Great Central Railway - News and "Stuff"
Great Central Railway - News and "Stuff"
Author
Discussion

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 26th February
quotequote all
Good progress on B64020 and we are doing a paint refresh on B581241 whilst it is at Rothley.


We are looking forward to seeing our rake of wagons running with the visiting 9F no 92134.

woodypup59

707 posts

183 months

Friday 27th February
quotequote all
WE popped in for walk round yesterday watching you preparations for this weekend.

Lots of spit a polish to be seen, but couldn't find a tanner to get a coronation Kit-Kat !



Flying Phil

Original Poster:

1,752 posts

176 months

Tuesday 17th March
quotequote all
Well we did get a Brake Van ride behind our rake of Windcutter wagons and the 9F. It was cold, wet, dry and sunny all in one trip! But 8 of us really enjoyed seeing our wagons dipping and bobbing as we crossed the rail joints.


Flying Phil

Original Poster:

1,752 posts

176 months

Sunday 19th April
quotequote all
Our latest wagon overhaul is turning out to be quite extensive...


The floor, although mostly sound, was badly dented and water pools had corroded some holes, the fixed end was also very poorly repaired after heavy damage in Pre GCR time, possibly by being "shunted" by a JCB bucket! The Interior chassis girders have bends in them and a axlebox "W" iron has a fracture as well.

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 14th May
quotequote all
I have been away for a couple of weeks but the team has been working hard, so B589204 is now in undercoat but was outside in the rain, so is still awaiting top coat. B570676 is in the shed and has had repairs done to a couple of lower inner stanchions, the East side has been wire brushed down to bare metal and a start has been made on removing the rivets on the "W" iron. Part of the underframe has been prepped and undersealed.
We also have our next wagon brought from Swithland, B573403 which came from Transrail Leamington in 1995. It had a quick clean and paint in 1996 and now needs a floor and some side repairs.











meb90

453 posts

124 months

Thursday 14th May
quotequote all
I don't think I have commented before, but I enjoy reading the updates when you post them and appreciate the amount of work going into the wagons!

How many minerals have you now got for the 'Windcutters' - it must be getting onto be a few now?

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 14th May
quotequote all
meb90 said:
I don't think I have commented before, but I enjoy reading the updates when you post them and appreciate the amount of work going into the wagons!

How many minerals have you now got for the 'Windcutters' - it must be getting onto be a few now?
Hi meb
We had 39 wagons at one point but 3 went to MOSI (Manchester Museum of Science and Industry). They have now gone to Weardale, Middleton and Blaenavon. Another six are on long term Loan to Blaenavon. So we now have 30. That is enough for two regular freight trains and can make a "Lengthy train".
Of these 22 have been overhauled and repainted in the past five years, we have four at Rothley now, with 2 completed, so there are six to go. We hope to get all running and two/three overhauls/repaints a year. This is all done by volunteers.

meb90

453 posts

124 months

Thursday 14th May
quotequote all
Flying Phil said:
Hi meb
We had 39 wagons at one point but 3 went to MOSI (Manchester Museum of Science and Industry). They have now gone to Weardale, Middleton and Blaenavon. Another six are on long term Loan to Blaenavon. So we now have 30. That is enough for two regular freight trains and can make a "Lengthy train".
Of these 22 have been overhauled and repainted in the past five years, we have four at Rothley now, with 2 completed, so there are six to go. We hope to get all running and two/three overhauls/repaints a year. This is all done by volunteers.
That's more than I was expecting you to say, but as you say it means you can put a proper train together.

I admire the work you and the other volunteers do - please keep it up smile One day I would like to join you, but I can only spin so many plates!

Matt

mcdjl

5,764 posts

226 months

Friday 15th May
quotequote all
The northern arm has two visitors for a few weeks
It sounded like the class 66 pulling them meet someone on the line as it left later on.

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 28th May
quotequote all
As many will know, we have had some hot weather recently...last week the team had a paintathon on wagon B589204 and painted the grey top coat. I went along yesterday and the paint was still soft and there were some "sags" on the West side which gets the sun all afternoon!






So when it is cooler and the paint is hard we will rub down and re paint before stripes and black box numbering.


Meanwhile in the shed I was able to put some undercoat on #676.



Flying Phil

Original Poster:

1,752 posts

176 months

Sunday 31st May
quotequote all
Seen at Loughborough yesterday, there is an impressive collection of diesels on the GCR.

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 25th June
quotequote all
Another first for the Windcutters!

This wagon went up to Leeds to have its wheel tyres "turned" to a correct profile. When it was unloaded I was told that it was actually shunted briefly onto NR rails so the first time a 16Ton Mineral wagon has been on the network in about 30 years! Also the first wagon to have its tyres turned in many years. Thanks to Rothley C&W for shunting and arranging this and the DCRT for funding this work and transport.

[url]
|https://forums-images.pistonheads.com/312401/202607074493293[/url]

Edited by Flying Phil on Tuesday 7th July 12:29

Sorry about the picture which needs clicking on to open....I don't know why it is like that? Now sorted.

Edited by Flying Phil on Wednesday 15th July 15:17


Edited by Flying Phil on Thursday 15th October 15:48

Flying Phil

Original Poster:

1,752 posts

176 months

Thursday 30th July
quotequote all
We are making steady progress B560676, in the shed, is nearly ready to have its new fixed end put into place and outside two new wagons have had their old floors removed ready for new ones to be welded in place.


RacingPete

9,209 posts

235 months

Friday 31st July
quotequote all
After watching Francois saves a train, I have greater appreciation for all the volunteers who put in the time to keep our history rolling. Will be great once the railway is connected to Nottingham line.

Flying Phil

Original Poster:

1,752 posts

176 months

Friday 7th August
quotequote all
In other GCR news
The shareholders of Boscastle Locomotive Ltd received excellent news recently that there has been a full and final settlement of the insurance claim following the theft of parts three years ago. It is said that this will cover about 90% of the total cost of the 90 plus stolen parts (None were recovered). This claim has taken a huge amount of time to process and we are very grateful to the GCR and their Insurance Company for their support.
Our fundraising continues for the boiler completion and final assembly costs....but Boscastle's return to steam is getting closer!
A gratuitous picture of the locomotive when it was running in the 1990's

Flying Phil

Original Poster:

1,752 posts

176 months

Monday 21st September
quotequote all
Other news from the GCR is that the "Factory Flyover" section has gone out to tender with possible contractors. This is the two section viaduct over the Precis Spark car park and bridge over the Railway Terrace road (To the tip site). They hope that the build can start at Christmas and take about a year.
In Windcutter news, we now have our new fixed end made and it is due to be lifted into place when we can have the wagon under the large "A" frame in the yard. We also have the new "W" iron, which the Rothley C & W team will have drilled and rivetted onto B560676.


dhutch

17,936 posts

228 months

Monday 21st September
quotequote all
Fair enough. Good progress, thanks for the update.

Flying Phil

Original Poster:

1,752 posts

176 months

Friday 25th September
quotequote all
Trial fitting of our new fixed end.

Some fettling to do to get the stanchions correct to the headstock.

Followed by a stint of undercoating.

Flying Phil

Original Poster:

1,752 posts

176 months

Friday 2nd October
quotequote all
On another website, the question was asked about how much does a Windcutter wagon cost to overhaul. So I put together a rough costing by saying a new floor uses about £700 for new steel sheet. But there is also about 40 cutting discs and 80 welding rods. Coating the inside uses about 5l of bitumastic. Painting the outside uses about 2 to 5l of primer, 4l of undercoat and 4l of topcoat. There are also sundries of vac cylinder overhaul, hoses, grinding discs, wire brushes, paint brushes etc....so a broad total cost of about £2500 direct cost.....and about 300 hours of volunteer time (4 people 6 hours per week, three months per overhaul).
We have 30 wagons in the fleet and 23 have been recently (within 6 years) overhauled. There are three now at Rothley for completion over the next 5 months and the last four at Swithland for completion in 2027.
As we hope these overhauls will last about 30 years, with two paint jobs in that time, the future costs will be less.
Seeing Two Windcutter rakes running over this Gala weekend is why we do the work! We are having a Sales stand at Rothley on Sat and Sunday so please come along to speak to the team and show your support.

Yertis

19,738 posts

297 months

Friday 2nd October
quotequote all
I'm sorting through my old Hornby stuff at the moment, and came across some old Airfix 16 ton mineral wagon kits. You'll be proud to know that the first thing I though of was this thread and your efforts to preserve the things.