Yup, that's what M4 users are in for on the way to the big smoke as roadworks (an oxymoron if ever there was one as there wasn't a soul to be seen amongst the cone highway) are back with a vengeance.

Why the hell does it take Britain's civil engineers half a year to do some repairs (or raise the armco height by 4mm or something like that) and the US can rebuilt entire motorways after an earthquake in a fortnight?

This country is pathetic.

CarZee

13,382 posts

298 months

Wednesday 30th April 2003
quotequote all
Well, I don't know how it's running so far on the M4, but when they resurfaced the M3 last year, it was all down to narrow lanes and contraflows yet there was rarely any change from the normal flow of traffic through the section (and indeed, appoaching it).

plotloss

67,280 posts

301 months

Wednesday 30th April 2003
quotequote all
It amused me yesterday as I was crawling through this.

Sign 1: Expect delays until August

Sign 2: Roadworks here for 20 weeks

Now, at the end of April, 20 weeks I make closer to October than August!

Its not too bad really, I have been through it twice now, last night and this morning and its moved just.

Why we cant insist on all roadworks being done at night and made good during the day like the Americans I have no idea.

MAtt.

anonymous-user

85 months

Wednesday 30th April 2003
quotequote all
Have they rebuilt the Chiswick flyover yet? I seem to recall it had concrete cancer or somesuch and had to be replaced. Now that will be some tailback when that mother comes down.

plotloss

67,280 posts

301 months

Wednesday 30th April 2003
quotequote all

paul-b said: Have they rebuilt the Chiswick flyover yet? I seem to recall it had concrete cancer or somesuch and had to be replaced. Now that will be some tailback when that mother comes down.


Please please please please tell me that this is not the case.

I expect to see London crippled if they have to knock that down.

Matt.

MikeyT

18,523 posts

302 months

Wednesday 30th April 2003
quotequote all

plotloss said:
Why we cant insist on all roadworks being done at night and made good during the day like the Americans I have no idea.



Cos they'll all want triple time or summat and the Govt will whack another few pence on the old fuel to pay for it (or not).

We had some road works near us recently and that was done at night - which was strange cos it's not that busy during the day - only at rush hours time.

You can still stand there with your shovel smoking a fag *looking* like you're doing summat in the dead of night of course. It's just nicer on triple time!

Zod

35,295 posts

289 months

Wednesday 30th April 2003
quotequote all
I think it is just the single lane flyover by the Porsche garage that has trouble, not the Hammersmith monster.

stig

Original Poster:

11,823 posts

315 months

Wednesday 30th April 2003
quotequote all
The effect would be much the same Zod

swilly

9,699 posts

305 months

Wednesday 30th April 2003
quotequote all
It takes so long in the UK because there are not enough bank holidays available to do the work on.

the jiffle king

7,551 posts

289 months

Wednesday 30th April 2003
quotequote all

plotloss said: It amused me yesterday as I was crawling through this.

Sign 1: Expect delays until August

Sign 2: Roadworks here for 20 weeks

Now, at the end of April, 20 weeks I make closer to October than August!

Its not too bad really, I have been through it twice now, last night and this morning and its moved just.

Why we cant insist on all roadworks being done at night and made good during the day like the Americans I have no idea.

MAtt.


I have taken to going to junction 8/9 and then getting on the motorway. I might have to resort to going to work at 7am ish if it gets too busy though as the jump onto the motorway is horrendous at junction 6.




markda

836 posts

289 months

Wednesday 30th April 2003
quotequote all

Why the hell does it take Britain's civil engineers half a year to do some repairs (or raise the armco height by 4mm or something like that) and the US can rebuilt entire motorways after an earthquake in a fortnight?

This country is pathetic.


Eh?! Most of the roads in the San Francisco bay area are appauling. No wonder they all drive SUV's over there, you need them just to drive on the Hwy 101.

plotloss

67,280 posts

301 months

Wednesday 30th April 2003
quotequote all

the jiffle king said:
I have taken to going to junction 8/9 and then getting on the motorway. I might have to resort to going to work at 7am ish if it gets too busy though as the jump onto the motorway is horrendous at junction 6.



I leave at 6.45 and its not too bad at J6. About 7.30 though the relief road must be murder.

Its a bit worse coming home, J6 is pretty much crawling at 5pm.

Matt.

stig

Original Poster:

11,823 posts

315 months

Wednesday 30th April 2003
quotequote all
Time to get the bike out of the garage I reckon!

RichardR

2,907 posts

299 months

Wednesday 30th April 2003
quotequote all

the jiffle king said:I have taken to going to junction 8/9 and then getting on the motorway.
For sure, the stretch between 10 and 8/9 going east is a bitch in the mornings. Definitely worth sticking on the back roads to 8/9.

bobski

1,589 posts

295 months

Wednesday 30th April 2003
quotequote all
Do you mean the "temporary" one that's been there since the 1970's? It was only there for one year - but they kept it! I even cycled over it once - fine piece of engineering and great view


Zod said: I think it is just the single lane flyover by the Porsche garage that has trouble, not the Hammersmith monster.