Hi All,

Over the last couple of years I have been invloved in a small development project in Kent.

In order to get the sign-off certificate from building control, I have to get the above done.

However, the building control have set a tightness of 4, which from phoning around a few local companies, they all tell me this is going to be very very difficult to achieve. Especially as we have completed the project and have the flats for sale.

I mean if the test is higher than 4 then we might have to rip out the kitchen and check for air-leaks behind the units/skirting boards?!

HELP.
IceBoy

PS, on top of this they have requested that I have a 0.5 KW peak solar energy? I dont, even know what this means....THIS IS MY FIRST EVER PROJECT and the flats look beautiful, have all the other regs, except the above.

V8mate

45,899 posts

220 months

Friday 3rd May 2013
quotequote all
Ohhhhhh!

Jacobyte

4,768 posts

273 months

Friday 3rd May 2013
quotequote all
V8mate said:
Ohhhhhh!
<snigger>

insurance_jon

4,099 posts

277 months

Friday 3rd May 2013
quotequote all
so you want making airtight?



vescaegg

30,757 posts

198 months

Friday 3rd May 2013
quotequote all
4 is pretty low to be honest but we have achieved that in the past with some of our houses.

Just make sure you seal up EVERYTHING to make it as airtight as possible. Its a bit of a rip off to be honest because its not really indicative of the state of the building in reality.

Have a look at these checklists of things to do prior to having the tests done;

http://www.airtest.org.uk/text/Air%20Tightness%20C...
http://www.a1airtesting.co.uk/checklist.html
http://labcwarranty.co.uk/media/33367/md_pass_-_la...


Depending on how many types of units there are (dwelling types), you either have to test all of each type or 50% of each type minimum (I think) - but if you only test 50% they assume the other ones to be worse and add 2m3/hr to the scores. So youll need to get a 2m3/hr on the first 50% for the second half to work - near enough impossible id say.

Hope the above makes sense!

Id highly recommend 'Building Analysis and Testing Limited' in Bristol (they travel everywhere) and will advise on the best parts to test if you send them plans etc.

Edited by vescaegg on Friday 3rd May 17:10

muppetdave

2,118 posts

256 months

Friday 3rd May 2013
quotequote all
Re: the solar, were SBEM calculations not given to you/undertaken at PP stage? 0.5 is not difficult - two panels nowadays, although is that allowance per flat?

dasherdiablo1

4,518 posts

252 months

Sunday 5th May 2013
quotequote all
insurance_jon said:
so you want making airtight?
I was thinking it was going to be about some chaps wife that the OP had been having fun with involving a couple of mates....filthy minded..... I apologise for lowering the tone ;0)

irishbloke

75 posts

168 months

Friday 17th May 2013
quotequote all
4 really isn't that difficult with a little attention to detail. Easier in a timber frame property but managed 2.1 in my standard block built property. Just need attention to detail and lots of squinty foam. Tape around windows, floor and wall junctions, iartightness barrier/foil back board taped on ceilings upstairs and remember to seal any conduit/down lights etc