Kawasaki GT550 rebuild

Kawasaki GT550 rebuild

Author
Discussion

Gareth9702

Original Poster:

370 posts

132 months

Thursday 22nd August 2013
quotequote all
This thread will record the rebuild of my 1993 Kawasaki GT550 G9. I bought the GT550 in November 2010 as a cheap way to see if commuting to the office by bike would be successful. The last time I had owned a bike was in 1982 so a low powered middleweight seemed the right way to go. I also thought that any financial loss would be small since the Kawasaki had 6 months tax and MOT and its parts value was not much less than the price I paid.

Using the bike for work proved to be a great success and the GT550 was also very reliable. I gradually improved various parts of it - new seat cover, rusty areas repainted, general servicing - and decided to keep it. One interesting issue did arise. When I bought the bike it ran well at low revs but was reluctant to reach the redline. This did not bother me too much given the daily commuting. After a month of use I decided to check the valve clearances and re-shim if necessary. I took the rocker cover off then decided I should check the vale timing marks so that I would know what to achieve on re-assembly. The manual made clear the marks were on the right-hand side of the cam sprockets but on my bike they were absent. After some thought about what to do I checked the left-hand side of the sprockets - and there were the timing marks. At some point in the bkies life the camshafts had been installed running the wrong way across the head. So, the valves were opened be the closing side of the lobes and closed by the opening side. There was also no way of telling (without measuring) what this was doing to the valve timing. I still do not understand how anyone who was capable of such a basic error could actually ensure the valves were timed so that the bike would run. Perhaps is was just luck. Anyway, once the cams were installed correctly the bike had no problem pulling cleanly to the redline.

In March this year I noticed some rust on the lower tubes of the frame. Closer inspection revealead several small holes and the beginnings of a crack. This gave me no choice but to take the bike off the road and begin dismantling. This was completed in June. I then cleaned the frame and found three areas of significant damage. I thought about repairing myself but my welding is just not good enough. Two weeks ago I finally took the frame for professional repair. The grey primer in the pictures shows where the repairs have been made. Both lower tubes and one of the upper shock mounts have had new metal inserted.







The plan now is to strip the frame of all paint, neutralise the surface rust, and then re-paint. I have considered powder coating but prefer a traditional paint finish. The project will last several months as I also plan to rebuild the engine. This has an oil leak from the joint between the base of the barrel and the crankcase. It also seems worth replacing the cam chain while the engine is out fo the frame.

Gareth9702

Original Poster:

370 posts

132 months

Wednesday 11th June 2014
quotequote all
I started this thread many months ago expecting to quickly add updates. I discovered that it takes a very long time to strip the paint off a frame and to remove twenty years of accumulated grime and rust. The frame was eventually sanded to bare metal and treated with Loctite rust stabilizer. It was then finished with acrylic primer and top coat.

The tape is to protect the painted frame in storage and when the engine is lifted in. The forks were stripped to paint the lower legs and to fit new fork oil seals. The copper washers and the plastic washeres were all renewed. The thin pipe in the picture is to balance the air pressure between the fork legs.

Gareth9702

Original Poster:

370 posts

132 months

Wednesday 11th June 2014
quotequote all
The bottom fork holder/bottom bracket was cleaned and refitted. The original steering head bearings were fine so were cleaned and re-used. The bolts for the headlight support were replaced with stainless steel.



The forks were rebuilt, pushed loosely into place, and covered for protection. Their position will be finalised when the top for holder and handlebars are trial fitted. The masking tape on the gaiter has a message reminding me to check the tightness of the fork cylinder bolts.


podman

8,865 posts

240 months

Wednesday 11th June 2014
quotequote all
Nice work mate, have fond memories of a trip to the Bol D'or in the 90s , 2 up on a GT550.

Ill be sure to follow your progress.

peterg1955

746 posts

164 months

Wednesday 11th June 2014
quotequote all
Gareth9702 said:
I discovered that it takes a very long time to strip the paint off a frame and to remove twenty years of accumulated grime and rust.
?? 15 minutes with a sandblaster - if you know someone with a big enough cabinet or do it outside but everything will get covered in grit/dust...

Anyway, good luck with screwing it all back together, I might have a go at something like that next.

I'm currently rebuilding a non-runner 1980 Honda CD200 Benly (yeah, I know, wow eh!) that I got off a mate last year and stripped over the winter. Luckily I have a couple of retired friends (one who worked for 40 years in car mechanics and bodyshop) with a hobby workshop and paint booth down near Eastbourne so now it's all painted and prepped and ready for reassembly in my garage. I get to use their equipment and Barry painted all the bits for free as I helped them strip a Thema 8/32 Ferrari engine that had snapped a cambelt and restoring a 1970 Davrian kitcar that sat in a field for 5 years.

Gareth9702

Original Poster:

370 posts

132 months

Tuesday 17th June 2014
quotequote all
The first step of the engine rebuild. The upper crankcase meticulous cleaned and painted ready to receive the crank. The cases had been separated by a previous owner who economised on gaskets, oil seals, and o rings through liberal use of instant gasket. All traces were removed and mating surfaces completely cleaned. New oil seals were used on the crank.

Gareth9702

Original Poster:

370 posts

132 months

Tuesday 17th June 2014
quotequote all
Crank in place with new primary chain and new camchain. The engine had the sound of loose chains prior to dismantling. Hopefully, the new chains will cure this. The new primary chain felt much tighter than the old.

Gareth9702

Original Poster:

370 posts

132 months

Tuesday 17th June 2014
quotequote all
The next step was to put the gearshafts in to place. The gear were checked but had no noticeable wear. The large ball bearings also seemed perfect. The small needle rollers (one at the end of each shaft) felt worn so were replaced. The trusty old torque wrench was dusted dowm and prepared for the mating of the crankcases.

Gareth9702

Original Poster:

370 posts

132 months

Friday 20th June 2014
quotequote all
The upper and lower crankcases ready to be mated. All the bolts were cleaned and test-fitted. The masking tape labels were attached when dismantling so that each bolt was numbered, and could be replaced in its original position. Does this matter? I have no idea, but have seen it recommended in many places.

Gareth9702

Original Poster:

370 posts

132 months

Sunday 22nd June 2014
quotequote all
The crankcases are closed and the bolt heads are given a coat of paint. The masking tape keeps the mating surface clear of paint. The main bearing bolts were fitted first, then the lower crankcase bolts, and finally the upper crankcase bolts. The engine was then inverted to fit the primary shaft and oil pump.

Gareth9702

Original Poster:

370 posts

132 months

Sunday 22nd June 2014
quotequote all
The primary shaft separated into its component parts. One bearing had remained in the crankcase when the shaft was removed. The other had to be pressed off the shaft. Both bearings felt rough when rotated so were renewed. I should at this stage thank Jenna at Premier Power Products in Exeter for her help in sourcing a varied collection of bearings, circlips, and o-rings. Great service and far cheaper than official parts.

Gareth9702

Original Poster:

370 posts

132 months

Tuesday 24th June 2014
quotequote all
The primary shaft reassembled and back in place. The primary drive chain feels much tighter than the old chain. Hopefully this will reduce some of the chain noise. So far, this has all been very easy to put back together.

Gareth9702

Original Poster:

370 posts

132 months

Thursday 26th June 2014
quotequote all
The next component for fitment was the oil pump. This was dismantled and a feeler gauge used to check the tolerance between the impeller and the housing.


The tolerance was well within the limits so the pump was reassembled with a new gasket and circlip. It was refitted and two screws staked into place.

Gareth9702

Original Poster:

370 posts

132 months

Saturday 28th June 2014
quotequote all
All the painted engine parts have been stripped to bare metal before being re-painted. This is the oil sump and oil filter housing ready for paint. I am using PJ1 paint which is very easy to use and is giving a good finish.

Gareth9702

Original Poster:

370 posts

132 months

Sunday 29th June 2014
quotequote all
A fresh supply of o-rings in a range of sizes. Four are for the air pressure balance on the front forks. The remainder are needed to refit the oil sump and oil filter. Jenna at Premier Power Products sourced these for a fraction of the cost of Kawasaki original parts.



The sump fitted and work on the bottom end of the engine completed. The engine is now ready for fitting to the frame.


Private Pile

754 posts

195 months

Sunday 29th June 2014
quotequote all
Great thread Gareth, I love these home rebuilds. Keep it updated.

Private Pile

754 posts

195 months

Sunday 29th June 2014
quotequote all
Great thread Gareth, I love these home rebuilds. Keep it updated.

DuraAce

4,240 posts

160 months

Sunday 29th June 2014
quotequote all
Love it. Great to see it all coming together.

podman

8,865 posts

240 months

Monday 30th June 2014
quotequote all
Lovely mate...one of the classic bike mags last month had a GT550 feature, have you got it?

Gareth9702

Original Poster:

370 posts

132 months

Monday 30th June 2014
quotequote all
Thanks for the kind comments. I have been adding to the thread without knowing if anyone else was interested. The GT550 is not the world's most exciting motorcycle! I have not seen the GT550 feature but will make sure I find it.