Contracts for Building Subbies
Discussion
I'm shortly going to start a nine house development on my redundant industrial estate. My own company which has always been in the Construction Industry as a Steel and Timber Fabrication Specialist will act as the Main Contractor and I will be using mostly Sub Contractors for the work.
I've always been on the other side of the fence regarding contracts and have signed many of them having been a Sub Contractor on small and large construction projects. Most of the Sub Contractors will probably be people that I know through the Industry but as I well know there are no friends in business.
I'm just at the stage of getting prices at the moment but I'm thinking about when I appoint Sub Contractors and whether I should just rely on their quotations based on my specs, tie them into complicated contracts or to draft some sort of simple agreement, which is what I favour at the moment.
Does anyone have any opinions or know of a simple form of contract that I could use?
I've always been on the other side of the fence regarding contracts and have signed many of them having been a Sub Contractor on small and large construction projects. Most of the Sub Contractors will probably be people that I know through the Industry but as I well know there are no friends in business.
I'm just at the stage of getting prices at the moment but I'm thinking about when I appoint Sub Contractors and whether I should just rely on their quotations based on my specs, tie them into complicated contracts or to draft some sort of simple agreement, which is what I favour at the moment.
Does anyone have any opinions or know of a simple form of contract that I could use?
Hi, been on the other fence myself (like yourself), there is no way that I would consider doing what you were about to venture in without employing a QS to sort out the contracts etc. I would suggest going with a JCT contract, most likely Minor Works but it depends on the size and complexity of the build, especially if there is design involved.
Make sure you get good references of all your subbies first also!
Good Luck, hope it works out for you!
Make sure you get good references of all your subbies first also!
Good Luck, hope it works out for you!
Get contracts drawn up. A 9 house development is large enough to warrant it. There will be extras and arguments and verbal anything means it didn't happen as far as most are concerned.
You could use a JCT subcontract form for the subbies.
Who is the client if you are the main contractor? If there is design by the main contractor a design and build contract can be used or maybe just an intermediate contract with contractors design portion.
You could use a JCT subcontract form for the subbies.
Who is the client if you are the main contractor? If there is design by the main contractor a design and build contract can be used or maybe just an intermediate contract with contractors design portion.
Contracts are all very well but I would say that unless you had a properly procured package and you know exactly what you have bought from each Sub-Contractor you could come unstuck.
The form of contract will not necessarily help when it comes to you agreeing a scope / package and if (when) you have a subbie that says 'that's not in my scope' you'll have arguments.
Not meaning to tout myself out but if you do need professional help please PM me.
The form of contract will not necessarily help when it comes to you agreeing a scope / package and if (when) you have a subbie that says 'that's not in my scope' you'll have arguments.
Not meaning to tout myself out but if you do need professional help please PM me.
Gorgonzola said:
Hi, been on the other fence myself (like yourself), there is no way that I would consider doing what you were about to venture in without employing a QS to sort out the contracts etc. I would suggest going with a JCT contract, most likely Minor Works but it depends on the size and complexity of the build, especially if there is design involved.
Make sure you get good references of all your subbies first also!
Good Luck, hope it works out for you!
Exactly this, get a QS as it'll save you far more than their costs in the long run, a good one will even help you out with legals, planning etc.Make sure you get good references of all your subbies first also!
Good Luck, hope it works out for you!
I know of a very good one that operates in the south if your located around here, currently assisting with a similar sized development in S London so has the experience etc.
PM me for details
As per the above but def get a QS involved, even if it is on a part service basis. This will cost you much less than you will lose by QS'ing yourself. It also has the benefit of reducing the possibility of falling out with old muckers with whom you have worked in the past. I have a QS who has worked with me on various projects over the last 25 years and he also does small housing developments. He is around the Oxted/Westerham area. PM me if you are interested.
I can only agree with whats been said so far, a contract is great to have in place, but if there is no detail behind the contract then its still going to end in an arguement.
do you have a bill of quantities for the project? are you happy to split this into work packages to send out for tendering? who has written the spec for whats to be installed?
its all very good having a joiner quote you for installing 'doors', but having it itemised that you want: 2100x900mm solid wood 6 panel door, with 30min fire rating, including spec 'abc' iron mongery, installed, including all door frames ( 20x40mm finished timber) facings, skirting boards etc.......
then do you want this painted or do you want this left for the decorator?
sorry to be pedantic, going into a 9 house development you probably know most of this. but these are the levels of details having a QS on board can iron out
do you have a bill of quantities for the project? are you happy to split this into work packages to send out for tendering? who has written the spec for whats to be installed?
its all very good having a joiner quote you for installing 'doors', but having it itemised that you want: 2100x900mm solid wood 6 panel door, with 30min fire rating, including spec 'abc' iron mongery, installed, including all door frames ( 20x40mm finished timber) facings, skirting boards etc.......
then do you want this painted or do you want this left for the decorator?
sorry to be pedantic, going into a 9 house development you probably know most of this. but these are the levels of details having a QS on board can iron out
Gassing Station | Business | Top of Page | What's New | My Stuff


