Tampolli SR2/LMP675 Full Ground Up Rebuild In Pictures

Tampolli SR2/LMP675 Full Ground Up Rebuild In Pictures

Author
Discussion

BornAgainGT

Original Poster:

67 posts

173 months

Friday 28th January 2011
quotequote all

Side pods positioned (not final fitted), exhaust headers in place

Wheel speed sensors fitted

Straight thru exhaust for those VERY rare indeed none limited days

Silenced exhaust for all other times

Rear wing and more detail of the exhaust hangers

Rear end coming together now

BornAgainGT

Original Poster:

67 posts

173 months

Saturday 19th February 2011
quotequote all

Splitter end fences added

Air box

Throttle body trumpets

Rolling again

Rolling again

Rolling again

ellis427

1,653 posts

178 months

Sunday 20th February 2011
quotequote all
looks great!

kybo

1,166 posts

194 months

Monday 21st February 2011
quotequote all
Fantastic project. Awesome rebuild.

Looking forward to the next installment.

How much time has it taken, so far?

Thanks,
Scott

BornAgainGT

Original Poster:

67 posts

173 months

Tuesday 22nd February 2011
quotequote all

Heat protection and drive shafts installed

Heat protection and drive shafts installed

Ferb

3,112 posts

209 months

Sunday 27th February 2011
quotequote all
I like it thumbup
You should also put this thread in readers cars section as well wink
Good work smile
I used to hillclimb a Chevron B54 with a 6.3 chev in the back (625bhp) it was lot's of fun driving

BornAgainGT

Original Poster:

67 posts

173 months

Tuesday 1st March 2011
quotequote all

Completed front end

Completed front end

Air intake base plate preperation

Air intake base plate preperation

Air intake base plate

Close up

jonka

287 posts

217 months

Wednesday 2nd March 2011
quotequote all
im loving that tony

BornAgainGT

Original Poster:

67 posts

173 months

Thursday 3rd March 2011
quotequote all

Splitting the back end to finalise the clutch solution

From another angle

vetteheadracer

8,271 posts

252 months

Thursday 10th March 2011
quotequote all
Great project, look forward to seeing it finished.

BornAgainGT

Original Poster:

67 posts

173 months

Saturday 19th March 2011
quotequote all

Scratch build wiring loom based around DTA electronics.

Laying out the dash controls

Locating the ECU leaving room for the GCU

Newly powder coated rims mounted

Newly powder coated rims mounted

Getting there

Getting there

Getting there

Currently 633KG

BornAgainGT

Original Poster:

67 posts

173 months

Tuesday 12th April 2011
quotequote all

Completed the machining of the top front engine mount

Shown installed

Powder coated rear wing pylons, air box base

Safety wire nuts

BornAgainGT

Original Poster:

67 posts

173 months

Tuesday 12th April 2011
quotequote all

Many , many hours of work preparing the body work to take carbon wrap

Base wrap complete, just coloured highlights to add

BornAgainGT

Original Poster:

67 posts

173 months

Thursday 14th April 2011
quotequote all

Final fit of the side pods and center section around the roll bar hoop

High level view of same, showing relief for the seat belt pickups

And low level from the side

Could not resist fitting front and rear sections - just to see what she looked like - very pleased

And from high level - again very pleased with the overall look

And finally from the side

Best get her finished then, the track is beckoning...

kybo

1,166 posts

194 months

Monday 18th April 2011
quotequote all
Ouch,

That is awesome!!

Any details yet on when/where you'll be testing her or what events you'll be racing in - I would love to see/hear her doing some aggresive laps.

Thanks for the updates.

Scott

Edited by kybo on Monday 9th January 13:13

A Curtis

115 posts

167 months

Friday 29th April 2011
quotequote all
Cracking thread!

Is all the body work fibreglass with a carbon wrap?

thechosenfamily

332 posts

154 months

Tuesday 17th May 2011
quotequote all
Awesome thread mate.

And by the way awesome car

xr287

874 posts

179 months

Tuesday 17th May 2011
quotequote all
Brilliant thread! It's nice to see how it all goes together.

Secret Lemonade

281 posts

182 months

Saturday 30th July 2011
quotequote all
i see this could be making an apperance at snetterton on august 14

BornAgainGT

Original Poster:

67 posts

173 months

Thursday 25th August 2011
quotequote all
Back again - been a while but good progress

Body shell removed again and final fit of clutch solution

Release bearing

Gear shift mechanism fitted

Transaxle oil cooler fitted

Build up of the induction system

Induction system complete - bar air box base plate

Fuel system complete