Patios - sand and aggregate.
Patios - sand and aggregate.
Author
Discussion

Davi

Original Poster:

17,153 posts

251 months

Friday 18th July 2008
quotequote all
More stupid questions time...

I need to raise the level of my patio 7 inches, and being the tight git I am want to do it on the cheap. Recent works have left me with three piles of site spoil dug out the ground - course gravel / soil mix (considerably higher gravel and stone content than soil!), clean but possibly rather large chunks of hardcore and a fairly soft sand (tons of the stuff, we are sat on a sand / gravel bed by the look of it).

Mate reckons it's no good, I need to buy "proper" aggregate and "proper sharp sand" - but then he is a money-no-object kind of person with the funds to back that attitude.

I'm thinking sling the hardcore down, compact, cover with the gravel then the sand.

Or is it going to end up being st if I do?




Mighty Mini

46 posts

242 months

Friday 18th July 2008
quotequote all
The hardcore you've got there is probably as good as you'll get from a recycling yard, its commonly known in the westcountry as 'Type 2 aggregate' or 'Pikey Mix' (Type 1 DTP aggregate the better stuff comes straight from the quarries) use it but make sure you dont put too much down at a time, compact it well (with a wacker plate) as you build up the height. I wouldn't use the sand that you've got there as it won't compact very well at all, as your mate has stated Sharp Sand or better still 3mm Grit Sand/ Bideford Grit is the best for laying your slabs on. Hope this helps.

Rav

3,084 posts

261 months

Friday 18th July 2008
quotequote all
I like it......'Pikey Mix'

laugh

ZR1cliff

17,999 posts

280 months

Friday 18th July 2008
quotequote all
As long as you take time to break the bigger lumps down and compact it down well I cant see a problem.

MikeyT

18,523 posts

302 months

Friday 18th July 2008
quotequote all
Get on with it - report back at 5pm when you're done. Should be okay.

Davi

Original Poster:

17,153 posts

251 months

Friday 18th July 2008
quotequote all
MikeyT said:
Get on with it - report back at 5pm when you're done. Should be okay.
hehe it's taken me 5 months to dig it out so far...