Whilst I'm at it...
Discussion
All now done, perfect timing with the current hot weather here..
Whilst the box was out I replaced the rubber fuel injection hoses that connect to the fuel rail on the engine, access was really easy, as opposed to almost impossible when the gearbox is in place, these hoses do sometimes breakdown due to the high engine bay temperatures and if anyone else is taking the gearbox out for any reason it is well worth doing.
Cheers Andy
Whilst the box was out I replaced the rubber fuel injection hoses that connect to the fuel rail on the engine, access was really easy, as opposed to almost impossible when the gearbox is in place, these hoses do sometimes breakdown due to the high engine bay temperatures and if anyone else is taking the gearbox out for any reason it is well worth doing.
Cheers Andy
Gassing Station | Chimaera | Top of Page | What's New | My Stuff


