if anyone is interested in reading this!

Dave_ST220

10,294 posts

205 months

Tuesday 1st December 2015
quotequote all
Getting there smile Your pics remind me why I gutted my place & started again (a fellow LBC Dapple Light brick too byebye ). The wiring was like yours with add on's here & there with surface mounted cables & junction boxes (actually found one that had been buried in the wall & plastered over rolleyes ). I bet the novelty of living in a building site s wearing thin??!!

Edited by Dave_ST220 on Tuesday 1st December 11:09

Rutter

Original Poster:

2,070 posts

206 months

Wednesday 2nd December 2015
quotequote all
Dave_ST220 said:
Getting there smile Your pics remind me why I gutted my place & started again (a fellow LBC Dapple Light brick too byebye ). The wiring was like yours with add on's here & there with surface mounted cables & junction boxes (actually found one that had been buried in the wall & plastered over rolleyes ). I bet the novelty of living in a building site s wearing thin??!!

Edited by Dave_ST220 on Tuesday 1st December 11:09
The level of incompetence we have encountered with the wiring and plumbing here is awful, i'm happy to give anything a go but the previous owners over the years have been bodgers of the highest order!

Its coming on great, yesterday was a great day for progress as the bathroom is pretty much complete save for decorating and the kitchen should be finished today (minus decorating and flooring) biggrin

Dave_ST220

10,294 posts

205 months

Wednesday 2nd December 2015
quotequote all
That's the problem with 70's builds, I mean the house probably only had 4 sockets when built for example! As we were basically changing the layout of every room it was easier to start again. I can now sleep well knowing it's basically a new house. I think once the kitchen is in it's happy days smile (even though there is still loads to do!!). Have you insulated the cavity & roof? Made a massive difference here. Good luck & keep the updates coming....

Rutter

Original Poster:

2,070 posts

206 months

Wednesday 2nd December 2015
quotequote all
Dave_ST220 said:
That's the problem with 70's builds, I mean the house probably only had 4 sockets when built for example! As we were basically changing the layout of every room it was easier to start again. I can now sleep well knowing it's basically a new house. I think once the kitchen is in it's happy days smile (even though there is still loads to do!!). Have you insulated the cavity & roof? Made a massive difference here. Good luck & keep the updates coming....
I guess the 70s was a different era and so much change happened. This house had a warm air central heating system originally so as you say one maybe two sockets per room was acceptable.

We have had the loft and roof insulated and I agree it has made a big difference to heating bills when combined with the new windows and doors.

Any pics or a thread for your place?

A few kitchen update pics from last night.







Hopefully by the time I get home later the extract and splashback should be in along with the handles and finishing touches and we should be pretty much there. Flooring will be done before xmas but decorating will likely have to wait for now.