"M3 Surrey - Exit slip road to the anticlockwise M25 closed northbound at J2, Thorpe Interchange, because of an overturned lorry. Diversion in operation."

Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?

Surely most times at least one lane can be quickly cleared?

SM
ps I understand the marginal benefit of "scene of crime" work, but this can't apply very often and since we have whole load of nothing instead of any road safety policy, any findings aren't worth the bother.

OJ

14,209 posts

259 months

Monday 8th September 2008
quotequote all
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?

Milky Joe

3,851 posts

235 months

Monday 8th September 2008
quotequote all
Overturned lorry sounds like a good enough reason to me.

Perhaps we should start to charge the insurers of person at fault. wink

andyuk911

1,979 posts

240 months

Monday 8th September 2008
quotequote all
There was one at J6(M25)the other day ... They put a green banner up, and then recovered it late at night ...

DPX

1,027 posts

231 months

Monday 8th September 2008
quotequote all
I dont know , but someone somewhere is to blame , perhaps 200,000 claims for wasted fuel and time could make them drive a little safer

Sgt Bilko

1,929 posts

246 months

Monday 8th September 2008
quotequote all
supermono said:
Surely
No.

And don't call me Surely.

bigandclever

14,431 posts

269 months

Monday 8th September 2008
quotequote all
supermono said:
"M3 Surrey - Exit slip road to the anticlockwise M25 closed northbound at J2, Thorpe Interchange, because of an overturned lorry. Diversion in operation."

Does someone calculate the ££££s lost for whimsical road closures? Who's held to account when the cost/benefit analysis doesn't add up?
Yes 'they' do. "Whimsical" isn't the word I'd choose to use!

Some assumptions commonly used by the Highways Agency's National Operations Group include:

- On average 2000 critical incidents occur every year on the English strategic road network
- The average duration of a critical incident is 3.8 hours
- The average cost to the UK of a single vehicle hour delay on the network is £11.28
- The average flow per hour at any point on the strategic network is 1794 vehicles

Based on the above statistics (and I use that word loosely), an incident involving a total road closure will cost UK PLC on average £4,140 for every kilometre of traffic delayed by one hour.

A total road closure of 1 hour will create a 5km queue of stationary traffic.

However, this is an average figure based on flows for the whole strategic road network, and major motorways are likely to average at a much higher figure than mentioned above. Naturally, the M25 is a major motorway.

This is a crude assessment of the costs to the UK PLC, as the figures do not include the time it would take for the network to recover, but simply covers the timeframe for the initial closure of the motorway.

In reality the costs to the economy are much higher. In order to obtain a more refined assessment of the costs, the time taken for the network to reach “normal” journey times after a closure should be considered alongside variables likely to be included, such as the following:

- strategic / tactical signing
- rear-ward relief through the Traffic Officer Service
- diversion routes

The time for a road network to return to normality after such a closure, can be quite significant, in reality every additional hours delay costs the economy more money.

Indirect Costs
The figures quoted only highlight the direct cost to UK PLC, there are however many indirect costs related to incidents occurring on the network that need to be considered. Costs relating to:

- The loss of life or serious injury during an incident, which impacts, upon relatives and colleagues.
- Incident related congestion on the environment, including increases in emissions, such as oxides of nitrogen, carbon monoxide, and fine particle matter. This not only affects the local air quality but also contributes to greenhouse gases.

If you *really* cared you'd read the Transport Analysis Guidance here http://www.webtag.org.uk/webdocuments/doc_index.ht...

But it's tough going wink

edited to add: I should point out I got that info from the HA website, and added some bits. If you want to know the answer to this specific incident, I expect you could make a FOI request in a couple of weeks, once the debriefs have been completed, and get a (possibly(ish)) definitive answer.

Edited by bigandclever on Monday 8th September 18:13

Nigel Worc's

8,121 posts

219 months

Monday 8th September 2008
quotequote all
I share your pain supermono.

I'm not sure whats changed, but roads seem to be closed at the drop of a hat now.

Supposedly we have less accidents now than 20 years ago, but it seems to me that we have more road closures

DPX

1,027 posts

231 months

Tuesday 9th September 2008
quotequote all
Years ago cars very solid lots of steel and welded together . OK they rusted more
Todays car full of fancy plastic look nice trim that takes hours to sweep up.

cs02rm0

13,966 posts

222 months

Tuesday 9th September 2008
quotequote all
bigandclever said:
- The average cost to the UK of a single vehicle hour delay on the network is £11.28
£11.28 an hour? That seems way too low.

heebeegeetee

30,279 posts

279 months

Tuesday 9th September 2008
quotequote all
OJ said:
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?
No, but you could leave it there until it goes dark and quiet and then pick it up. Unless it's load is strewn all over the place of course...

C8PPO

20,881 posts

234 months

Tuesday 9th September 2008
quotequote all
bigandclever said:
an incident involving a total road closure will cost UK PLC on average £4,140 for every kilometre of traffic delayed by one hour.
I'd hazard a guess that either there are several zeros missing from that figure, or that it's an average which is drawn from figures including both the M25 and all the single-track rural lanes in far-flung counties. A single delayed truck carrying fresh produce could lose far more than £4k all on it's own.

The reason that we have so many more closures now is simply down to the agressive litigation/blame culture which we've absorbed from the USA. In order to avoid being sued, all parties involved feel obliged to cover every pimple on their collective arses, hence a complete road closure allows full forensic examination of every possible outcome followed by an intense deep clean of the scene to ensure that the next drunken pedestrian passing through doesn't trip over a discarded washer and sue for millions for the pain caused to his stubbed toe.

Sgt Bilko

1,929 posts

246 months

Tuesday 9th September 2008
quotequote all
heebeegeetee said:
OJ said:
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?
No, but you could leave it there until it goes dark and quiet and then pick it up. Unless it's load is strewn all over the place of course...
So it's blocking two out of three lanes for example. Lets close down two lanes for 5 hours, through one rush hour. That causes more congestion than letting people pass it. I have seen people stop in the only running lane to gawp and take photo's. Seriously!

OJ

14,209 posts

259 months

Tuesday 9th September 2008
quotequote all
heebeegeetee said:
OJ said:
Don't get me wrong, but its not like a couple of coppers could bounce a 40 tonne artic back onto its wheels?
No, but you could leave it there until it goes dark and quiet and then pick it up. Unless it's load is strewn all over the place of course...
Exactly, that one mentioned on junction 6 the other day was actually on its side in a field beyond the armco. It wasn't blocking any traffic, they could have picked it up later and they did!

The junction on the M3 has quite a sharp curve in it and isn't particularly wide. I'm willing to hazard a guess that it would have ended up right across the road

Fats25

6,260 posts

260 months

Tuesday 9th September 2008
quotequote all
andyuk911 said:
There was one at J6(M25)the other day ... They put a green banner up, and then recovered it late at night ...