covmutley said:
I'd pretty upset if that was more than 45k, assuming no roof alterations
Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
You’ve missed the cost of the professional fees, structural works, steels and fire doors to the rest of the house.Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
smokey mow said:
covmutley said:
I'd pretty upset if that was more than 45k, assuming no roof alterations
Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
You’ve missed the cost of the professional fees, structural works, steels and fire doors to the rest of the house.Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
We just paid £80k in Kent - included an en suite, two dormers and replacing the remainder of the original roof.
Thanks all so far, yes the quote was £52k, never done anything like this before so only had what was online to go on.
Not sure about en suites, I don’t like them in general and if we had one here it would mean we had 4 toilets and 2 en-suites in what is currently a 2.5 bed 800sqft house, seems overkill
Not sure about en suites, I don’t like them in general and if we had one here it would mean we had 4 toilets and 2 en-suites in what is currently a 2.5 bed 800sqft house, seems overkill
We are in the South West
2018 we paid £17K for a strucural conversion which included £1K for steels, £3K for a cabrio Velux and a lead dressed dormer for the stairs
For the latter we had the oak made to match exisiting and paid £700 for fitting
I did the floor, stud walls and insulation
Plasterboarding and skim (2 weeks) was £2K
Electrics £1200
1st fix plumbing £900
Gross area 850sqft and we had an ensuite
Old and new stairs

Dormer

2018 we paid £17K for a strucural conversion which included £1K for steels, £3K for a cabrio Velux and a lead dressed dormer for the stairs
For the latter we had the oak made to match exisiting and paid £700 for fitting
I did the floor, stud walls and insulation
Plasterboarding and skim (2 weeks) was £2K
Electrics £1200
1st fix plumbing £900
Gross area 850sqft and we had an ensuite
Old and new stairs
Dormer
covmutley said:
I'd pretty upset if that was more than 45k, assuming no roof alterations
Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
I can’t see stairs being more than £2k, plaster about £2k, insulation and boarding £5k, 2 extra rads £1500Stairs 5k
Plasterboard, insulation and boarding out 10k
Plastering 5k
Electrics 5k
Radiator 3k
Velux 2k
Labour 15k
It seems like 90k is the benchmark for east London now for the big firms.
I paid 32.5k for an L shaped loft in 2017 which when tiled and carpeted came In at 36k or so with professional fees.
I paid Under 40 for a standard dormer in 2022 finished tiled and carpeted with professional fees but he did me a good deal.
Id say 50k is a good price these days unfortunately.
I paid 32.5k for an L shaped loft in 2017 which when tiled and carpeted came In at 36k or so with professional fees.
I paid Under 40 for a standard dormer in 2022 finished tiled and carpeted with professional fees but he did me a good deal.
Id say 50k is a good price these days unfortunately.