One for the plumbers out there
One for the plumbers out there
Author
Discussion

E-bmw

Original Poster:

13,363 posts

181 months

Friday 11th September
quotequote all
I am currently re-plumbing the full central heating circuit of our house to remove the micro-bore and have a question.

Why is there a 15mm gate valve between the supply & return UNDER the floorboards?

Is it to aid quick filling/draining or commissioning?

I ask because as it was below the (chipboard) floorboards it wasn't actually accessible, and am wondering if it is needed.

Mr Pointy

13,344 posts

188 months

Friday 11th September
quotequote all
If all the radiators have TRVs & there is no towel rail it may be a bypass circuit in case all the TRVs close at the same time.

Gone fishing

8,167 posts

153 months

Friday 11th September
quotequote all
Are you sure its a simple gate valve and not a bypass valve? Its probably to allow water to recirculate when all the radiators are turned off..

If it is just a gate valve and you open it fully you'll find nothing gets warm, Close it fully and you have no bypass and the pump won't thank you when the valves are all shut. A proper bypass valve is more expensive but if you're doing the work it would be worth fitting one.

JoshSm

5,013 posts

66 months

Friday 11th September
quotequote all
A 15mm gate is never going to flow enough to stop everything else working but it's a clunky way to do it compared to the traditional way like using a towel rail for that job or having a proper pressure controlled bypass.

Big issue with anything in a heating system is it getting blocked over time which is why a simple option like an open loop via a towel rail is the easy option as it's the least likely to fail.

Does seem a bit odd and unnecessary to bury it under the floor whatever it's trying to do though.

E-bmw

Original Poster:

13,363 posts

181 months

Friday 11th September
quotequote all
Thanks all, it makes sense that all are saying basically the same in one way or another.

I will be making the bathroom an open loop so it sounds like I don't need to refit it.

g7jtk

1,843 posts

183 months

Friday 11th September
quotequote all
If you are replacing the whole system and boiler then any bypass would be fitted elsewhere on the system.