Jobs for the holidays
Jobs for the holidays
Author
Discussion

adam quantrill

Original Poster:

11,625 posts

263 months

Thursday 22nd December 2016
quotequote all
Well I just sat down and made a list of little niggles with the Wedge, and things I want to get fettled.

Nothing that stops me using the car... but it comes to 13 jobs so far and counting! Just added another while typing this - 14 then.

So I reckon I'll be getting my hands a bit greasy between Xmas and the New Year.

mrzigazaga

18,740 posts

186 months

Thursday 22nd December 2016
quotequote all
Oh dear Adam...You just reminded me of my.."To-do-list"...Which incidentally is now bigger again than my "Done list".....

1. Re-trim the Wedge...Again but this time properly..smile
2. Sort out the rotten window channel...And it is rotten!!...
3. Sort out the leaky input & Output diff seals........
4. Sort out the paintwork.
5. Tidy the boot...
6. Sort out the illumination on the gauges so that i can see what speed I'm doing if I need the speedo at night....Which i have done and not had...;(
7. Sort out the spare Targa panel so I can use the car in the shyte rainy seasons without fear of the "Top gun" experience...Which was good the first second but then shyte the next few months...
8. Sort out the ever enlarging "V" between the passenger door and the body..eek
9. Fit some new springs to the rear as my bed has more give in it...
10. Make the exhaust louder...smile

adam quantrill

Original Poster:

11,625 posts

263 months

Thursday 22nd December 2016
quotequote all
Ha ha coincidentally my job number 13 is - make the exhaust quieter! (There's a small hole in a manifold.)

mrzigazaga

18,740 posts

186 months

Thursday 22nd December 2016
quotequote all
adam quantrill said:
Ha ha coincidentally my job number 13 is - make the exhaust quieter! (There's a small hole in a manifold.)
I bet thats annoying...I had it on my old ones and glad of the SS...never had an issue..Holy fook I hope I haven't just bocked my Wedge...banghead

KKson

3,466 posts

146 months

Thursday 22nd December 2016
quotequote all
My never-ending list is on a bloody big white board in the garage.

gmw9666

2,739 posts

221 months

Thursday 22nd December 2016
quotequote all
This is my job list

mrzigazaga

18,740 posts

186 months

Thursday 22nd December 2016
quotequote all
KKson said:
My never-ending list is on a bloody big white board in the garage.
The Wedge = Yin Yang



"To-do becomes done and done becomes to-do" and so is the circle of Wedgelife...smile

Yatesy350i

1,013 posts

157 months

Thursday 22nd December 2016
quotequote all
Jobs to do.

1. Get the engine and GB out for the GB input shaft bearing refurb.
2. Replace all UJ's.
3. Sort out all oil leaks.
4. Bling up the engine bay.
5. New coolant hoses.
6. Put it all back together.

I suspect most of the above will still need doing this time next year! As the thought of it being off the road for a few weeks. Is depressing.

But you never know. I have the Outlaws down for at least 4 days over the Christmas period. So the garage may be my new home :-).

KKson

3,466 posts

146 months

Friday 23rd December 2016
quotequote all
Yatesy350i said:
But you never know. I have the Outlaws down for at least 4 days over the Christmas period. So the garage may be my new home :-).
I was thinking exactly the same. Wife's family is here all Christmas so escape plan needed.

wedged up

353 posts

115 months

Friday 23rd December 2016
quotequote all
My escape plan is quite simply my car ' Get in it and drive away thumbup

adam quantrill

Original Poster:

11,625 posts

263 months

Friday 23rd December 2016
quotequote all
Take your tools too - for some car park fettling ;^)

I just thought of another 2 jobs so the list is still growing....

stevoj

798 posts

182 months

Friday 23rd December 2016
quotequote all
My main job over the festive break is get the BBWF form filled and sent back to Mark.smile

adam quantrill

Original Poster:

11,625 posts

263 months

Friday 23rd December 2016
quotequote all
Bugger! that's another one too...

Yatesy350i

1,013 posts

157 months

Monday 26th December 2016
quotequote all
Jobs to do.

1. Get the engine and GB out for the GB input shaft bearing refurb.
2. Replace all UJ's.
3. Sort out all oil leaks.
4. Bling up the engine bay.
5. New coolant hoses.
6. Put it all back together.

I suspect most of the above will still need doing this time next year! As the thought of it being off the road for a few weeks. Is depressing.

But you never know. I have the Outlaws down for at least 4 days over the Christmas period. So the garage may be my new home :-).

KKson

3,466 posts

146 months

Monday 26th December 2016
quotequote all
stevoj said:
My main job over the festive break is get the BBWF form filled and sent back to Mark.smile
Yep need to do that, after I've plied her family with drinks, food etc to see which one will look after the sprogs.

wedged up

353 posts

115 months

Monday 26th December 2016
quotequote all
Done the form ' filled in and sent back , can't wait !

mrzigazaga

18,740 posts

186 months

Monday 26th December 2016
quotequote all
Mines filled in and sent back too....smile

wedged up

353 posts

115 months

Monday 26th December 2016
quotequote all
There's 2 of us going then , I can feel a convoy coming on cool

wedged up

353 posts

115 months

Monday 26th December 2016
quotequote all
Fitted my new carpets today made by " ZIGGA " and the new indicator/flasher switches. I,ll take some picy's tomorrow .

wedged up

353 posts

115 months

Wednesday 28th December 2016
quotequote all
Fitted these !