Body Off - Any Ideas for Things to Do?
Discussion
TVR Power are going to be doing a body lift on the 450 to replace outriggers, sort chassis generally and re-spray front. Just wondered if anyone has ideas on what other 'improvements' I could consider while body is off?
Car is a 2000 model with about 40+K on the clock...
I have already had Steve Heath drop links, Gaz shocks and Willwood front brake upgrades.
TVR Power suggest doing fuel hoses...any other thoughts?
Thanks...
Car is a 2000 model with about 40+K on the clock...
I have already had Steve Heath drop links, Gaz shocks and Willwood front brake upgrades.
TVR Power suggest doing fuel hoses...any other thoughts?
Thanks...
Brake lines, fuel pipes, and the diff bush. 
When mines being done over winter theses are on the list, although my brake lines have already been done.
I'm also thinking about a light upgrade. Lupo up front, TVR late spec to the rear to give me a visual indication where all my money went.

When mines being done over winter theses are on the list, although my brake lines have already been done.

I'm also thinking about a light upgrade. Lupo up front, TVR late spec to the rear to give me a visual indication where all my money went.

Gassing Station | Chimaera | Top of Page | What's New | My Stuff




