Building new offices on mezzanine.
Discussion
We are planning to build around 4 new offices/meeting rooms on top of some new mezzanine flooring in our warehouse.
Rather than using stud and plasterboard can anyone suggest alternative materials that are quick, and attractive when finished. Eg wall segments, some half glazed, a few doors and a suspended ceiling. And as cheap as possible of course!
Also is there a simple design tool that helps work out the best layout for office interiors?
Thanks.
Rather than using stud and plasterboard can anyone suggest alternative materials that are quick, and attractive when finished. Eg wall segments, some half glazed, a few doors and a suspended ceiling. And as cheap as possible of course!
Also is there a simple design tool that helps work out the best layout for office interiors?
Thanks.
http://cgi.ebay.co.uk/Pre-Fabricated-office-x2-Rea...
We had some like this, they were great and when we re-located we just took them down and used them again. The beauty is that they can be used in any configuration.
The £8000 is a bit (very) mental but haggle away.
You will probably need flooring as well.
We had some like this, they were great and when we re-located we just took them down and used them again. The beauty is that they can be used in any configuration.
The £8000 is a bit (very) mental but haggle away.
You will probably need flooring as well.
I don't want to advertise, but office interiors are what we do.
Have a look at demountable partitions, they are quick to install, can include the glazed, part glazed panels, doors etc.
Happy to design the layout for you, if you let me know how much space you have, how many staff and what their desk space / storage requirements are.
Have a look at demountable partitions, they are quick to install, can include the glazed, part glazed panels, doors etc.
Happy to design the layout for you, if you let me know how much space you have, how many staff and what their desk space / storage requirements are.
Idly points out that the OP will need to watch out for an increase in the business rates following the installation of a mezzanine floor! In most cases storage mezzanines are valued at 20% of the ground floor storage spaces, but offices on mezzanines can be valued at 120% of the ground floor rate.
The good news is that you have no responsiblity to tell the Valuation Officer about the changes, but worth being aware of the issue, especially if you are considering appealling against the RV.
The good news is that you have no responsiblity to tell the Valuation Officer about the changes, but worth being aware of the issue, especially if you are considering appealling against the RV.
We use demountable steel partitions for offices on the ground floor and mezz floors. Quick, easy, relatively cheap and they don't look too bad when finished. We use a few different makes depending on what we need. Norwood and Thrislington are two manufacturers we've used recently but there are several around. If you don't fancy steel then we've also occassionally used a modular glass and plasterboard panel system which turned out well. Can't remember the manufacturer now, but can check at work tomorrow if necessary.
Also, depending on the building layout, if it's in a warehouse area, you will probably need a 1 hour fire separation wall up to the roof line along the edge of the mezzanine floor to satisfy Building Regulations.
Mezzanines and factory conversions are what we do, pm me if you're interested, we are very competitive.
Mezzanines and factory conversions are what we do, pm me if you're interested, we are very competitive.
Just thinking outloud so to speak, how many occupants do you envisage being in the offices? Is their an additional escape route now or planned? or will it be the stairs within the warehouse? Just thinking you will have to consider suitable protection of the escape route in the event of fire, if their is an external stairway / escape route bear in mind that if it is within 1.8 meters of any windows they would have to be fire rated and not be of the opening kind, again to afford protection of the escape route.
In addition what lighting is provided, borrowed etc, you may have to look at emergency escape lighting etc, any lone working after hours upstairs? How is a fire detected etc Lots to think about. After completion it would be prudent to update or have a new fire risk assessment to replace the one have now
so that you still comply with the fire safety order. A new assessment will look at escape distances, lighting amongst other things.Gassing Station | Business | Top of Page | What's New | My Stuff