World's largest offshore windfarm starts generating
World's largest offshore windfarm starts generating
Author
Discussion

tamore

10,109 posts

315 months

Friday 13th March
quotequote all
Evanivitch said:
Unless they're using the mine workings as a reservoir, which has massive issues in terms of water contamination, it's a somewhat pointless exercise. Like most non-water gravity storage solutions.
nope big blocks on windings going up and down 1000m shafts.

Evanivitch

26,523 posts

153 months

Friday 13th March
quotequote all
tamore said:
Evanivitch said:
Unless they're using the mine workings as a reservoir, which has massive issues in terms of water contamination, it's a somewhat pointless exercise. Like most non-water gravity storage solutions.
nope big blocks on windings going up and down 1000m shafts.
Absolutely pointless. The maths doesn't stack up.

tamore

10,109 posts

315 months

Friday 13th March
quotequote all
Evanivitch said:
Absolutely pointless. The maths doesn't stack up.
i'll let them know.

borcy

13,035 posts

87 months

Friday 13th March
quotequote all
Last i read about the weights in mine shafts about 5 years ago i remember thinking the numbers were very small.
There's probably a business in there for someone, but i don't think it's able to produce large enough amounts of energy to be any sort of solution.

otolith

69,668 posts

235 months

Friday 13th March
quotequote all
tamore said:
Evanivitch said:
Absolutely pointless. The maths doesn't stack up.
i'll let them know.
Gravitricity appears to have gone tits up frown

https://www.solarpowerportal.co.uk/energy-storage/...

Evanivitch

26,523 posts

153 months

Friday 13th March
quotequote all
tamore said:
Evanivitch said:
Absolutely pointless. The maths doesn't stack up.
i'll let them know.
They won't care. They're out to milk grant money like the hydrogen car chaps.

There was a time when batteries were expensive and there was a mad dash for alternatives. That time has long passed.

NRS

26,476 posts

232 months

Friday 13th March
quotequote all
PushedDover said:
He's almost right on the number of turbines.

tamore

10,109 posts

315 months

Monday 25th May
quotequote all
any information on when dogger A might be fully functional?

PushedDover

7,713 posts

84 months

Tuesday 26th May
quotequote all
tamore said:
any information on when dogger A might be fully functional?
I believe that some serious issues of a couple that are serious and needing to be managed before up and running 100%

Hill92

5,494 posts

221 months

Tuesday 26th May
quotequote all
PushedDover said:
tamore said:
any information on when dogger A might be fully functional?
I believe that some serious issues of a couple that are serious and needing to be managed before up and running 100%
SSE plc's Full Year Results scheduled to be released on Thursday so might get some more detail then.

Hill92

5,494 posts

221 months

Thursday 4th June
quotequote all
plfrench said:
DBA will be overtaken by DBB on the Robin Hawkes site at this rate! Still only showing 14% of potential even with a near 21 m/s windspeed. Surely this must be a reporting error on the RH site, can't actually be producing that little still?!

Hornsea 1 and 2 are both sitting at 97% and 93% of capacity respectively in similar conditions.
It's happening now. DBB outputting 230 MW with DBA stuck on 229 MW.




PushedDover

7,713 posts

84 months

Friday 5th June
quotequote all
A significant number of GE turbines on DBA are having significant Yaw control issues.

also:


Hill92

5,494 posts

221 months

Wednesday 26th August
quotequote all
PushedDover said:
More posts from Robin Hawkes:

DBB vs DBA: https://www.linkedin.com/posts/robhawkes_unfinishe...

Crane revisiting DBA after DBB lifts: https://www.linkedin.com/posts/robhawkes_the-plot-...

Satellite imagery suggests blades are being replaced (or removed for refurbishment) on some of the DBA turbines: https://www.linkedin.com/posts/robhawkes_can-you-u...

More imagery: https://www.linkedin.com/posts/robhawkes_where-did...

Still lots of progress on DBB and other farms: Inchcape, East Anglia 3 etc.

PushedDover

7,713 posts

84 months

Thursday 27th August
quotequote all
For what it is worth - just been told here on site today, Yesterday was the record output achieved on DBA and DBC

ashenfie

3,421 posts

77 months

Thursday 27th August
quotequote all
PushedDover said:
For what it is worth - just been told here on site today, Yesterday was the record output achieved on DBA and DBC
Robins site suggests around 37% of capacity @ midday yesterday for Dogger A. So I am not sure when the record would have been.

PushedDover

7,713 posts

84 months

Thursday 27th August
quotequote all
ashenfie said:
PushedDover said:
For what it is worth - just been told here on site today, Yesterday was the record output achieved on DBA and DBC
Robins site suggests around 37% of capacity @ midday yesterday for Dogger A. So I am not sure when the record would have been.
My typo / Auto correct FWIW.

I meant Doggerbank A plus Doggerbank B.


Doggerbank B is now on a good build schedule.

plfrench

Original Poster:

5,039 posts

299 months

Thursday 27th August
quotequote all
PushedDover said:
My typo / Auto correct FWIW.

I meant Doggerbank A plus Doggerbank B.


Doggerbank B is now on a good build schedule.
Great, so should comfortably achieve 24GW wind generation for the first time. Maybe tick off the 25GW milestone this year too!

Hill92

5,494 posts

221 months

Monday 5th October
quotequote all
Dogger Bank A requesting a 4 month extension to transmission licence exemption due to the continuing effects of the 2024 blade failures and associated investigation/ remediation delays.

https://www.gov.uk/government/publications/electri...

mikey_b

2,732 posts

76 months

Monday 5th October
quotequote all
Hill92 said:
Dogger Bank A requesting a 4 month extension to transmission licence exemption due to the continuing effects of the 2024 blade failures and associated investigation/ remediation delays.

https://www.gov.uk/government/publications/electri...
For non-windfarm experts, what does that mean in practical terms? Are they sticking meaningful quantities of power into the grid, or are they pushing back 4 months? Or is this something else entirely?

PushedDover

7,713 posts

84 months

Monday 5th October
quotequote all
mikey_b said:
Hill92 said:
Dogger Bank A requesting a 4 month extension to transmission licence exemption due to the continuing effects of the 2024 blade failures and associated investigation/ remediation delays.

https://www.gov.uk/government/publications/electri...
For non-windfarm experts, what does that mean in practical terms? Are they sticking meaningful quantities of power into the grid, or are they pushing back 4 months? Or is this something else entirely?
They are stating a few reasons for not having enough power on the site generated to fully allow the OFTO agreement to be put in place (which is needed) and with that, they (the windfarm) needs to be allowed longer as the transmission provider.

The assets are not yet in a condition where the OFTO transfer can be completed within the statutory timeframe, therefore allow the generator to continue operating the transmission system for longer.

If too many turbines are unavailable, there may not be enough generation to fully stress-test and demonstrate the export system, which can delay OFTO acceptance even if portions of the wind farm are already producing power.