Joined Garage - I want to replace mine
Discussion
I live in a semi detatched house and between myself and another neighbour there are our 2 garages, they are old prefab concrete slab style garage with what looks like the old asbestos wavy roofs.
when inside there is simply a middle wall seperating us, its not even flush to the roof as these roofs are slanted front to back so could easily put arm through. the concrete beams across the top sit on this for each side of the garage and are not one continuous beam across.
Correct removal and disposal of asbestos - not a problem.
A few questions;
Will someone legally own this middle wall to the garage?
Does anyone know if one side can normally be removed from these type of garages and the other garage left up without an issue?
I get on well with the neighbour so no issues there, but at the end of the day if they don't want to replace their garage I'm wondering what my options are?

when inside there is simply a middle wall seperating us, its not even flush to the roof as these roofs are slanted front to back so could easily put arm through. the concrete beams across the top sit on this for each side of the garage and are not one continuous beam across.
Correct removal and disposal of asbestos - not a problem.
A few questions;
Will someone legally own this middle wall to the garage?
Does anyone know if one side can normally be removed from these type of garages and the other garage left up without an issue?
I get on well with the neighbour so no issues there, but at the end of the day if they don't want to replace their garage I'm wondering what my options are?

killerferret666 said:
Will someone legally own this middle wall to the garage?
Both of you. Essential bedtime reading. 
https://www.gov.uk/party-wall-etc-act-1996-guidanc...
https://www.gov.uk/government/uploads/system/uploa...
http://www.legislation.gov.uk/ukpga/1996/40/conten...
TooMany2cvs said:
If you're removing one part of the joined garage, I'd have said it was your responsibility to make good the other garage.

Sound him out in the right way and you may be lucky with a 50/50 cost split. But be prepared to pay for the lot if he is happy with the status quo (which if he's canny/a bit tight will be his position anyway).
If he totes disagrees (can't imagine why) then I don't know what the next step would be. Some kind of convoluted build keeping his original side.
He wants to replace it at some point, but people often say this of course when we are chatting. Finding a few ££££ to replace it is a different matter.
cheers for the night time reading though.
I guess the next checks is can these type of buildings even be structurally taken apart in a half hearted manner and be left safe with one side still up!
cheers for the night time reading though.
I guess the next checks is can these type of buildings even be structurally taken apart in a half hearted manner and be left safe with one side still up!
killerferret666 said:
He wants to replace it at some point, but people often say this of course when we are chatting. Finding a few ££££ to replace it is a different matter.
cheers for the night time reading though.
I guess the next checks is can these type of buildings even be structurally taken apart in a half hearted manner and be left safe with one side still up!
Yes they can. They're modular, bolted together concrete crap that serve a purpose for around 20 years then fall apart. cheers for the night time reading though.
I guess the next checks is can these type of buildings even be structurally taken apart in a half hearted manner and be left safe with one side still up!
It'd be sweet if he fancied a change too. The cost of a double would be considerably less than two singles, you both win. It might be worth getting a quote for both options before you approach him. I know if I was thinking of doing the job one day and for example it'd cost me 10k or if I paired with your job, 6.5k I'd definitely go for that.
supermono said:
It'd be sweet if he fancied a change too. The cost of a double would be considerably less than two singles, you both win. It might be worth getting a quote for both options before you approach him. I know if I was thinking of doing the job one day and for example it'd cost me 10k or if I paired with your job, 6.5k I'd definitely go for that.
It might be an idea if you go for two singles.Forums | Speed, Plod & the Law | Top of Page | What's New | My Stuff