6 months in

6 months in

Author
Discussion

stevoj

Original Poster:

798 posts

162 months

Thursday 23rd October 2014
quotequote all
At the end of the month I am 6 months into ownership and thought I would make a list of jobs completed, or will be by the month end.

• Front end and rear aerofoil re-spray, done prior to picking up from T v R.
• 12,000 mile Service, done prior to picking up from T v R.
• Seat removed all carpets cleaned and new foot well carpets fitted.
• All leather and vinyl cleaned and fed with Gliptone leather cleaner/food.
• Rear aerofoil removed and mounting brackets cleaned and painted.
• New n/side rear light.
• New st/st sill trims
• New door chrome trims fitted to door tops
• Bonnet re sprayed again due to paint sinkage on original work.
• Door mirrors removed and re sprayed with bonnet.
• Door cards removed to remove mirrors and modification done to alloy stud fixing for future removal.
• All door and window mechanisms checked cleaned treated and waxed.
• Door cards refitted with new door speakers, rear speakers fitted at same time.
• Rocker covers removed, polished and painted and new gaskets fitted.
• Ali handbrake sleeve fitted.
• New st/st bonnet support struts fitted.
• New sump gasket, remote oil filter pipes.
• New lower bushes to remote gear change.

And I thought I was buying an investment, does it ever end?smile

stevoj

Original Poster:

798 posts

162 months

Thursday 23rd October 2014
quotequote all
adam quantrill said:
A wedge is an investment alright - an investment of time!
Yepsmileand still got the outriggers to check and paint over winter before spending more money on the back end re spray!

stevoj

Original Poster:

798 posts

162 months

Thursday 23rd October 2014
quotequote all
Jees Mark, the only thing missing from that list is a new chassis!