... and this year's Christmas work list includes....
... and this year's Christmas work list includes....
Author
Discussion

Mr Cerbera

Original Poster:

5,151 posts

259 months

Friday 9th December 2011
quotequote all
1. Try and correctly fit my sports silencers and new (thanks to FYP) centre exhaust section.
(OMG, another 10 days under the Axle stands with a broken back)
2. Fit the Carbon facia
(OMG, the path of the Water Temp feed pipe)
3. Massage the Chassis
4. Cry about the roofline where it nears the rear window.
5. Try to connect the rear window heater matrix
(never been connected since I've owned her)
6. Drool wink

....and You ??

Wishing you all a Fab Festive Season from Li'l Ole Luxy beer

Edited by Mr Cerbera on Friday 9th December 16:53

FUBAR

17,065 posts

267 months

Friday 9th December 2011
quotequote all
1) Replace the water pipes - Contracted out
2) Replace the heater knob back panel (been meaning to do this for 7 years) - Contracted out
3) Investigate the heating/aircon (hot air blows in through passenger outlet and aircon is woeful again) - Contracted out
4) Clean it - Contracted out.
5) Drive it when it's dry - not contracted out.

Mr Cerbera

Original Poster:

5,151 posts

259 months

Friday 9th December 2011
quotequote all
FUBAR said:
1) Replace the water pipes - Contracted out
2) Replace the heater knob back panel (been meaning to do this for 7 years) - Contracted out
3) Investigate the heating/aircon (hot air blows in through passenger outlet and aircon is woeful again) - Contracted out
4) Clean it - Contracted out.
5) Drive it when it's dry - not contracted out.
A man totally at one....
.... with his cheque book wink

spongy

2,236 posts

190 months

Friday 9th December 2011
quotequote all
1.paint
2.clean
3.paint
4.sand
5.clean
6.paint
7.oh yeah when the bloody paint arrives that is.
8.and start to put back together again
9.eat
10.paint
11.swear
12 Drinkbiggrin

Mr Cerbera

Original Poster:

5,151 posts

259 months

Friday 9th December 2011
quotequote all
spongy said:
1.paint
2.clean
3.paint
4.sand
5.clean
6.paint
7.oh yeah when the bloody paint arrives that is.
8.and start to put back together again
9.eat
10.paint
11.swear
12 Drinkbiggrin
Have to say that The Spongy Project has been one of the top threads this year.
Well done that man !

thumbup

spongy

2,236 posts

190 months

Friday 9th December 2011
quotequote all
Thankyou sir.....it still goes on and i think will be a life long job;)Piccys this weekend of white paint,and it may be on the chassiseek

scotty_d

6,795 posts

223 months

Friday 9th December 2011
quotequote all
You did have to ask and it is some list i can tell you. Ok here goes....


Chassis clean up i am stripping the rear wish bones off first cleaning all the back end up, get it re-painted. I HATE waxoil rank stuff but getting there slowly. will be at this for a good few weeks but there is good metal under it all.



Wish bones will be shot blasted next week by my father and he is re-building my shocks too for a grand total of a few quid for the cost of the new seals so good having a father who re-builds Hydraulic cylinders for a living just now as well as 40 years experience as a mechanical engineer. smile


So they will look like new after a shot blast and paint. Then when the back is done start all over on the front end lol.

I hate the bodge home made cack exhaust that is on the car so i took a trip down to see Willie at http://meercat-exhausts.com/aboutus.htm So he will be making a thing of beauty and it will sound spot on when it comes back. (He did a system for my old jag in 316 stainless and it looked and sounded stunning.

some shots of the old system going for a cat back at the moment might junk the cats


I will be only replacing bushs that need it and most will be standard rubber as the roads are to crap to have polly all round as i found with my old chim it was just to hard on the road and i like the way the car rides as is hence getting the shock re-furbed over going for new ones. All the rears in the wish bones seem good with no play so i will leave them be.

The polly ones are front and rear ARB ones so don't mind them being a bit stiffer And brand new bolt set for everthing underside thanks to Steve Heath again smile



Ok list to do.

Car wont turn over either Immob or wiring break down somewhere will get round to it later. And this is why its getting a full off the road winter work over.

New alternator+ Belt as the old ones shaft was bent??? no idea how. Got it like this.
12K service full tappets chims ect ect.
Fix diff leak, the drain plug is weeping so a Dowty washer i hope.
Inlets Being ported and Gas flowed And will be powder coated gold when they come back. Barry at TVR Ecosse Thanks again smile
Painted my rockers and made a cam retaining tool as well not the best thing i could have came up with but it work non the less.
Rocker done in crackle paint i quite like them.
braided stainless brake hoses and change fuel lines and all clips and just bling the engine bay out a bit.
Re-trim steering wheel




Every bracket that has came off has been shot blasted and painted and that goes with every bolt that i can use stainless steel ones to replace has i hate rust!!!




And at the end buy some rubber and fit these bad boys along with the new nuts i have for them



Then get the car re-mapped by joo in the spring i hope (still need to book it in)


And later on time for a full re-spray and colour change i am thinking jaguar racing green like racing greens sag???

Not quite Christmas more like 4 months of work oh i do love TVR's and this is the second time i have done all this to one the joy's lol

And when the car is done, finish my coffee table laugh



I know there is loads more but this off the top of my head for now.






Edited by scotty_d on Friday 9th December 18:18

spongy

2,236 posts

190 months

Friday 9th December 2011
quotequote all
Lol bud it is worth it in the end,....i think.That sure reminds me of my first chassis shots.goodluck bud do you think our wifey tags think we will home for the break to go shopping etc......nooooooooo way ive put the tree up and that is it for mebeer

scotty_d

6,795 posts

223 months

Friday 9th December 2011
quotequote all


It is worth it i told the gf to give me a shout in 4 months time lol

spongy

2,236 posts

190 months

Friday 9th December 2011
quotequote all
scotty_d said:
It is worth it i told the gf to give me a shout in 4 months time lol
Mine shouts at me all the timepunch

gruffalo

8,150 posts

255 months

Friday 9th December 2011
quotequote all
Retrim of the interior done the FUBAR way
Wheels acid dipped and redone in shaddow chrome to be done the FUBAR way
Spank it when it is warm and dry enough....me!

DAVEY DEE

647 posts

183 months

Friday 9th December 2011
quotequote all
Everything on my list I think will also be done "Way of the Fubar" ,who I might add is becoming a bit of a Yoda figure to me.I would try & do it myself, but as Fubar might say -" do or do not.There is no try!"

robsco

7,875 posts

205 months

Friday 9th December 2011
quotequote all
Reseal rear lenses.
Fix awful water leak NS footwell.
Front end respray, clear indicators and side repeaters (booked in).
Source turned aluminium dash and heater control.
Reinvestigate woeful handbrake strength.
Source a more antisocial sports exhaust (current sports exhaust with decats is still quite quiet).

esso

1,849 posts

246 months

Friday 9th December 2011
quotequote all
Strip all the suspension,powder coat,new bushes,paint chassis,rebuilt shocks with new springs,new ball joints,new drop links,uprated diff mount with poly bushes,new front brake discs and pads,service,full geo setup,fix handbrake,speedo and wiper park switch.............all done....early Christmas present!

Tanguero

4,535 posts

230 months

Friday 9th December 2011
quotequote all
  1. Engine out
  2. Body lift
  3. Strip chassis
  4. Add seat supports so the rest of the seat bolts go through something more than just fibreglass
  5. Hot zinc spray chassis
  6. Powder coat chassis
  7. Rebuild gearbox (synchro on 2nd is going)
  8. Front oil seals on engine
  9. Replace front brake disks
  10. Refurbish rear brake callipers
  11. Reassemble!

Byker28i

91,477 posts

246 months

Saturday 10th December 2011
quotequote all
scotty_d said:
And when the car is done, finish my coffee table laugh

A quick suggestion having done this a couple of times before. If you laquer the engine parts it stops it going rusty. Barrels are a good wine bottle store, or put some LED lighting in the bottom. Ikea sell some cabinet lights that are flat and round and barrel size. Glue the glass top onto the pistons. I used 4 blogs of clear hot glue gun on each piston.

RUSSELLM

6,002 posts

276 months

Saturday 10th December 2011
quotequote all
1) Ring up valeter to ask him to come & clean the car
2) Put the car cover on(Myself)
3) Board plane to Tenerife

Bish Bash Bosh

scotty_d

6,795 posts

223 months

Saturday 10th December 2011
quotequote all
Byker28i said:
A quick suggestion having done this a couple of times before. If you laquer the engine parts it stops it going rusty. Barrels are a good wine bottle store, or put some LED lighting in the bottom. Ikea sell some cabinet lights that are flat and round and barrel size. Glue the glass top onto the pistons. I used 4 blogs of clear hot glue gun on each piston.
I think i will use your ikea lighting idea as i wanted to do this any way. My plan is to shot blast it again , Prim and spray it a bright silver and use the valves as feet. Need to pull finger out and just get on with it but the TVR is taking all my free time up just now.

pmessling

2,318 posts

232 months

Saturday 10th December 2011
quotequote all
Finish making new water pipes, so far so good, made a pipe beading tool to bead the ends,



(ACT ones top, mine at the bottom


Rest of the components to make up the pipes, including bosses for the sensors and gauge


Up grade to a SPA dual guage

paint cam covers,

Silicon hoses

Clean and adjust steering UJ's getting notchy

remove all suspension again and paint ( didn't have time when i poly bushed it this year)

Fit new fuel pump bracket

Sure i'll think or find more.

BHardy

467 posts

287 months

Saturday 10th December 2011
quotequote all
Just some minor bits and pieces:

1) Stainless heater / expansion tank pipes (ACT)
2) Stainless braided brake hoses
3) Aircon condensor & drier
4) Sparkplugs & filters
5) Fuelpump
6) Refurb steering rack

And then some :-)