We recently moved into a property and are currently decorating / renovating where needed, however the recent weather meant that we had time to clear the garden, to start a fresh.

I am looking to build an outside patio area to the same level as the internal kitchen / diner floor. I have measured to the dpc from the current path shown on the image below, current sits at just over 150mm (adhering to building regs).



Plan shows decking, but I would like stone patio.


|http://thumbsnap.com/gEfXGHjo[/url]


If a patio was to be built up to the internal floor level it would be a few mm under the dpc, not adhering to regs.

The brick wall to the left is the neighbours conservatory, I could not locate a dpc on this wall.

Am I correct in thinking that I might be able to get away with building to the dpc level by creating a dry area as shown below? If so, what is the minimum width the gravel area needs to be from the wall?

[url]

Muppet32

173 posts

180 months

Monday 27th March 2017
quotequote all
100 - 150mm would be about right.

Or try these http://www.drainageonline.co.uk/Channel%2DDrainage...

SAB888

3,243 posts

207 months

Monday 27th March 2017
quotequote all
Another way to do it is to have the patio at door cill level but leaving a small gap between the house and the slabs, say 10mm. Support the slabs on a small wall and leave an open channel between that and the house, thereby maintaining the 150mm gap.

georgefreeman918

Original Poster:

608 posts

99 months

Monday 27th March 2017
quotequote all
SAB888 said:
Another way to do it is to have the patio at door cill level but leaving a small gap between the house and the slabs, say 10mm. Support the slabs on a small wall and leave an open channel between that and the house, thereby maintaining the 150mm gap.
I understand, but does that officially appease building regs or is it a loop hole?

SAB888

3,243 posts

207 months

Monday 27th March 2017
quotequote all
georgefreeman918 said:
SAB888 said:
Another way to do it is to have the patio at door cill level but leaving a small gap between the house and the slabs, say 10mm. Support the slabs on a small wall and leave an open channel between that and the house, thereby maintaining the 150mm gap.
I understand, but does that officially appease building regs or is it a loop hole?
Shouldn't be a problem as there is no contact between the patio and house below DPC level. You can also use the drainage channel method. There are plenty of buildings that have inside and outside levels the same at doors due to the need to provide disabled access.

037

1,317 posts

147 months

Monday 27th March 2017
quotequote all
A reason that building regs dictate the 150mm below dpc rule is to reduce any rain splashing above the dpc level where there is most risk of damp bridging to inside. I'd knock out a couple of bricks below dpc level to make sure the cavities are clean. Also make sure you don't block up any airbricks.

Too Late

5,094 posts

235 months

Tuesday 28th March 2017
quotequote all
i finished last year exactly what you want to achieve






We finished with this:





georgefreeman918

Original Poster:

608 posts

99 months

Tuesday 28th March 2017
quotequote all
Too Late said:
i finished last year exactly what you want to achieve
Looks great, please could you advise what you used within your dry area? Is it just gravel of is there any piping?


Andehh

7,110 posts

206 months

Tuesday 28th March 2017
quotequote all
Muppet32 said:
100 - 150mm would be about right.

Or try these http://www.drainageonline.co.uk/Channel%2DDrainage...
This would be my route forwards I think. Build the patio with a steeper-then-normal slant away from house, install one of those drains & then smoother the wall in brick breatherable sealant.

Failing that, gravel trench around patio edge?

Equus

16,884 posts

101 months

Tuesday 28th March 2017
quotequote all
037 said:
A reason that building regs dictate the 150mm below dpc rule is to reduce any rain splashing above the dpc level where there is most risk of damp bridging to inside.
No it's not: it's permanent bridging of the DPC by the ground itself that's the potential problem. Rain gets driven onto the outside face of a cavity wall all the time (and pisses straight through surprisingly quickly, according to the tests the BRE have done). A bit extra splashing back up from the paving flags will have no effect whatsoever.

The 10mm. gap solution suggested by SAB888 is just fine, so long as you have no existing problems.

Too Late

5,094 posts

235 months

Tuesday 28th March 2017
quotequote all
georgefreeman918 said:
Looks great, please could you advise what you used within your dry area? Is it just gravel of is there any piping?
I used the plan on paving expert


Except mine was a 200mm drop down to the base of the gutter. In the gully concrete (dry area) i pressed a long length of gutter in wet concrete to create a flow which i then made lead out through a hole in the kerb unit wall away from the house. Even though i laid membrane down, i didnt want water sitting in the gully of the concrete. I then filled with stones

I built the patio up with 5 tons of subbase and then created a 1/3 mix for my slate. Created a small fall away from the house but still puddles in areas due to the natural slate humps and drops.

Pointed with sharp sand and cement.

Hopefully that helps

8-P

2,758 posts

260 months

Tuesday 28th March 2017
quotequote all
Too Late said:
i finished last year exactly what you want to achieve






We finished with this:



What design prog did you use? I need to plan a patio and a drive!

Too Late

5,094 posts

235 months

Tuesday 28th March 2017
quotequote all
Sketchup

037

1,317 posts

147 months

Tuesday 28th March 2017
quotequote all
Equus said:
037 said:
A reason that building regs dictate the 150mm below dpc rule is to reduce any rain splashing above the dpc level where there is most risk of damp bridging to inside.
,kbNo it's not: it's permanent bridging of the DPC by the ground itself that's the potential problem. Rain gets driven onto the outside face of a cavity wall all the time (and pisses straight through surprisingly quickly, according to the tests the BRE have done). A bit extra splashing back up from the paving flags will have no effect whatsoever.

The 10mm. gap solution suggested by SAB888 is just fine, so long as you have no existing problems.
A reason not the reason.

georgefreeman918

Original Poster:

608 posts

99 months

Tuesday 4th April 2017
quotequote all
Too Late said:
I used the plan on paving expert


Except mine was a 200mm drop down to the base of the gutter. In the gully concrete (dry area) i pressed a long length of gutter in wet concrete to create a flow which i then made lead out through a hole in the kerb unit wall away from the house. Even though i laid membrane down, i didnt want water sitting in the gully of the concrete. I then filled with stones

I built the patio up with 5 tons of subbase and then created a 1/3 mix for my slate. Created a small fall away from the house but still puddles in areas due to the natural slate humps and drops.

Pointed with sharp sand and cement.

Hopefully that helps
Thanks that helps a lot, could I ask where you got your membrane from and how did you secure it to the wall?

Too Late

5,094 posts

235 months

Tuesday 4th April 2017
quotequote all
Sorry i missed this question

Membrane was from a local builders merchant and it was held there as i poured concrete in to make the gully. Once set, i poured stones in and cut it back so it wasnt visible...


Equus

16,884 posts

101 months

Tuesday 4th April 2017
quotequote all
037 said:
Equus said:
037 said:
A reason that building regs dictate the 150mm below dpc rule is to reduce any rain splashing above the dpc level where there is most risk of damp bridging to inside.
No it's not: it's permanent bridging of the DPC by the ground itself that's the potential problem. Rain gets driven onto the outside face of a cavity wall all the time (and pisses straight through surprisingly quickly, according to the tests the BRE have done). A bit extra splashing back up from the paving flags will have no effect whatsoever.

The 10mm. gap solution suggested by SAB888 is just fine, so long as you have no existing problems.
A reason not the reason.
THE reason in terms of the 150mm above ground level requirement for DPC.

To suggest that it's 'splashing' of water bouncing back up from ground/hard surfaces is absolute nonsense. If it's raining hard enough for any splashing to be occurring (which is fairly rare), then the entire face of the brickwork above DPC level on any windward elevation will be absolutely saturated.

Go take a reality check, and come back when you're feeling better.

Too Late

5,094 posts

235 months

Tuesday 4th April 2017
quotequote all
Equus said:
THE reason in terms of the 150mm above ground level requirement for DPC.

To suggest that it's 'splashing' of water bouncing back up from ground/hard surfaces is absolute nonsense. If it's raining hard enough for any splashing to be occurring (which is fairly rare), then the entire face of the brickwork above DPC level on any windward elevation will be absolutely saturated.

Go take a reality check, and come back when you're feeling better.
http://www.pavingexpert.com/dpc01.htm



The "ground-level dpc" is actually required to be at least 150mm above the ground level (See Building Regulations for England & Wales - Part C, Section 5.5). This is to reduce the incidence of 'splashback' from rain, and to ensure a minimum amount of elevation above standing water that may come about in exceptionally heavy rain or other incidents, such as allowing the hosepipe to run unchecked.

Equus

16,884 posts

101 months

Tuesday 4th April 2017
quotequote all
Too Late said:
The "ground-level dpc" is actually required to be at least 150mm above the ground level (See Building Regulations for England & Wales - Part C, Section 5.5). This is to reduce the incidence of 'splashback' from rain, and to ensure a minimum amount of elevation above standing water that may come about in exceptionally heavy rain or other incidents, such as allowing the hosepipe to run unchecked.
Paving expert is wrong. It's about neither splashback, nor (primarily) standing water; it's about the potential for physical bridging of the damp proof course by build-up of soil, vegetation or debris.

Standing water (groundwater) is dealt with by Section 4 of approved document C.

TA14

12,722 posts

258 months

Tuesday 4th April 2017
quotequote all
Equus said:
Paving expert is wrong.
In the early days there were so many exceptions to the diagrams on Paving Expert that the exact details were rarely much use. Over time the site is much improved however in this instance, as Equus points out, it is mis-leading.