dcw@pr said:
i'm trying to find out if some land is a decent place to put a turbine or two - proper sized ones.
that rules me out as am involved in offshore side as for "cash in" it is veeerrrrrry costly start up, saying that there are several land based ones in norfolk, sorry cannot be of more helpdcw@pr said:
i'm trying to find out if some land is a decent place to put a turbine or two - proper sized ones.
You don't need a wind turbine expert, as such, you need an expert in Planning who has experience of wind turbine applications.The planning hurdles you'll face are truly extraordinary.
I've just been instrumental in getting an application near me refused (not that I'm anti wind turbine, you understand - just that SWMBO and the local NIMBY's nagged me to the point where it wasn't worth fighting any more); I know the hurdles the applicant jumped through, therefore, and the level of detail on their application, and it still didn't help them.
If you're serious (and trust me, if you're just looking for an easy way to make a quick buck, forget it - you're probably looking at a 6-figure sum to put together the technical information to support the planning application, unless you've got an exceptional - uncontroversial - location), PM me and I can point you in the direction of some of the Planning and design guidance you'll need to understand to get past first base.
Edited by Sam_68 on Tuesday 24th November 18:05
henna777 said:
dcw@pr said:
i'm trying to find out if some land is a decent place to put a turbine or two - proper sized ones.
that rules me out as am involved in offshore side as for "cash in" it is veeerrrrrry costly start up, saying that there are several land based ones in norfolk, sorry cannot be of more helpas far as I can tell it's about £2m for a 2MW turbine onshore, does that sound roughly correct?
dcw@pr said:
henna777 said:
dcw@pr said:
i'm trying to find out if some land is a decent place to put a turbine or two - proper sized ones.
that rules me out as am involved in offshore side as for "cash in" it is veeerrrrrry costly start up, saying that there are several land based ones in norfolk, sorry cannot be of more helpas far as I can tell it's about £2m for a 2MW turbine onshore, does that sound roughly correct?
If you send me details of the site i.e. a google satellite image with the site boundary marked on it as well as the postcode and your approximate annual electricity spend. I can get a "desktop" study done for free this will take about 2 weeks to turnaround. If initial indications are that the site is suitable then it will proceed to a more detailed desktop study, then site survey etc, etc.
The basic rules are:
1) More than 500m from any residential premises
2) More than 120m from a motorway
3) More than 10km from an airport
4) Must not interfere with any MOD lines of site/microwave lines
These are for large on-shore wind turbines. The Wind company will own the turbine hence it is 100% free to you and you get the benefit of wind power electricity but the wind company retains the excess generated and sells the excess back to the grid which is how it makes it's money. The Wind Company also deals with all planning issues.
The basic rules are:
1) More than 500m from any residential premises
2) More than 120m from a motorway
3) More than 10km from an airport
4) Must not interfere with any MOD lines of site/microwave lines
These are for large on-shore wind turbines. The Wind company will own the turbine hence it is 100% free to you and you get the benefit of wind power electricity but the wind company retains the excess generated and sells the excess back to the grid which is how it makes it's money. The Wind Company also deals with all planning issues.
I was involved in a consortium a few years ago that bought some windfarms in Germany and Italy and we used Garrad Hassan to predict the power they would produce http://www.garradhassan.com/
They weren't cheap, their numbers turned out to be off by about 20% (obviously they overstated!) but it's an inexact science and these guys still have the name as the best in the business.
They weren't cheap, their numbers turned out to be off by about 20% (obviously they overstated!) but it's an inexact science and these guys still have the name as the best in the business.
My other half works for a planning consultancy who do a lot of feasibility studies for Windfarms. She seems to have work constantly on them for the past 2 years.
It's a long detailed and expensive process, the reports have to be very detailed , even down to specifying the settings on the camera when your taking pictures for the document.
If you want to send me a pm I can put you in touch.
It's a long detailed and expensive process, the reports have to be very detailed , even down to specifying the settings on the camera when your taking pictures for the document.
If you want to send me a pm I can put you in touch.
Mr Overheads said:
If you send me details of the site i.e. a google satellite image with the site boundary marked on it as well as the postcode and your approximate annual electricity spend. I can get a "desktop" study done for free this will take about 2 weeks to turnaround. If initial indications are that the site is suitable then it will proceed to a more detailed desktop study, then site survey etc, etc.
The basic rules are:
1) More than 500m from any residential premises
2) More than 120m from a motorway
3) More than 10km from an airport
4) Must not interfere with any MOD lines of site/microwave lines
These are for large on-shore wind turbines. The Wind company will own the turbine hence it is 100% free to you and you get the benefit of wind power electricity but the wind company retains the excess generated and sells the excess back to the grid which is how it makes it's money. The Wind Company also deals with all planning issues.
thanks for this, did you get my email?The basic rules are:
1) More than 500m from any residential premises
2) More than 120m from a motorway
3) More than 10km from an airport
4) Must not interfere with any MOD lines of site/microwave lines
These are for large on-shore wind turbines. The Wind company will own the turbine hence it is 100% free to you and you get the benefit of wind power electricity but the wind company retains the excess generated and sells the excess back to the grid which is how it makes it's money. The Wind Company also deals with all planning issues.
Gassing Station | Business | Top of Page | What's New | My Stuff