Floor tiling question.
Discussion
Hi folks, I'm looking at tiling a conservatory floor which will have insulation then concrete screed and then dry underfloor heating in a latex screed.
How long do I need to wait before tiling it. I've heard a week otherwise the 'salts'? will rise up through the floor into the tiles. Does anybody who knows about this stuff agree with this figure or does it depend on screed thickness?
What do people think?
How long do I need to wait before tiling it. I've heard a week otherwise the 'salts'? will rise up through the floor into the tiles. Does anybody who knows about this stuff agree with this figure or does it depend on screed thickness?
What do people think?
Depends on the type of tiles you're going to put down as to whether or not the salts will bleed through. Ideally you should leave 1 day per mm thickness of the screed up to 50mm plus 1 week for every mm over 50mm, as drying time. Not many people have this luxury though, so you could use a surface dpm on the screed after about a week, then carry on as normal. If the tiles are a glazed ceramic you won't have any problem with bleed through anyway.
HTH
HTH
Gassing Station | The Pie & Piston Archive | Top of Page | What's New | My Stuff