Dartford Crossing "Revised Operations Trial'...
Discussion
Highways Agency said:
The revised arrangements which are being trialled for six months from July 1 2011 set out the conditions which have to exist for a senior HA official to consider whether the Dartford Crossing charge can be suspended on a case by case basis.
The conditions are that there has been or is likely to be an emergency situation, where continuous queues extend back - or have the potential to extend back - to the junctions 4 or 28 of the M25 or beyond, and where the suspension of the charge would ease the congestion and assist in managing the emergency situation.
Rest of article here...The conditions are that there has been or is likely to be an emergency situation, where continuous queues extend back - or have the potential to extend back - to the junctions 4 or 28 of the M25 or beyond, and where the suspension of the charge would ease the congestion and assist in managing the emergency situation.
PDF here...
So if I'm reading that right, if the traffic is backed up four junctions in either direction, then they can scrap the tolls to ease congestion.
I always thought they contended that congestion would be worse without the tolls and this was the main reason for not scrapping them?
It's a step in the right direction though...
bobbylondonuk said:
Or implement a toll pass technology for frequent users
There is already the Dart Tag system (bit like an Oyster Card). But some clever person decided to remove the dedicated toll lane, so now anyone who has one is stuck in the traffic with everyone else, removing much of the point of having one (aside from slightly lower charges). 
Gassing Station | General Gassing | Top of Page | What's New | My Stuff


