Just noticed in the local rag that there will be 12 months of slip road closures as the link bridges are improved.
It says during the works there will be 'single narrow lanes' on the slip roads with a 40 mph limit. Err are they not already single narrow lanes??????????

The main M4 and A329(M) will not be affected