M3 NBG MKII

Author
Discussion

Evo

3,462 posts

254 months

Tuesday 15th March 2011
quotequote all
eek Looks like it's had a collision with an electricity pylon, great work and glad to see it's all coming together.

5potTurbo

12,523 posts

168 months

Tuesday 15th March 2011
quotequote all
Evo said:
eek Looks like it's had a collision with an electricity pylon, great work and glad to see it's all coming together.
hehe

Book.marked!

thumbup

Interested to learn when this will make it to the 'Ring as it's about 2 hours away from where I live ...

westy182

90 posts

207 months

Thursday 24th March 2011
quotequote all
Keep up the good work mate. I cant wait for a Nurburgring lap in this beast.

Bmdub

Original Poster:

150 posts

195 months

Wednesday 6th April 2011
quotequote all
Bit of an update as i havent posted for a while.

Received a parcel from the states

BMW Rear Diff Strengthening kit (standard feature on M3 shell)



Turner Motorsport front subframe strengthening kit



Turner motorsport rear sway bar strengthening kit



Also managed to pick up these aluminium doors, came only on early evos for around 12 months, and noticably lighter then the steel equivalents



Car is back with the cage complete, tried to prep and primer but it is so complex i have given up and sending it so be sand blasted and zinc primered on monday... pics to follow


Bmdub

Original Poster:

150 posts

195 months

Monday 30th May 2011
quotequote all
Had a busy weekend working on the car

Swaged holes placed in various panels to take out some weight and strengthen up the panels







Dash trimmed and fitted







Also some updated pictures of the finished cage, the zinc coaters couldnt do the cage so we have painted it in Kurust until it goes for paint





Engine bay had some minor rust spots, so we decided to get it sand blasted and zinc coated.



And finally started to get the engine and running gear out of the M3.





Edited by Bmdub on Monday 30th May 20:51

Bmdub

Original Poster:

150 posts

195 months

Sunday 5th June 2011
quotequote all
Finished stripping the M3 this weekend... sad to see it in this state!









The shell has now been dragged outside ready to be weighed in.

Plan is to fit the engine in the new shell next weekend


westy182

90 posts

207 months

Monday 6th June 2011
quotequote all
Good progress there mate, I'm amazed at how much you've got done in a week.

Bmdub

Original Poster:

150 posts

195 months

Tuesday 14th June 2011
quotequote all
Picked up an E34 M5 3.91 diff, going to get my EVO diff rebuilt using the 3.91 internals





Also some pics of other cars being built at the yard.

E36 4 door which will be built to a similar spec to mine but with a 2.8 litre engine.





The E30 drift shed, currently having a 2.5 litre engine installed.


Bmdub

Original Poster:

150 posts

195 months

Wednesday 15th June 2011
quotequote all
Some more bits arrived today

Sytec Fuel Pump mounting bracket



Fuelab pre filter



VDO Oil Pressure, Volt Meter and Oil Temperature gauges






saladdodger

347 posts

166 months

Thursday 16th June 2011
quotequote all
shame about the M3 and i hope your ok, good work on the new shell, fabricage are very good, looks like a mental cage smile

good luck

Greg_D

6,542 posts

246 months

Thursday 16th June 2011
quotequote all
looking good, keep the pics coming, i love track builds

mwstewart

7,587 posts

188 months

Thursday 16th June 2011
quotequote all
That's some superb fab work.Great project!

westy182

90 posts

207 months

Friday 17th June 2011
quotequote all
Looking good. Cant wait to see it painted and the engine back in it wink

Bmdub

Original Poster:

150 posts

195 months

Saturday 16th July 2011
quotequote all
Quick update....

Picked up the custom made swirl pot from pro alloy



And these bits arrived today




5potTurbo

12,523 posts

168 months

Monday 3rd October 2011
quotequote all
Bump!

Any updates on this, please?

Greg_D

6,542 posts

246 months

Monday 3rd October 2011
quotequote all
^
This, it was looking really good.

westy182

90 posts

207 months

Thursday 1st December 2011
quotequote all
I'll chase him up.

I know he had some trouble getting the work done but the build has started up again now.

Bmdub

Original Poster:

150 posts

195 months

Thursday 19th January 2012
quotequote all
Well this has been dragging on for god knows how long due to my mechanic being ill and various other hold ups. Plan is not to get the dry build done by the end of Feb, Painted in March and back together for April...

Progress has been coming along slowloy but surly over the last few weeks.

Engine and box now in.



The wiring loom has also been simplyfied, and the fuse box moved into the modified glove box, wiring loom is now back in the car.

Next up is the installation of the Varley Red Top battery, Earls Fuel and Brake lines installed as well as the custom fuel system.

Pics to follow


mat205125

17,790 posts

213 months

Tuesday 31st January 2012
quotequote all
[quote=Bmdub]Had a busy weekend working on the car

Swaged holes placed in various panels to take out some weight and strengthen up the panels







Dash trimmed and fitted







Interested to know how you do the swaged holes. I've seen tools to use in a fly press, however not seen them put so neatly into interior panels like you've managed.


cragswinter

21,429 posts

196 months

Tuesday 31st January 2012
quotequote all
nice build mate thumbup

might be you in your old car on this video?
http://www.youtube.com/watch?v=h_N116VnQA0&lis...