Stuart Twin Victoria (Princess Royal) Mill Engine

Stuart Twin Victoria (Princess Royal) Mill Engine

Author
Discussion

dr_gn

Original Poster:

16,140 posts

183 months

Sunday 1st November 2020
quotequote all
This will be my second model engineering project after the 10V:

https://www.pistonheads.com/gassing/topic.asp?h=0&...

It's a model of a twin cylinder mill engine, based on the Stuart Models Twin Victoria:



Back in the mid '80's, "Tubal Cain" (Tom Walshaw) who was a prolific contributor to Model Engineer magazine, published a series of articles on how he modified and detailed the Stuart Twin Victoria. He called this refined version the "Princess Royal".

Refinements included a more realistic cylinder mounting method, re-designed connecting rods, incorporating scale bearings and caps, a working governor, a more refined ropewheel (flywheel), more relistic oilers and scale handrails.

The Stuart Models kit is very expensive, so after getting advice from the ME forum, I've opted to buy only the castings. I will fabricate the beds from aluminium, and make the rest from stock materials, which I've already got from a local supplier:



The BA fasteners I'll get from a specialist. I did buy the Twin Victoria plans, but most if not all the drawings for the Princess Royal version are in the ME Magazine articles:



The total saving doing it this way is around £250. It'll be a huge challenge - especially the governor, but that's what makes it fun.

Currently fettling the lathe and mill, so this one will probably get started properly after Christmas.

laters

324 posts

113 months

Monday 2nd November 2020
quotequote all
Another one to look forward too as I really enjoyed watching the progress of your 10V.
Brought back a lot of memories of the principles we were taught in the engineering department at collage all those years ago.
Would love a lathe and mill but just don't have the space.

Cant wait too see this one progress as your 10V is another level, as are all your other models too.


dr_gn

Original Poster:

16,140 posts

183 months

Tuesday 3rd November 2020
quotequote all
laters said:
Another one to look forward too as I really enjoyed watching the progress of your 10V.
Brought back a lot of memories of the principles we were taught in the engineering department at collage all those years ago.
Would love a lathe and mill but just don't have the space.

Cant wait too see this one progress as your 10V is another level, as are all your other models too.
Thanks Laters - glad you enjoyed following it.

dr_gn

Original Poster:

16,140 posts

183 months

Wednesday 9th December 2020
quotequote all
Well that’s £300+ of Stuart castings, no going back now...


fourfoldroot

589 posts

154 months

Saturday 12th December 2020
quotequote all
dr_gn said:
Well that’s £300+ of Stuart castings, no going back now...

I did think you weren’t saving much on the full kit, but realised Stuart prices are cunningly all ex vat.
Massive saving on the fully machined kit at £2.2 k.! And you get the joy of removing the excess material to reveal the perfectly machined castings underneath.

dr_gn

Original Poster:

16,140 posts

183 months

Saturday 12th December 2020
quotequote all
fourfoldroot said:
dr_gn said:
Well that’s £300+ of Stuart castings, no going back now...

I did think you weren’t saving much on the full kit, but realised Stuart prices are cunningly all ex vat.
Massive saving on the fully machined kit at £2.2 k.! And you get the joy of removing the excess material to reveal the perfectly machined castings underneath.
That's right - it rapidly adds up. I was skeptcal when I was told this was the best way of doing it, but it's right: I worked it all out quite carefully on a spreadsheet. Even then I forgot to add postage, and a couple of extrusions. The final cost breakdown is:

Castings & Extrusions (including VAT and postage) = £310.66
Raw materials (including VAT and collection) = £75.16
ME & BA Fasteners (including VAT and postage) = £42.80
Stuart Plans (which I didn't really need in the end!) = £16.68

Total "DIY Kit" = £445.30

Stuart Models Twin Victoria un-machined kit (including VAT and postage) = £664.74

So my total saving by doing it this way is £219.44 - or looking at it another way, a complete Stuart 10V kit including delivery and VAT, plus £100 left over.

It's also worth remembering that due to the supplied lengths of materials and minimum fastener quantities, I've actually ended up with a significant amount of spare materials over what I'd get in the Stuart kit.

After all that, if I was at a show, and saw someone asking £445 for the pile of bits that I've currently got in a box, I'd laugh at them.

ETA you're a bit off with the cost of a machined kit - it would be £2,512.92 inc. VAT and delivered.

If you want it "ready to run" it'll set you back an eye watering £3,844.50 inc. VAT and delivered.





Edited by dr_gn on Saturday 12th December 13:28

fourfoldroot

589 posts

154 months

Saturday 12th December 2020
quotequote all
Incredible, over £1k to assemble. Maybe a days work even with a bit of fettling. I’m in the wrong job!
I have just been given more BA nuts and bolts than i can use in a lifetime so if there is anything you need just pm me. Mainly in the 4-8 BA range which is the ones you need.

Turn7

23,502 posts

220 months

Saturday 12th December 2020
quotequote all
Ah good, I really enjoyed the last build, even though a lot of it is way above me, having never used a lathe....

dr_gn

Original Poster:

16,140 posts

183 months

Saturday 12th December 2020
quotequote all
fourfoldroot said:
Incredible, over £1k to assemble. Maybe a days work even with a bit of fettling. I’m in the wrong job!
I have just been given more BA nuts and bolts than i can use in a lifetime so if there is anything you need just pm me. Mainly in the 4-8 BA range which is the ones you need.
They certainly don’t seem shy when it comes to prices...You could literally buy the full kit, a lathe, a milling machine and pretty much all the tooling required for the assembled price.

Appreciate the offer of the nuts and bolts. I can send a list if you could see what you have? Happy to pay you for them rather than a random supplier. Thanks!

dr_gn

Original Poster:

16,140 posts

183 months

Saturday 12th December 2020
quotequote all
Turn7 said:
Ah good, I really enjoyed the last build, even though a lot of it is way above me, having never used a lathe....
Glad you liked it. I’d only used a lathe for very basic work before the 10V, and never really used a mill. It’s surprising how quickly you pick up the basics, and after that you can figure most things out one way or another. The advice from here and particularly the ME forum was invaluable. I suppose pre-internet Id have been stuck with learning from books or having the faff of joining a model engineering club and having to actually talk to people hehe

fourfoldroot

589 posts

154 months

Sunday 13th December 2020
quotequote all
dr_gn said:
Appreciate the offer of the nuts and bolts. I can send a list if you could see what you have? Happy to pay you for them rather than a random supplier. Thanks!
Yup, just email me with a list.

dr_gn

Original Poster:

16,140 posts

183 months

Tuesday 15th December 2020
quotequote all
Been working a bit more on the soleplate CAD (I'm fabricating them out of aluminium to save another £120 on castings). Also spent some time verifying the geometry of the piston stroke/crosshead location/connecting rod etc:



Crank centreline works out spot on the same height as the cylinder axis, and the mid-stroke crosshead position is exactly half way between the guide rail hole centres, so my imperial/metric conversion must have been correct.

Looks like there's a clash with the big end bearing cap if using the original casting dimensions though, so I'll have to extend the sides a bit:



Better to find out now than when assembling it...I do seem to remember someone somewhere mentioning this issue with the connecting rod, and the casting needing a slot filing in it. I thought they meant the rod itself clashed with a soleplate cross brace. I've seen a video online where it looks perilously close, which is why I shortened them, but they must have meant the bearing cap.

dr_gn

Original Poster:

16,140 posts

183 months

Saturday 19th December 2020
quotequote all
Nice little parcel arrived today:



Thanks very much Fourfoldroot - they will definitely be put to good use.

Turn7

23,502 posts

220 months

Saturday 19th December 2020
quotequote all
PH can still be a good place.......

dr_gn

Original Poster:

16,140 posts

183 months

Saturday 19th December 2020
quotequote all
Turn7 said:
PH can still be a good place.......
Definitely.

dudleybloke

19,717 posts

185 months

Saturday 26th December 2020
quotequote all
In for the ride!

dr_gn

Original Poster:

16,140 posts

183 months

Sunday 27th December 2020
quotequote all
dudleybloke said:
In for the ride!
Great! Few bits of machine fettling and I’ll be making a start.

dr_gn

Original Poster:

16,140 posts

183 months

Tuesday 29th December 2020
quotequote all
Got the fabricated bed drawings done - not quite to BS8888, and the check and approve process was a bit sketchy, but still:


dr_gn

Original Poster:

16,140 posts

183 months

Sunday 31st January 2021
quotequote all
Still too cold to do anything significant in the garage, so I thought I'd at least make some jigs to help get the tapers on the simulated bed castings right. The beds are the long things at the the bottom of the diagram here:



First thing to do will be to mill the side bars to the correct overall length, then co-ordinate drill and counterbore all eight holes per bar. Each long side has two M4 screws to secure each end, and two pairs of M3 screws in the middle (slightly staggered), for the stiffeners.

Next job, while the bars still have parallel sides, will be to mill the draw angle on the ends. I 3D printed a wedge to fit under the vice to help get this right:







The mill bed isn't long enough to machine the draw angle along the outer faces of the aluminium bar in one go, so I'll have to do it in two stages. I've made some more jigs to help with this. The jigs are flat on the bottom, and have the draw angle on their upper seating faces:



I printed in some hexagonal pockets which securely grip nuts of the appropriate size. I can then just screw the bar to the jigs, and the heads will be below the cut face. There are four blocks, two with pairs of small holes, and two with large and small hole pairs, spaced such that they can be orientated on the bed accommodate both bar positions:



I can hopefully move the bars to both positions without having to adjust anything, just by using different hole pairs:






It's complicated by the middle hole pairs not being central between the end holes, so it's very easy to get confused and not end up with the correct handed parts with the counterbores and draw angle on the right faces. I will have to triple check and write down a machining sequence, but so far I think I'll need two configurations of jig to do everything correctly - basically turn the jigs as a set through 180 degrees on the bed. However, I wouldn't be surprised if another length of bar will need to get procured at some point:

I also obtained some PTFE impregnated cord for the piston rings, and some scrap disposable tooling to grind to shape for the between centred boring bar I'll be making for the cylinders:




Edited by dr_gn on Sunday 31st January 15:12

dr_gn

Original Poster:

16,140 posts

183 months

Friday 5th March 2021
quotequote all
Thought Id give the “castings in the open fire” technique a try, just in case there are any hard chilled areas:







Hopefully they won’t have melted by morning, otherwise I’m about £300 down. Just did two tonight as a test. I’ll do the rest tomorrow if it’s successful...