A702 at Coulter - Fix the bridge this year?
A702 at Coulter - Fix the bridge this year?
Author
Discussion

Don Veloci

Original Poster:

2,142 posts

304 months

Monday 4th July 2011
quotequote all
Don't know if anybody involved in road maintenance policy for that area reads the forums but what is the story with getting that bridge sorted (again)?
It's been traffic light controlled for what? Over 3 months at least?

Since there is a similar problem at least once every year maybe at last they're looking at properly re-engineering a solution. But I'm not sure what scope there is with the proximity of property.

I may only suffer a minor delay once a week at most but I think it is embarrassing that a major trunk route is left unfixed so long.


S2red

2,549 posts

214 months

Monday 4th July 2011
quotequote all
Only three months! how long have those lights been on Loch Lomond side?

Don Veloci

Original Poster:

2,142 posts

304 months

Tuesday 5th July 2011
quotequote all
Never been up Loch Lomond way for years but let me guess, the theme is long term traffic lights is a cheap and simplified way of dealing with something that needs money and time.