My Supercharged Monaro build
Discussion
jameshsv said:
Gsd2000 what you doing about traction.especialy with all that power
For the drag strip I plan to switch to 15" drag radials with skinnies up frontOn the street for now I will use decent road tyres with the long term plan to mini tub and roll the arches to fit some 10" wide wheels with 285-295 tyres
So i thought that i should post an update
I decided to wrap my manifolds using DEI titanium wrap
Before
During
After
I had a knock on the front door and all this arrived
Inspecting the Callies Compstar rods
Ive also made a start on the base tune and should have that ready very soon
The plan is to drop the block off on Tuesday and i should if i keep pushing and chipping away have the car on the road for the V8UK Power Tour which is around the 24th May
I decided to wrap my manifolds using DEI titanium wrap
Before
During
After
I had a knock on the front door and all this arrived
Inspecting the Callies Compstar rods
Ive also made a start on the base tune and should have that ready very soon
The plan is to drop the block off on Tuesday and i should if i keep pushing and chipping away have the car on the road for the V8UK Power Tour which is around the 24th May
KMud said:
Get on with it Gurmeet!
I've got some tools that you might find useful if you want a borrow. Push-rod length checker, valve-spring tool (the heads installed kind), and a thing for aligning the timing cover...all unused since stick did the dirty for me.
timing cover tool would be handy, i have the others I've got some tools that you might find useful if you want a borrow. Push-rod length checker, valve-spring tool (the heads installed kind), and a thing for aligning the timing cover...all unused since stick did the dirty for me.
IXLR8 said:
gsd2000 said:
Did you think about using Zircotec??Did you use the Silicone spray they say to use with the DEI Titanium wrap??
Your doing a mighty fine job there mate keep those updates flowing
I thought that i'd update this
I collected the rotating assembly.
I had the block bored, honed, crank polished, keyway added to the crankshaft, heads skimmed, rotating assembly balanced
Now mounted on the stand, just finishing the prep for paint
If everything goes to plan, the engine should be built by early afternoon on Friday
I collected the rotating assembly.
I had the block bored, honed, crank polished, keyway added to the crankshaft, heads skimmed, rotating assembly balanced
Now mounted on the stand, just finishing the prep for paint
If everything goes to plan, the engine should be built by early afternoon on Friday
Gassing Station | HSV & Monaro | Top of Page | What's New | My Stuff