What valuable lessons have you learned?
Discussion
We're about to embark on a pretty daunting project with our first home and was wondering whether you guys have any tips or advice on effectively starting from scratch. The existing house will be completely gutted and we will restart from a shell, with a 120sqm two storey rear extension being put on the back.
I've read a few self build books, am fairly handy at DIY and have a few trades within the family but this is going to be a massive learning curve I feel.
We've got a very good architect on board and are allowing around two years to do most of the work, which he seems to think is quite sensible. I'm pretty confident that the architect is going to keep us on track with the layout and having a detailed enough specification, I'm more concerned about making sure we get a good deal on materials and select the right finishes.
I've read a few self build books, am fairly handy at DIY and have a few trades within the family but this is going to be a massive learning curve I feel.
We've got a very good architect on board and are allowing around two years to do most of the work, which he seems to think is quite sensible. I'm pretty confident that the architect is going to keep us on track with the layout and having a detailed enough specification, I'm more concerned about making sure we get a good deal on materials and select the right finishes.
One Room at a time. Always finish it.
We bought our house in 1998, and with very little money we replaced all the upstairs windows, knocked down the old garage, gutted the kitchen, refitted the kitchen, fitted laminate flooring down stairs, painted every room in white, extended the base for the new concrete garage. That took 10 solid days and 2 and a half people. (My brother in law came every evening for 3 hours, but I worked from 7am to 9pm every day, and my dad did 10 til 4)
2 Years later we came into some money, took out a small loan and had a loft conversion, which meant that the whole house had to be rewired.
Over the next 9 months, I redecorated each room in sequence.
5 years later we came into some more money, paid off the loan, had a new bathroom fitted.
5 years later we owe £250 on the mortgage.
I might just do the kitchen again, as it's a bit "MFI"
I once went to a mates house and EVERY room was halfway through. They didn't have anywhere to relax.
We bought our house in 1998, and with very little money we replaced all the upstairs windows, knocked down the old garage, gutted the kitchen, refitted the kitchen, fitted laminate flooring down stairs, painted every room in white, extended the base for the new concrete garage. That took 10 solid days and 2 and a half people. (My brother in law came every evening for 3 hours, but I worked from 7am to 9pm every day, and my dad did 10 til 4)
2 Years later we came into some money, took out a small loan and had a loft conversion, which meant that the whole house had to be rewired.
Over the next 9 months, I redecorated each room in sequence.
5 years later we came into some more money, paid off the loan, had a new bathroom fitted.
5 years later we owe £250 on the mortgage.
I might just do the kitchen again, as it's a bit "MFI"
I once went to a mates house and EVERY room was halfway through. They didn't have anywhere to relax.
Do plenty of reading before commencing any work.
Try and plan in advance and have a budget that is realistic.
Buy decent tools.
Anything you can do yourself then do it.
Invest in a decent van and/or trailer as you can take waste to the local tip and collect materials like sand/cement etc... This saves you paying someone to do this.
And the van is somewhere to shelter in the rain or when the misses is on one:-)
Get loads of estimates for every part of your build and when a job deviates from the estimate make sure you are clear on additional costs as it's amazing how it adds up.
Go a speak to suppliers local to you. You may find that they need & want your business so might offer you a discount on everything you buy and even free delivery can work out quite a saving. Some suppliers can aslo give good advice on their products which might save you some time & £££'s
When it all gets too much put the kettle on and chill before you do something you regret.
Good luck
Try and plan in advance and have a budget that is realistic.
Buy decent tools.
Anything you can do yourself then do it.
Invest in a decent van and/or trailer as you can take waste to the local tip and collect materials like sand/cement etc... This saves you paying someone to do this.
And the van is somewhere to shelter in the rain or when the misses is on one:-)
Get loads of estimates for every part of your build and when a job deviates from the estimate make sure you are clear on additional costs as it's amazing how it adds up.
Go a speak to suppliers local to you. You may find that they need & want your business so might offer you a discount on everything you buy and even free delivery can work out quite a saving. Some suppliers can aslo give good advice on their products which might save you some time & £££'s
When it all gets too much put the kettle on and chill before you do something you regret.
Good luck
Avoid B&Q, use local suppliers where you can.
It has to get worse before it gets better.
Make it fit for purpose for however long you expect to be there (I always regret not removing an old chimney breast when everything was stripped back).
You can never have enough sockets.
Pay someone to do the plastering.
Try and set aside a block of time to do the bigger jobs, leaving the odd hour or so after work for painting and suchlike.
It has to get worse before it gets better.
Make it fit for purpose for however long you expect to be there (I always regret not removing an old chimney breast when everything was stripped back).
You can never have enough sockets.
Pay someone to do the plastering.
Try and set aside a block of time to do the bigger jobs, leaving the odd hour or so after work for painting and suchlike.
Cable tester might not be required even though we have one as it needs a complete rewire, all existing external walls dry lined and central heating fitted as it has none!
We will be getting a brickie, plasterer and roofer in but will do everything else ourselves. Well, that's the theory.
We will be getting a brickie, plasterer and roofer in but will do everything else ourselves. Well, that's the theory.
2 valuable lessons from me
Theres always another house.
Theres always another car.
As for your refurb, take your time and do things right, not right now. Save up and buy things you want for the house, if you want a nicer kitchen or bathroom whatever then save up and get it, don't get something cheaper you don't really want just cos you can afford it now. It's a waste of money.
Theres always another house.
Theres always another car.
As for your refurb, take your time and do things right, not right now. Save up and buy things you want for the house, if you want a nicer kitchen or bathroom whatever then save up and get it, don't get something cheaper you don't really want just cos you can afford it now. It's a waste of money.
I'd kinda’ go along with that. Either buy the best or the cheapest.
I knocked down and rebuilt from scratch. There are various figures relating to contingency funds bandied about. Double whatever figure you consider reasonable. Also, when a roofer says it'll take 7 days to finish a job, ask how long those 7 days will be spread over!
In case you missed it (and can be arsed to read it) > http://www.stevecarter.com/build/build.htm
I knocked down and rebuilt from scratch. There are various figures relating to contingency funds bandied about. Double whatever figure you consider reasonable. Also, when a roofer says it'll take 7 days to finish a job, ask how long those 7 days will be spread over!
In case you missed it (and can be arsed to read it) > http://www.stevecarter.com/build/build.htm
elanfan said:
Think I saw somewhere recently that someone built their extension with a gap between it and the main house and it then qualified as a new build and therefore VAT free. Once complete they just joined it together.
If they did then they'd be liable for the VAT for ten years, on a sliding scale; 90% of the VAT after 1 year to 10% of the VAT after 9 years.Gassing Station | Homes, Gardens and DIY | Top of Page | What's New | My Stuff