Stone tiles on freshly skimmed walls?
Discussion
I hope the wall will take that kind of tile.
If its just skimmed then a few days it will be dry, you'll soon tell.
Even if the adhesive says non-primer i suggest still primimg with something like http://www.tileadhesive.co.uk/acrilic-bonding.html
If its just skimmed then a few days it will be dry, you'll soon tell.
Even if the adhesive says non-primer i suggest still primimg with something like http://www.tileadhesive.co.uk/acrilic-bonding.html
Plaster is NOT a suitable substrate for fixing 12mm stone to. You may get away with it you may not. You should have saved the time and money by fixing directly onto bare plasterboard.
Trust me the Missus works here..............
http://www.mandarinstone.com/fixing_sealing
Trust me the Missus works here..............
http://www.mandarinstone.com/fixing_sealing
dickymint said:
Plaster is NOT a suitable substrate for fixing 12mm stone to. You may get away with it you may not. You should have saved the time and money by fixing directly onto bare plasterboard.
But are they plasterboard or block walls?I had both when doing my bathroom (12mm stone); blockwork was skimmed and plasterboard primed directly. I was careful to do it by the book and use the recommended primer and adhesive. IIRC the weight is about 22kg/m2 and I didn't want that falling on me! Six years on and it's fine.
Simpo Two said:
dickymint said:
Plaster is NOT a suitable substrate for fixing 12mm stone to. You may get away with it you may not. You should have saved the time and money by fixing directly onto bare plasterboard.
But are they plasterboard or block walls?I had both when doing my bathroom (12mm stone); blockwork was skimmed and plasterboard primed directly. I was careful to do it by the book and use the recommended primer and adhesive. IIRC the weight is about 22kg/m2 and I didn't want that falling on me! Six years on and it's fine.
dickymint said:
Correct assuming your blockwork was skimmed with cement render and not Gypsum Plaster.
Hmm, having checked the photos it's the slightly pink stuff which I deduce is wrong... and the guy knew what I was going to tile with. On one side I'd damaged the surface so much when taking the old tiles off that the plasterer said he couldn't skim it... to my slight alarm he opted for plasterboard with (generous) dot and dab. But it worked.The problem I have is as mentioned above. The state the walls are in having removed an airing cupboard and the previous tiles were floor to ceiling so the walls are now a bit buggered.
As I'm only tiling to waist height and top half has to be skimmed. But it still leaves the lower half that is a skimmed plasterboard or plastered blockwork already??
Oh it was the guys at Mandarin Stone that raised this issue.
As I'm only tiling to waist height and top half has to be skimmed. But it still leaves the lower half that is a skimmed plasterboard or plastered blockwork already??
Oh it was the guys at Mandarin Stone that raised this issue.
Hi Hoon,
Dickymint is correct re the weight issue. Have a browse here for some idea as to the weight limits for various substrates, http://www.classical-flagstones.co.uk/CatalogData/...
Remember that it's not just the weight of the tiles but also the adhesive and grout that you have to factor in. The limits as you can imagine probably have a fairly wide safety margin built in but I wouldn't push my luck going too far over them.
regards
jeff
Dickymint is correct re the weight issue. Have a browse here for some idea as to the weight limits for various substrates, http://www.classical-flagstones.co.uk/CatalogData/...
Remember that it's not just the weight of the tiles but also the adhesive and grout that you have to factor in. The limits as you can imagine probably have a fairly wide safety margin built in but I wouldn't push my luck going too far over them.
regards
jeff
quick update.
Everyone I spoke to said not a good idea to put stone on the fresh skim.
Decided to skim down to the stone level only. Where the ceiling high stone was going in the shower area I stripped the old plasterboard and replace with the cement based stuff. Room is coming on nicely now. Cheers guys

Everyone I spoke to said not a good idea to put stone on the fresh skim.
Decided to skim down to the stone level only. Where the ceiling high stone was going in the shower area I stripped the old plasterboard and replace with the cement based stuff. Room is coming on nicely now. Cheers guys

Gassing Station | Homes, Gardens and DIY | Top of Page | What's New | My Stuff