I love it when a plan comes together.

I love it when a plan comes together.

Author
Discussion

dnb

Original Poster:

3,330 posts

241 months

Tuesday 19th August 2014
quotequote all
Well, almost. wink

I'm pleased with the progress of reducing the amount of extraneous wiring in my Griff, and getting all the new cabin fittings and electronics in place now that I have what appears to be a functional engine.

New battery and clamp. A bit lighter and smaller than the original box, (although a bit larger than the previous battery) and more legroom. And more importantly less wires in the way.


New heater box fitted at last. No silly water valve.


Dash has everything required inside it. Including the redesigned heater controller and revised ventilation ducting.


The ECU has a home at long last nicely out of the way above the glove box.


A few more cable ties and convoluted tubing and it'll be getting towards being presentable. Maybe for the first time in ages I'll put the carpets back!

TVR Beaver

2,867 posts

179 months

Tuesday 19th August 2014
quotequote all
That looks loads better... I've been saying for ages now that I need to cut out all the unused wires... a job for winter me thinks;)