3 bed bungalow, currently a shell, full central heating to rads, external floor-mounted oil boiler plus all plumbing to kitchen and two bathrooms. I've just been quoted 90 hours labour at £38.50 per hour plus VAT. About right? Or not?

Ricky_M

6,618 posts

241 months

Sunday 21st March 2010
quotequote all
Depends what materials have been specced. Plastic pipe is a lot quicker to fit than copper.

You could first fix a central heating sytem for a 3 bed house in a day, using plastic pipe and two men.

Copper would take a lot longer to do. But then copper fittings are cheaper than plastic fittings.

rovermorris999

Original Poster:

5,312 posts

211 months

Sunday 21st March 2010
quotequote all
All copper I believe.
It's a full replumb, all hot and cold water from the stopcock onwards.

Engineer1

10,486 posts

231 months

Sunday 21st March 2010
quotequote all
It would also depend on the routing, is the kitchen close to the bathroom and the boiler? what is the house layout?

DrDeAtH

3,676 posts

254 months

Sunday 21st March 2010
quotequote all
just remember.... mice cant eat copper pipe.... they like plastic though......