Making my own Desk...
Discussion
why the support batons? attach a square piece of wood to the wall using rawlplugs and rest the top on that, using a couple of cabinet making angles underneath to secure it in place.
use a thick bit of wood so it doesn't flex [kitchen worktop offcut from B&Q or the bargain bit of ikea] and some sturdy ikea legs on each front corner.
bob's your mother's brother.
edited to say:
for fixing to the wall, the longest you can find. heavy duty rawlbolts if you want to go to town - about £6 for a pack from B&Q
overengineer it - use a worktop ratherthan ply or loftboard - then it will take as much as you can pile on it. i can stand on mine and jump up & down. for fun like
use a thick bit of wood so it doesn't flex [kitchen worktop offcut from B&Q or the bargain bit of ikea] and some sturdy ikea legs on each front corner.
bob's your mother's brother.
edited to say:
for fixing to the wall, the longest you can find. heavy duty rawlbolts if you want to go to town - about £6 for a pack from B&Q
overengineer it - use a worktop ratherthan ply or loftboard - then it will take as much as you can pile on it. i can stand on mine and jump up & down. for fun like

Edited by shirt on Wednesday 16th July 15:20
Best bet is to put a batton on the wall say 2 x 1 1/2 and using rawl bolts or KD's and "No Nails" fix it to the wall.
if you are gonna have legs then fine ... if not, make some triangles using 4x2 so the vertical side is vertical to the wall, and the horizontal is at 90 degrees to the wall. the other side will then act like a brace. (either screw or joint these and they will carry enough weight.
finally, position a work surface and fit onto the batton at the rear. (if youhave 2 walls in a corner this will be super strong. fasten using "No Nails" or small screws, just enough to hold it in place.
My home computer desk and darage work bench is made this way and ive never had any problems.
Takes about 3 - 4 hours to construct max.
if you are gonna have legs then fine ... if not, make some triangles using 4x2 so the vertical side is vertical to the wall, and the horizontal is at 90 degrees to the wall. the other side will then act like a brace. (either screw or joint these and they will carry enough weight.
finally, position a work surface and fit onto the batton at the rear. (if youhave 2 walls in a corner this will be super strong. fasten using "No Nails" or small screws, just enough to hold it in place.
My home computer desk and darage work bench is made this way and ive never had any problems.
Takes about 3 - 4 hours to construct max.
dibbers006 said:
Swilly said:
ALawson said:
Have you got access to BS 5268 Part2 2002?
Im a Chartered Engineer and I advise you consult BS 5950 inorder to ensure the loads you are considering do not cause catastrophic collapse
Example:
'Get some sheet 1" thick to support anything you throw at it

make it 2"inches thick and jobs a gooden'

(i personally wouldn't listen to me)
Oh, and leave a space underneath for a fridge for cold beers

dibbers006 said:
Swilly said:
ALawson said:
Have you got access to BS 5268 Part2 2002?
Im a Chartered Engineer and I advise you consult BS 5950 inorder to ensure the loads you are considering do not cause catastrophic collapse
Example:
'Get some sheet 1" thick to support anything you throw at it


Gassing Station | The Pie & Piston Archive | Top of Page | What's New | My Stuff



