So, apparently, the Meadows Roundabout is to be reconfigured, it has been talked about for ages, but I have yet to see any concrete plans, and considering the chaos that I am sure the 21 months of roadworks will cause, starting in two and a half months, I had to dig around to find the attached.
http://www.enterprisem3.org.uk/uploads/140bbca5602...

Anyone else aware of this?
It would appear that part of the plan involves making the A30 bypass the roundabout, which is no bad thing, and I have also heard that the road which heads onto the roundabout, running between the petrol station and Next is to close.

Anyone else know anything more?

Trevatanus

Original Poster:

11,125 posts

151 months

Wednesday 21st October 2015
quotequote all
Frimley111R said:
21 months - fking pisstake! It's one large roundabout.
I actually had a conversation with a lady a couple of weeks ago on one of the goverment helplines. I called to the number on the signs by the side of the road to find out when the roadworks at the a329(m) / M4 would finish.
She basically said that everything takes so much longer in this country because of "elf and safetly". A project in France, would generally be between 25 and 50% quicker.

Trevatanus

Original Poster:

11,125 posts

151 months

Tuesday 1st December 2015
quotequote all
It would seem they are delayed:

Just receieved this:

"Thank you for your enquiry requesting an update on the major roadworks at the junction between the A331 and A30, also known as the Meadows Gyratory. I am afraid to say that there have been a number of delays that have pushed the scheme back.
A report about the progress of both major schemes within Camberley is being presented to the Surrey Heath Local Area Committee at the upcoming meeting. A copy of this report can be found here. The report should be able to answer the majority of your questions.
I am sorry for the delay in responding, but I trust that the information is of use. "


http://mycouncil.surreycc.gov.uk/documents/s26449/...

What amused me most with the response, was the URL in his letter, which is below, the url above is ammended

https://boardgamegeek.com/thread/938054/building-i... Camberley TC petition response FINAL.pdf

Show's what gets done in council offices

smile



Trevatanus

Original Poster:

11,125 posts

151 months

Wednesday 2nd December 2015
quotequote all
Paul v8 said:
long term try to connect Owlsmoor bottom of foresters way over to a30 Kings ride area .
Indeed... or make the road behind Next 2 way ( as I assume it was once)

Trevatanus

Original Poster:

11,125 posts

151 months

Wednesday 29th November 2017
quotequote all

Trevatanus

Original Poster:

11,125 posts

151 months

Wednesday 29th November 2017
quotequote all
silverfoxcc said:
Go on whats the difference from now?
Turn right from Blackwater to the M3 without using the roundabout is about it as far as I can tell.