Craney boat type thing off the coast of Whitstable??
Craney boat type thing off the coast of Whitstable??
Author
Discussion

croakey

Original Poster:

1,193 posts

217 months

Thursday 25th August 2011
quotequote all
Was out with a friend down Whitstable seafront, and this is moored/parked off the shore.

Its a really poor picture but from where we were it looks like a red catamaran/oil rig/transformer type thing



Any ideas? intrigued

Help me boaty folk smile

Steve_D

13,801 posts

287 months

Thursday 25th August 2011
quotequote all
Is that one of those jobbies for installing windfarm turbines?

Steve

tank slapper

7,949 posts

312 months

Thursday 25th August 2011
quotequote all
It's this: http://www.marinetraffic.com/ais/showallphotos.asp...

It's a jack-up crane barge, so probably involved in wind farm construction or maintenance, but might be something else.

Dogwatch

6,380 posts

251 months

Thursday 25th August 2011
quotequote all
In a couple of weeks you'll have whirling blades all across the horizon. smile

tank slapper

7,949 posts

312 months

Thursday 25th August 2011
quotequote all
They are already there, and have been for some time.

croakey

Original Poster:

1,193 posts

217 months

Thursday 25th August 2011
quotequote all
We thought it was something to do with the windfarm, but it was considerably closer to shore than any of the turbines? Maybe theyre expanding the field of them closer to shore?

Thanks for clearing it up gentlemen

motomk

2,186 posts

273 months

Thursday 25th August 2011
quotequote all
Fugro are involved with survey stuff down in this part of the world??



DH01

820 posts

197 months

Tuesday 13th September 2011
quotequote all
Power export cable is being run from the London Array site( Kentish Knock, 15 mile N of Margate roughly) to the landfall at Cleve Hill, Graveney. Lots going on out there at the moment, surveying, grapple tows, etc.

DH01

820 posts

197 months

Tuesday 20th September 2011
quotequote all
construction at London Array site, the pile is driven into seabed then the yellow `transition piece` sits on top. the whirry windmill bit that allegedly makes electricity then sits on top of the TP.







Stage one of the project is about 170 turbines and should be finished end of 2012.
all told there will be 300 installed making it the biggest offshore windfarm in the world.

fatboy69

9,424 posts

216 months

Tuesday 20th September 2011
quotequote all
Would these be the same type of wind farms that have to be shut down when the wind gets too strong because the high winds are to dangerous.............



DH01

820 posts

197 months

Tuesday 20th September 2011
quotequote all
fatboy69 said:
Would these be the same type of wind farms that have to be shut down when the wind gets too strong because the high winds are to dangerous.............
That`s the ones !
the same ones that are getting billions of UK taxpayers pounds in subsidies to fund construction by companies that pay tax anywhere in the world but here . . .

fatboy69

9,424 posts

216 months

Tuesday 20th September 2011
quotequote all
I thought as much. As usual the British tax-payer gets ripped off in the name of 'saving the planet'.

What a load of bks.

anonymous-user

83 months

Tuesday 20th September 2011
quotequote all
DH01 said:
all told there will be 300 installed making it the biggest offshore windfarm in the world.
which, even when operating at maximum output, will only provide not quite one tenth of the power of a medium sized nuclear plant. but hey, if you think thats "saving the planet" be my guest :-)