Plastering ensuite ceilings.
Plastering ensuite ceilings.
Author
Discussion

Too Late

Original Poster:

5,150 posts

262 months

Tuesday 26th May
quotequote all
Hi all
We are at the point of having the bedrooms plastered. We have quoted to get the ensuite ceilings done, I just need to fit lighting and extractor points.

I am now doubting having the ensuites done since they are only at 1st fix.
Plumbing is terminated behind plaster. No sinks, shower trays or concealed shower mixers installed

When is the right time to plaster. Now or leave it to fit the concealed shower mixer and tray in place?

Thanks

netherfield

3,140 posts

211 months

Tuesday 26th May
quotequote all
Our had a skim over because of a different lighting arrangement, holes filled in and new holes made, the plasterer had the chance to do his job without the shower screen being in his way, tray was down already, but no cabinet or sinks fitted, and the loo was about the very last thing.

kambites

71,228 posts

248 months

Tuesday 26th May
quotequote all
Why would the ceiling affect the shower tray and plumbing? confused

I'd definitely get the ceiling finished before touching the "furniture". Plastering around an already-fitted shower cubicle sounds like a nightmare!

OutInTheShed

14,055 posts

53 months

Tuesday 26th May
quotequote all
There's no value in plastering behind tiles or shower wallboards, cupboards, mirrors etc.
Not sure it's even worthwhile on a ceiling if the boarding has been done nicely.
I didn't realise this place hadn't been skimmed until I started changing light s etc.
Jointed plaster board looking fine after 25 years or so.

wolfracesonic

9,090 posts

154 months

Tuesday 26th May
quotequote all
Absolutely before all the fixtures and fittings go in, your plasterer will thank you for it. Possibly cheaper if he doesn’t have to cover everything in Antinox.

JoshSm

4,501 posts

64 months

Tuesday 26th May
quotequote all
OutInTheShed said:
There's no value in plastering behind tiles or shower wallboards, cupboards, mirrors etc.
Not sure it's even worthwhile on a ceiling if the boarding has been done nicely.
I didn't realise this place hadn't been skimmed until I started changing light s etc.
Jointed plaster board looking fine after 25 years or so.
Tape & joint gives a perfectly good surface on a taper edge board, in theory better than skimming for less effort and skill. Skimming is an option but it certainly isn't necessary if the boarding was any good.

You rarely want to tile onto a skimmed surface, it just doesn't have the load capacity.

Only place I'm doing any skimming with my weekend projects is onto existing solid walls where it's the only option to refinish them. That's after grinding out the massive variation the original person created - it's smooth-ish but it's a million miles away from flat.


Anyway yes sort the ceilings before fit out, lot easier to work and easier to clean.