World's largest offshore windfarm starts generating
World's largest offshore windfarm starts generating
Author
Discussion

Hill92

5,494 posts

221 months

Monday 5th October
quotequote all
mikey_b said:
Hill92 said:
Dogger Bank A requesting a 4 month extension to transmission licence exemption due to the continuing effects of the 2024 blade failures and associated investigation/ remediation delays.

https://www.gov.uk/government/publications/electri...
For non-windfarm experts, what does that mean in practical terms? Are they sticking meaningful quantities of power into the grid, or are they pushing back 4 months? Or is this something else entirely?
It's currently generating 564 MW out of 1,200 MW capacity. It was doing the same at 03:30 on 30 September when other offshore wind farms were at close to 100% capacity. Suggests that it is currently limited to about half its capacity until they resolve the issues.

The wind farm is made up of 6 balancing mechanism units of about 200 MW each. The 95 turbines are arranged in 15 strings of turbines around the central Offshore Substation Platform, which is then connected to shore by the HVDC interconnector (the transmission system referred to in the consultation). It could be that they can't operate all the strings at the moment due to ongoing work on some of their turbines.

dickymint

29,231 posts

289 months

Monday 5th October
quotequote all
mikey_b said:
Hill92 said:
Dogger Bank A requesting a 4 month extension to transmission licence exemption due to the continuing effects of the 2024 blade failures and associated investigation/ remediation delays.

https://www.gov.uk/government/publications/electri...
For non-windfarm experts, what does that mean in practical terms? Are they sticking meaningful quantities of power into the grid, or are they pushing back 4 months? Or is this something else entirely?


PushedDover

7,713 posts

84 months

Monday 5th October
quotequote all
rolleyes


It is fairly well known the launch of the GE turbine was not good. The build of DBA was slooooooow. There is still lots of rectification works ongoing to get the units online.
We know of a few blades, and Robin Hawkes has been hawkish in spotting jack ups on site there where they shouldnt be etc.
I believe a couple of Turbines will need replacing in entirety.

this is teething problems like never seen before - due almost entirely to GE plant / design / people.

Its a delay to the programme, so much so DBB will be finished / fit before DBA

dickymint

29,231 posts

289 months

Tuesday 6th October
quotequote all
PushedDover said:
rolleyes


It is fairly well known the launch of the GE turbine was not good. The build of DBA was slooooooow. There is still lots of rectification works ongoing to get the units online.
We know of a few blades, and Robin Hawkes has been hawkish in spotting jack ups on site there where they shouldnt be etc.
I believe a couple of Turbines will need replacing in entirety.

this is teething problems like never seen before - due almost entirely to GE plant / design / people.

Its a delay to the programme, so much so DBB will be finished / fit before DBA
Well we know you're not a GE fan so why the rolleyes at me? Was it not "another fk up" rofl

PushedDover

7,713 posts

84 months

Tuesday 6th October
quotequote all
dickymint said:
Well we know you're not a GE fan so why the rolleyes at me? Was it not "another fk up" rofl
Not many if any GE fans out there, so not as if exclusive to my views.
Eye-rolls were for a predicatable non contribution mockery that added nothing to the question from Mikey_b. looking for answers. It was not "another fkup" no. Sorry if sensitive.

PushedDover

7,713 posts

84 months

Thursday 8th October
quotequote all

PushedDover

7,713 posts

84 months

Monday 12th October
quotequote all
Anyone know where the thread that was / or similar to 'The Future of Power Generation in Great Britain' has gone?


I was going to ask what the 'peoples views' were of this currently (less hand wringing, more reality)- but seems moderators have wiped it?

https://www.pistonheads.com/gassing/topic.asp?h=0&...

Hill92

5,494 posts

221 months

Tuesday 13th October
quotequote all
PushedDover said:
Anyone know where the thread that was / or similar to 'The Future of Power Generation in Great Britain' has gone?


I was going to ask what the 'peoples views' were of this currently (less hand wringing, more reality)- but seems moderators have wiped it?

https://www.pistonheads.com/gassing/topic.asp?h=0&...
Here: https://www.pistonheads.com/gassing/topic.asp?h=0&...

PushedDover

7,713 posts

84 months

Tuesday 13th October
quotequote all
Hill92 said:
PushedDover said:
Anyone know where the thread that was / or similar to 'The Future of Power Generation in Great Britain' has gone?


I was going to ask what the 'peoples views' were of this currently (less hand wringing, more reality)- but seems moderators have wiped it?

https://www.pistonheads.com/gassing/topic.asp?h=0&...
Here: https://www.pistonheads.com/gassing/topic.asp?h=0&...
Cheers.
PH Search doing a sterling job as always for me hehe

plfrench

Original Poster:

5,039 posts

299 months

Tuesday 13th October
quotequote all
So how long till we crack 24GW wind generation for the first time? 5th Dec is the usual date for notching up the next milestone GW based on the last couple of years biggrin

Hill92

5,494 posts

221 months

Thursday 22nd October
quotequote all
8 month extension granted for DBA. More details on what's happening:

Blades and some nacelle components are being replaced on just over ten turbines at the 95-unit project, it is understood. Towers, nacelles and blades on the two machines affected by blade failures are also due to be replaced.

https://www.renews.biz/offshore-wind/turbine-repai...



PushedDover

7,713 posts

84 months

Thursday 22nd October
quotequote all
further incidents offshore on DBA too I hear....... thanks to GE. rolleyes

tamore

10,109 posts

315 months

Friday 23rd October
quotequote all
well whatever is operational around and on the british isles, it's going to get a workout tomorrow!

plfrench

Original Poster:

5,039 posts

299 months

Sunday 25th October
quotequote all
Doggerbank A and B are both showing zero output on Robin Hawkes - has something tripped?!

They were doing well over 1GW between them most of yesterday, but today, nothing!

dhutch

17,937 posts

228 months

Sunday 25th October
quotequote all
Doh

PushedDover

7,713 posts

84 months

Monday 26th October
quotequote all
plfrench said:
Doggerbank A and B are both showing zero output on Robin Hawkes - has something tripped?!

They were doing well over 1GW between them most of yesterday, but today, nothing!
seems back to business today at c.500MW per site.

I note Robin Hawkes doesnt cover the Teesside windfarm for some reason
https://renewables-map.robinhawkes.com/#7.72/54.97...

PushedDover

7,713 posts

84 months

Monday 26th October
quotequote all
Yet nothing at Sofia next door....

Hill92

5,494 posts

221 months

Monday 26th October
quotequote all
PushedDover said:
plfrench said:
Doggerbank A and B are both showing zero output on Robin Hawkes - has something tripped?!

They were doing well over 1GW between them most of yesterday, but today, nothing!
seems back to business today at c.500MW per site.

I note Robin Hawkes doesnt cover the Teesside windfarm for some reason
https://renewables-map.robinhawkes.com/#7.72/54.97...
It's on the map if you zoom in but there's no generation data because it is connected directly to the local distribution system rather than the transmission system. Not uncommon with the earliest, smallest and closest offshore wind farms and especially onshore in England.

Same reason why when you switch to the solar view there are lots of solar farms marked with dots but only a handful like Larks Green have generation data.

https://www.nationalgrid.com/uks-first-transmissio...

Distribution-connected generation is also called embedded generation and is normally captured as a reduction in demand on the national transmission system. Some sites adjust for embedded generation using e.g. solar estimates from Sheffield Solar. This is why there are significant differences in reported generation between older grid sites like Grid Templar vs iamkate, Drax Electric Insights, Robin Hawkes etc.

borcy

13,035 posts

87 months

Monday 26th October
quotequote all
Why has EGL 3/4/5 taken so long to get from planning to operational? It seems they won't all be operational until 2033-35.

_Rodders_

5,142 posts

50 months

Monday 26th October
quotequote all
I assume the ideal wind speed is somewhere below the 50-60mph the north sea has been seeing over the last couple of days?