Less than a year since last Heathrow snow fiasco
Less than a year since last Heathrow snow fiasco
Author
Discussion

FiF

Original Poster:

49,079 posts

282 months

Saturday 19th January 2013
quotequote all
In Feb 2012 the thread was entitled Heathrow - a disgrace. FWIW the link here

So Friday 400 flights cancelled, people sleeping on the floor.
Today. Saturday over 100 flights cancelled, people still all over the place.
Sunday's schedule is already slashed by 20% so another 400 flights cancelled and people told not to turn up unless they are within two hours of their flight departure. Right, that's going to work well... not.

I was roundly criticised on the Snowmageddon thread for saying that foreigners regard UK ability to deal with snow as a joke, and to be fair I could have phrased it better and kept a mention of Scandinavia out of it.

But near European countries also think we are a joke, eg NL, D. Watching what is a glorified golf cart with a powered brush on the front doing square root of bugger all tends to make one think they are correct.

Yes yes, I know, as discussed nearly at 100% capacity allegedly, but as discussed on that other thread, flights come and go in waves, so what do they mean by at capacity? Runway? Baggage handling? Terminal? Gates? Catering? what?

Once again a mass of passengers pissed off with UK.


MG CHRIS

9,322 posts

198 months

Saturday 19th January 2013
quotequote all
Oh not this st again.

AlexS

1,596 posts

263 months

Saturday 19th January 2013
quotequote all
Most of the cancelled flights are short haul ones to other European destinations, where the destination airport is also having problems with the weather.

Heathrow also operates right at the limit of its capacity. Any thing which slows down departures and landings will always cause some delays as there is no slack in the system.

boxst

3,806 posts

176 months

Saturday 19th January 2013
quotequote all
Well, I'm leaving from San Francisco in a few hours back to Heathrow.

Yesterday it looked as though it would be delayed by 4-5 hours, but at the moment it is on time at 19:45 (from San Francisco). I hope that doesn't change.

HoHoHo

15,407 posts

281 months

Saturday 19th January 2013
quotequote all
Those countries that have lots of snow cope......because they have lots of snow and have to spend money to ensure everything works whilst snow is on the ground.

We have two or three days of snow a year and that's the bottom line.

It's not a problem, it's a few hours delay.

So what!

wolves_wanderer

12,960 posts

268 months

Saturday 19th January 2013
quotequote all
When an airport is at over 98% capacity, closing a runway, even briefly, to clear it will cause chaos. Best to thin the traffic out first.

brenflys777

2,680 posts

208 months

Saturday 19th January 2013
quotequote all
FiF said:
Yes yes, I know, as discussed nearly at 100% capacity allegedly, but as discussed on that other thread, flights come and go in waves, so what do they mean by at capacity? Runway? Baggage handling? Terminal? Gates? Catering? what?

Once again a mass of passengers pissed off with UK.
When you state that the airfield is 'nearly at 100% capacity allegedly' - are you in any doubt that this is true? I ask because it is the nub of the issue, if you normally land 45 aircraft an hour and the wind/visibility/snow reduces that by 5 you have lost over 10%, but you only start with 2% spare. You cannot cut corners to fit more in because people are less safe.

I work at LHR. The airlines have improved their ability to respond, the ATC are the best in the world ( in my experience ) and the airport operator has got better winter equipment than before. It's not perfect but as other people have pointed out with the relatively few number of snow days we have the risk vs. reward pay off to consider.

As for the mass of pissed off passengers, they are being let down, but in the main the responsibility rests with the government for refusing to show some balls and commit to another runway or a new airport.

tr7v8

7,631 posts

259 months

Saturday 19th January 2013
quotequote all
Runways at max capacity so closing runways to allow clearance affects throughput, plus when it is snowing more gap has to be left between taxing aircraft so lower throughput again.
We desperately need more capacity at Heathrow to give more margin. Nowt todo with the airport & everything to do with successive governments & the stupid greenies.

HoHoHo

15,407 posts

281 months

Saturday 19th January 2013
quotequote all
brenflys777 said:
As for the mass of pissed off passengers, they are being let down, but in the main the responsibility rests with the government for refusing to show some balls and commit to another runway or a new airport.
Exactly.

Stop pissing about and build either a new airport or extend Heathrow.

FiF

Original Poster:

49,079 posts

282 months

Saturday 19th January 2013
quotequote all
Well as someone said ."not this again" but that's the point, it's a never ending story that never improves.

If it's not snow it's immigration queues then something else.

As I wrote elsewhere, yes LHR have been presented with a st sandwich by the useless politicians, but how much have the travelling public paid directly through duty and taxes, indirectly through landing charges plus the income with charges for other services for what?

People have a right to feel short changed.

Still not good enough

MitchT

17,170 posts

240 months

Saturday 19th January 2013
quotequote all
The thing that really irks me is this obsession with centering everything on London. If some long haul flights operated out of other UK airports there'd be less operating in and out of LHR and less domestic shuttle flights from regional airports having to operate in and out of LHR too, thus easing capacity. Some joined up thinking between all of the UKs large and regional airports, such that long haul flights and domestic shuttle flights were co-ordinated to provide comprehensive global coverage from around the UK, would ease capacity for the busiest airports and provide more of a margin for absorbing disruption caused by adverse weather.

retrorider

1,339 posts

232 months

Saturday 19th January 2013
quotequote all
Maybe they could build a third runway ? ;o)

Tasmindevil

901 posts

271 months

Saturday 19th January 2013
quotequote all
boxst said:
Well, I'm leaving from San Francisco in a few hours back to Heathrow.

Yesterday it looked as though it would be delayed by 4-5 hours, but at the moment it is on time at 19:45 (from San Francisco). I hope that doesn't change.
I am on the 16.20 out of SFO so one before you, delayed 40 mins so far but seen it land, not sure about the other end as I hop up to Aberdeen then back down again Monday onto Oslo. If I am stuck I am stuck I am not going to loose sleep over it, much rather know that BA are taking no risks

davepoth

29,395 posts

230 months

Saturday 19th January 2013
quotequote all
MitchT said:
The thing that really irks me is this obsession with centering everything on London. If some long haul flights operated out of other UK airports there'd be less operating in and out of LHR and less domestic shuttle flights from regional airports having to operate in and out of LHR too, thus easing capacity. Some joined up thinking between all of the UKs large and regional airports, such that long haul flights and domestic shuttle flights were co-ordinated to provide comprehensive global coverage from around the UK, would ease capacity for the busiest airports and provide more of a margin for absorbing disruption caused by adverse weather.
Thing is, most of the people live near London; some 70% of the population of the UK live within 100 miles of the city. Given that most business travel is to London, it makes sense for the airport to be there.

What we need is a second runway at Gatwick ASAP, possibly by riding roughshod over the covenant they have down there. A second Gatwick runway will possibly have more of an effect than a third runway at Heathrow and crucially the land is available to build it right now without knocking stuff down.

Do the same up at Stansted, and then get the shorthaul shifted out of Heathrow to free up landing slots. That should give ten years of breathing space to decide whether we really do need Boris Island.

172ff

3,777 posts

226 months

Saturday 19th January 2013
quotequote all
retrorider said:
Maybe they could build a third runway ? ;o)
An indoor one to keep the snow off?

elster

17,517 posts

241 months

Sunday 20th January 2013
quotequote all
172ff said:
retrorider said:
Maybe they could build a third runway ? ;o)
An indoor one to keep the snow off?
huh?

Maybe you missed the part of them running at 98% capacity. So the time taken to clear runways causes the delays.

bigee

1,497 posts

269 months

Sunday 20th January 2013
quotequote all
If they built more/another runway,how long before that was also at full capacity? Or do we need an 'extra' extra runway?

Randy Winkman

22,870 posts

220 months

Sunday 20th January 2013
quotequote all
elster said:
172ff said:
retrorider said:
Maybe they could build a third runway ? ;o)
An indoor one to keep the snow off?
huh?

Maybe you missed the part of them running at 98% capacity. So the time taken to clear runways causes the delays.
Why do they run at 98% capacity in January?

thinfourth2

32,414 posts

235 months

Sunday 20th January 2013
quotequote all
meanwhile in a parallel universe


random angry person said:
Why the fk have they wasted so much money on snow clearing equipment for heathrow

It never snows in the UK

Its fking disgrace

The UK is utterly fked

Eric Mc

125,997 posts

296 months

Sunday 20th January 2013
quotequote all
Randy Winkman said:
elster said:
172ff said:
retrorider said:
Maybe they could build a third runway ? ;o)
An indoor one to keep the snow off?
huh?

Maybe you missed the part of them running at 98% capacity. So the time taken to clear runways causes the delays.
Why do they run at 98% capacity in January?
Because their customers demand it - and as a business they have to maximise their activity and incomne at every opportunity. Would you turn customers away?