AWPR Appeal rejected

AWPR Appeal rejected

Author
Discussion

Gary C

12,427 posts

179 months

Monday 7th January 2019
quotequote all
Think yourselves lucky.

The Bay Gateway took from 1947 until 2017 to get built !

JohnS

935 posts

284 months

Monday 7th January 2019
quotequote all
rossub said:
Interesting situation this morning...

Coming from the South, the slip road down to the big roundabout at Kingswells was queued back onto the bypass itself. Had to slam on the brakes and stick the hazards on. Something needs to be done to slow the traffic on the roundabout, as it's just to fast to allow traffic to flow properly.
It was the same at the Parrkhill juntion this morning. Traffic tailed back all the way back onto the AWPR. it wasn't the roundabout which was the issue though, the traffic was tailing back from the lights on the Oldmeldrum road. I think it was just volume of traffic not able to get through the lights quickly enough.

I suspect the timing of the lights might be determined by the volume of traffic coming out of Dyce, and if there's only a few cars waiting the lights don't stay on for long before switching to traffic coming in from Oldmeldrum. The left filter from the AWPR is only on whilst the lights are green from Dyce to Oldmeldrum direction, and for a few seconds only for the right hand lane going straight on towards Fintray or turning right towards Oldmeldrum.

ALBA MELV

387 posts

156 months

Monday 7th January 2019
quotequote all
The road signs were going either side of the Don bridge from last Thursday. Hopefully not long and it'll all be open fully.

Coming from the A96 (Inverurie side) into Dyce was slow this morning. Not sure if that was down to a realistic volume of traffic on the road now or if it was typical first day back after New Year go slow.


OliilO

198 posts

137 months

Thursday 10th January 2019
quotequote all
What's the latest gossip on the opening date of the Don crossing?

abzmike

8,369 posts

106 months

Thursday 10th January 2019
quotequote all
OliilO said:
What's the latest gossip on the opening date of the Don crossing?
Contractors are apparently planning for January...

OliilO

198 posts

137 months

Thursday 10th January 2019
quotequote all
I think I was being overly optimistic thinking that January meant before the 31st....!

I'm interested to see how much difference it'll make for me getting from Bridge of Don to Dyce. Even a 10 minute difference in the morning makes a huge difference to the amount of traffic at the junction where traffic's coming off the AWPR headed south.

Peanut Gallery

2,427 posts

110 months

Friday 11th January 2019
quotequote all
Maay I just ask for clarification that we are talking about January 2019?......

abzmike

8,369 posts

106 months

Friday 11th January 2019
quotequote all
Peanut Gallery said:
Maay I just ask for clarification that we are talking about January 2019?......
Haha... I considered including that in my post, but given the recent rampant progress figured I’d give ARL the benefit of the doubt.

Helicopter123

8,831 posts

156 months

Friday 11th January 2019
quotequote all
Peanut Gallery said:
Maay I just ask for clarification that we are talking about January 2019?......
What have you heard I haven’t?

Jambo85

3,319 posts

88 months

Friday 11th January 2019
quotequote all
OliilO said:
What's the latest gossip on the opening date of the Don crossing?
Looks like about 6 of the long yellow tipper truck things on it this morning, surfacing? Can't be long now surely!

JohnS

935 posts

284 months

Wednesday 16th January 2019
quotequote all
It looks like it will be open in the near future.

I drove past this morning, and the bridge is now clear of all construction vehicles and looks complete. There was just a solitary road sweeper doing some surface cleaning on the bridge and nothing else.

Jambo85

3,319 posts

88 months

Friday 18th January 2019
quotequote all
Rumble strips for the Cleanhill roundabout: https://www.transport.gov.scot/news/awpr-enhanceme...

How it was constructed without them beggars belief but fair play to them for sorting it out pronto.

JohnS

935 posts

284 months

Saturday 19th January 2019
quotequote all
There has been no construction activity on the bridge for 3 days now and it looks 100% complete.

I can't see any reason why they can't open it asap, given all the politics recently around the delays...

Jambo85

3,319 posts

88 months

Monday 21st January 2019
quotequote all
https://www.pressandjournal.co.uk/fp/news/aberdeen...

“Mr Matheson said: “I am pleased to confirm the AWPR contractor has undertaken the remaining physical works on the Don crossing, with some survey works and safety checks being undertaken over the next week.

“In particular, I would like to thank the workforce for their efforts, especially at this time of year in often challenging conditions.

“However, we continue to await ARL management providing the necessary technical assurances required to allow the road to open.”

snowandrocks

1,054 posts

142 months

Monday 21st January 2019
quotequote all
Another artic buried in the Cleanhill roundabout at 4am this morning. Hopefully the planned rumble strips won't be long!

Baron von Teuchter

16,154 posts

202 months

Tuesday 22nd January 2019
quotequote all
That roundabout doesnt work very well. It could...but people are stupid.

Heading South, some people turn left to go to charleston in the right hand lane. At the same time as people in the left hand lane want to go straight aheead

Heading from Charleston, wanting to turn right and go up to Craibstone, people turn right in the left hand lane. Which isnt too bad...but people turning right in the right hand sometimes change lane on the exit of the roundabout.

And no fker indicates.

It needs some lane markings or signs really.

Jambo85

3,319 posts

88 months

Monday 28th January 2019
quotequote all
snowandrocks said:
Another artic buried in the Cleanhill roundabout at 4am this morning. Hopefully the planned rumble strips won't be long!
I went round it yesterday and the strips are done - makes a fair difference. I've heard they were originally omitted to reduce the noise experienced by nearby properties.

abzmike

8,369 posts

106 months

Friday 1st February 2019
quotequote all
Doesn't look like the opening of the top section is getting much closer, despite it being ready to go...

https://www.eveningexpress.co.uk/fp/news/local/tra...

Shuvi McTupya

24,460 posts

247 months

Friday 1st February 2019
quotequote all
abzmike said:
Doesn't look like the opening of the top section is getting much closer, despite it being ready to go...

https://www.eveningexpress.co.uk/fp/news/local/tra...
Transport Secretary Michael Matheson said:
“No responsible government could ever saddle the public purse with uncertain costs for an uncertain period of time.”
That IS a dig at the government over Brexit , right?

abzmike

8,369 posts

106 months

Friday 1st February 2019
quotequote all
Shuvi McTupya said:
That IS a dig at the government over Brexit , right?