Discussion
Has anyone got any pictures of the header tank installed.
Had mine delivered from Pro-Alloy yesterday and easily removed the old one. But, I'm assuming it bolts on to the box section above the fuel tank and the silly spindly bracket next to the engine which looks like it needs bending to suit.
However, assuming that is correct, the fixing holes on the header tank are too far apart, the large pipe at the bottom is strained to get it onto the feed pipe and the two pipes at the top don't line up, I have to admit I've only had a quick look but I can't see as though I've missed anything.
Had mine delivered from Pro-Alloy yesterday and easily removed the old one. But, I'm assuming it bolts on to the box section above the fuel tank and the silly spindly bracket next to the engine which looks like it needs bending to suit.
However, assuming that is correct, the fixing holes on the header tank are too far apart, the large pipe at the bottom is strained to get it onto the feed pipe and the two pipes at the top don't line up, I have to admit I've only had a quick look but I can't see as though I've missed anything.
Firstly did you get this tank as part of the PA group buy? I haven't even had an invoice or a link to make payment or anything yet. And second, if it's not a direct replacement and is sold as such, why don't you get in touch with them and ask for another? I'm sure they'll be willing to help or at the least be interested in the feedback!
Gassing Station | Noble | Top of Page | What's New | My Stuff



I understand production began on the tanks yesterday!