What valuable lessons have you learned?
What valuable lessons have you learned?
Author
Discussion

Muncher

Original Poster:

12,235 posts

280 months

Thursday 24th November 2011
quotequote all
We're about to embark on a pretty daunting project with our first home and was wondering whether you guys have any tips or advice on effectively starting from scratch. The existing house will be completely gutted and we will restart from a shell, with a 120sqm two storey rear extension being put on the back.

I've read a few self build books, am fairly handy at DIY and have a few trades within the family but this is going to be a massive learning curve I feel.

We've got a very good architect on board and are allowing around two years to do most of the work, which he seems to think is quite sensible. I'm pretty confident that the architect is going to keep us on track with the layout and having a detailed enough specification, I'm more concerned about making sure we get a good deal on materials and select the right finishes.

thinfourth2

32,414 posts

235 months

Thursday 24th November 2011
quotequote all
Consider a refurbishment/extension has 20% vat on it

A knock down and rebuild is zero vat rated

Muncher

Original Poster:

12,235 posts

280 months

Thursday 24th November 2011
quotequote all
Yep, but what is there is structurally good and you'd be unlikely to get permission to knock it down anyway.

Chris Peacock

820 posts

239 months

Thursday 24th November 2011
quotequote all
Off topic.........


Never watch your mum eat a banana.



Sorry......





RichB

56,536 posts

315 months

Thursday 24th November 2011
quotequote all
Always paint the ceiling before doing the walls. smile

New POD

3,851 posts

181 months

Thursday 24th November 2011
quotequote all
One Room at a time. Always finish it.

We bought our house in 1998, and with very little money we replaced all the upstairs windows, knocked down the old garage, gutted the kitchen, refitted the kitchen, fitted laminate flooring down stairs, painted every room in white, extended the base for the new concrete garage. That took 10 solid days and 2 and a half people. (My brother in law came every evening for 3 hours, but I worked from 7am to 9pm every day, and my dad did 10 til 4)

2 Years later we came into some money, took out a small loan and had a loft conversion, which meant that the whole house had to be rewired.

Over the next 9 months, I redecorated each room in sequence.

5 years later we came into some more money, paid off the loan, had a new bathroom fitted.

5 years later we owe £250 on the mortgage.

I might just do the kitchen again, as it's a bit "MFI"

I once went to a mates house and EVERY room was halfway through. They didn't have anywhere to relax.

Jefftav

137 posts

204 months

Thursday 24th November 2011
quotequote all
Do plenty of reading before commencing any work.
Try and plan in advance and have a budget that is realistic.
Buy decent tools.
Anything you can do yourself then do it.
Invest in a decent van and/or trailer as you can take waste to the local tip and collect materials like sand/cement etc... This saves you paying someone to do this.
And the van is somewhere to shelter in the rain or when the misses is on one:-)
Get loads of estimates for every part of your build and when a job deviates from the estimate make sure you are clear on additional costs as it's amazing how it adds up.
Go a speak to suppliers local to you. You may find that they need & want your business so might offer you a discount on everything you buy and even free delivery can work out quite a saving. Some suppliers can aslo give good advice on their products which might save you some time & £££'s
When it all gets too much put the kettle on and chill before you do something you regret.
Good luck

elanfan

5,527 posts

258 months

Thursday 24th November 2011
quotequote all
Think I saw somewhere recently that someone built their extension with a gap between it and the main house and it then qualified as a new build and therefore VAT free. Once complete they just joined it together.

ukwill

10,291 posts

238 months

Thursday 24th November 2011
quotequote all

add at least 50% to any perceived project cost.

jj333

442 posts

190 months

Thursday 24th November 2011
quotequote all
Avoid B&Q, use local suppliers where you can.
It has to get worse before it gets better.
Make it fit for purpose for however long you expect to be there (I always regret not removing an old chimney breast when everything was stripped back).
You can never have enough sockets.
Pay someone to do the plastering.
Try and set aside a block of time to do the bigger jobs, leaving the odd hour or so after work for painting and suchlike.


russ_a

4,731 posts

242 months

Thursday 24th November 2011
quotequote all
Rent somewhere else to live if renovating!

Paul Drawmer

5,172 posts

298 months

Thursday 24th November 2011
quotequote all
Invest in a cable finder. Now you've got it, use it. The time you don't test, will be the time there's a live cable there.

Muncher

Original Poster:

12,235 posts

280 months

Thursday 24th November 2011
quotequote all
Cable tester might not be required even though we have one as it needs a complete rewire, all existing external walls dry lined and central heating fitted as it has none!

We will be getting a brickie, plasterer and roofer in but will do everything else ourselves. Well, that's the theory.

Smiler.

11,752 posts

261 months

Thursday 24th November 2011
quotequote all
For such a large project, consider co-ordination of the services (elec, plumbing etc) before any work commences. Create a set of plans & talk your proposals over with known quality tradesmen. PM me if you want any advice smile

amirzed

1,793 posts

207 months

Friday 25th November 2011
quotequote all
2 valuable lessons from me

Theres always another house.

Theres always another car.

As for your refurb, take your time and do things right, not right now. Save up and buy things you want for the house, if you want a nicer kitchen or bathroom whatever then save up and get it, don't get something cheaper you don't really want just cos you can afford it now. It's a waste of money.

GetCarter

31,352 posts

310 months

Friday 25th November 2011
quotequote all
I'd kinda’ go along with that. Either buy the best or the cheapest.

I knocked down and rebuilt from scratch. There are various figures relating to contingency funds bandied about. Double whatever figure you consider reasonable. Also, when a roofer says it'll take 7 days to finish a job, ask how long those 7 days will be spread over!

In case you missed it (and can be arsed to read it) > http://www.stevecarter.com/build/build.htm

Arthur Jackson

2,111 posts

261 months

Friday 25th November 2011
quotequote all
Plastic plumbing is second rate. Do it properly, use copper. Equally, 15mm is a minimum size for heating pipes.

rsv gone!

11,288 posts

272 months

Friday 25th November 2011
quotequote all
elanfan said:
Think I saw somewhere recently that someone built their extension with a gap between it and the main house and it then qualified as a new build and therefore VAT free. Once complete they just joined it together.
If they did then they'd be liable for the VAT for ten years, on a sliding scale; 90% of the VAT after 1 year to 10% of the VAT after 9 years.

Wings

5,985 posts

246 months

Friday 25th November 2011
quotequote all
Always fixed the top back on to an electric plug, before plugging the same into a live socket, otherwise you get a nasty shock.

Skyedriver

23,777 posts

313 months

Friday 25th November 2011
quotequote all
ukwill said:
add at least 50% to any perceived project cost.
Or budget properly in the first place