any Chubb engineers here?

Author
Discussion

wjwren

Original Poster:

4,484 posts

136 months

Thursday 21st August 2014
quotequote all
Doing a job in an office and accidentally drilled through some fire cable for the automatic doors. Office have called Chubb out to see how renewing the cable which is about 20m back to the control box as they cant join old and new up. Any idea on their hourly rate?

wjwren

Original Poster:

4,484 posts

136 months

Friday 22nd August 2014
quotequote all
Apparently its pyro presently but will be replaced with Fire proof' cable that back to the circuit breaker.

wjwren

Original Poster:

4,484 posts

136 months

Monday 25th August 2014
quotequote all
from what i understand its the red pyro cable i have gone through that controls the magnetic doors and also a white normal 3 core cable for the "exit" sign. Im still waiting for chubb to get back with a quote.